996 resultados para flood requirements


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In 2005, the Victorian government asked the Victorian Environmental Assessment Council (VEAC) to 1) identify and evaluate the extent, condition, values, management, resources and uses of riverine red gum forests and associated fauna, wetlands, floodplain ecosystems and vegetation communities in northern Victoria; and 2) make recommendations relating to the conservation, protection and ecological sustainable use of public land. The design of a comprehensive, adequate and representative (CAR) reserve system was a key part of the recommendations made by VEAC. In order to assist in the decision-making for environmental water allocation for protected areas and other public land, a process for identifying flood-dependent natural values on the Victorian floodplains of the River Murray and its tributaries was developed.

Although some areas such as the Barmah forest are very well known, there have been few comprehensive inventories of important natural values along the Murray floodplains. For this project, VEAC sought out and compiled data on flood requirements (natural flood frequency, critical interval between floods, minimum duration of floods) for all flood-dependent ecological vegetation classes (EVCs) and threatened species along the Goulburn, Ovens, King and Murray Rivers in Victoria. The project did not include the Kerang Lakes and floodplains of the Avoca, Loddon and Campaspe Rivers. 186 threatened species and 110 EVCs (covering 224,247 ha) were identified as flood-dependent and therefore at risk from insufficient flooding.

Past environmental water allocations have targeted a variety of different natural assets (e.g. stressed red gum trees, colonial nesting waterbirds, various fish species), but consideration of the water requirements of the full suite of floodplain ecosystems and significant species has been limited. By considering the water requirements of the full range of natural assets, the effectiveness of water delivery for biodiversity can be maximised. This approach highlights the species and ecosystems most in need of water and builds on the icon sites approach to view the Murray floodplains as an interconnected system. This project also identified for the first time the flood-frequency and duration requirements for the full suite of floodplain ecosystems and significant species.

This project is the most comprehensive identification of water requirements for natural values on the floodplain to date, and is able to be used immediately to guide prioritisation of environmental watering. As more information on floodplain EVCs and species becomes available, the water requirements and distribution of values can be refined by ecologists and land and water managers. That is, the project is intended as the start of an adaptive process allowing for the incorporation of monitoring and feedback over time. The project makes it possible to transparently and easily communicate the extent to which manipulated or natural flows benefit various natural values. Quantitative and visual outputs such as maps will enable environmental managers and the public to easily see which values do and do not receive water (see http://www.veac.vic.gov.au/riverredgumfinal.htm for further details).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Large overbank flood events play an important role in maintaining largescale ecological processes and connectivity along and across the floodplains and between the rivers and their floodplains in the southern Murray-Darling Basin. However, the regulation of rivers means that extensive overbank flooding can only occur in the rare circumstance of extreme flood events. Recent environmental water allocations have focussed on the largest floodplain blocks (‘icon’ sites) and a small set of specific values (e.g. colonial nesting waterbirds), as well as on trialling fine-scale manipulation of infrastructure (e.g. pumping) to water relatively small areas. There has been no comprehensive systematic assessment of the entire floodplain and its wider set of flood-dependent natural assets (such as ecosystems and species; herein referred to as ‘natural values’) to maximise the effectiveness of environmental water use and to catalogue values likely to be lost. This paper describes an assessment of some 220 000 ha found to support flood-dependent natural values in Victoria. We mapped the geographic distribution and estimated components of the flooding requirements (natural flooding frequency, and maximum period without flooding and minimum duration of each flooding event before significant deterioration) for each natural value. Using an example of one stretch of the River Murray, we show how the resultant spatial data can be used with floodplain inundation modelling to compare the outcomes of real or planned environmental watering events; potentially providing tools for management agencies to conserve a wider range of floodplain values than is currently the case. That is, water managers and the public can see what ecosystems and threatened species are intended to be maintained by environmental watering and what values are intended to be abandoned across the whole floodplain, rather than just seeing the small subset of values and ‘icon’ sites that are intended to be maintained. Examples are provided to illustrate how information about the location, water requirements and extent covered by potential floods for specific values can be used to build adaptive watering strategies for areas as large as the whole floodplain.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Overbank flooding of rivers is a key process in the maintenance of vegetation types and the species that rely on the floodplain forests and woodlands of northern Victoria. Yet the flooding requirements of species and vegetation types are poorly known. Here we present initial estimates of the water requirements for flood dependent Ecological Vegetation Classes (EVCs) and rare and threatened flora and fauna species associated with the floodplain of the Murray River and its tributaries. Some 110 EVCs were found to be at least partly flood-dependent on the Murray River floodplains. The total current extent of these EVCs in the study area is 224 247 ha, of which 162 266 ha are on public land. One hundred and twenty-four rare or threatened plant taxa and 62 threatened vertebrate fauna taxa (excluding fish) were classified as at least partly flood-dependent. These initial estimates provide important information for land and water managers and researchers alike.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In ecosystems driven by water availability, plant community dynamics depend on complex interactions between vegetation, hydrology, and human water resources use. Along ephemeral rivers—where water availability is erratic—vegetation and people are particularly vulnerable to changes in each other's water use. Sensible management requires that water supply be maintained for people, while preserving ecosystem health. Meeting such requirements is challenging because of the unpredictable water availability. We applied information gap decision theory to an ecohydrological system model of the Kuiseb River environment in Namibia. Our aim was to identify the robustness of ecosystem and water management strategies to uncertainties in future flood regimes along ephemeral rivers. We evaluated the trade-offs between alternative performance criteria and their robustness to uncertainty to account for both (i) human demands for water supply and (ii) reducing the risk of species extinction caused by water mining. Increasing uncertainty of flood regime parameters reduced the performance under both objectives. Remarkably, the ecological objective (species coexistence) was more sensitive to uncertainty than the water supply objective. However, within each objective, the relative performance of different management strategies was insensitive to uncertainty. The ‘best’ management strategy was one that is tuned to the competitive species interactions in the Kuiseb environment. It regulates the biomass of the strongest competitor and, thus, at the same time decreases transpiration, thereby increasing groundwater storage and reducing pressure on less dominant species. This robust mutually acceptable strategy enables species persistence without markedly reducing the water supply for humans. This study emphasises the utility of ecohydrological models for resource management of water-controlled ecosystems. Although trade-offs were identified between alternative performance criteria and their robustness to uncertain future flood regimes, management strategies were identified that help to secure an ecologically sustainable water supply.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Understanding the life-history attributes of aquatic species is integral to the development of environmental-flow strategies in regulated river systems. This is particularly important when species are under continual and increasing pressure from water-resource development. In this study, the water temperature and flow requirements for spawning of the Fitzroy River golden perch (Macquaria ambigua oriens) were investigated over 4 years at 22 sites in the Fitzroy River catchment. Eggs, larvae and young-of-year (YOY) M. ambigua oriens were sampled on a variety of flow events to determine the environmental requirements for spawning. Eggs and larvae of M. ambigua oriens were detected during natural flow events generally with a minimum of 1.5 m river rise and duration of 7 days. Spawning was associated with the peak and/or recession of the first or second post-winter flow event where water temperatures exceeded 248 degrees C. Our data suggests that it is important to protect a range of flows, not just flood flows, as previously documented for this species. The interaction of spawning flows with existing and future water-resource development should be considered to ensure maintenance of the population viability of M. ambigua oriens.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The study examines the integration of cultural, economic and environmental requirements for fish production in Borno State, Nigeria. A reconnaissance survey was conducted transferring some selected Local Government Areas. 60 questionnaires were administered in the six Local Governments representing Southern Borno State with Biu and Shani, central Borno with Konduga & Jere and Northern Borno with Gubia and Kukawa respectively. There is no cultural constraint to fish production but about 63% prefers to invest in other farming activities than in fish farming. 33% are not aware that fish can be cultured apart from getting it from the wild. 35% have the impression that fish farming ventures can be handled by government only. The economic earnings for fish production are high especially in some parts of Northern Borno, but the Local market potentials throughout the state are great. Nigeria has suitable soil for ponds apart from few locations at the central and Northern Borno that are made by sandy soil. Numerous perennial and seasonal rivers, streams, lakes, pools and flood plains adequate for fish culture especially in Southern Borno exist. The mean annual rainfall can result in some water storage in ponds. In areas where the annual precipitation is less than 550mm, exist few flow boreholes with potentials for fish production. The temperature regime may support growth and survival of fish even during the hottest months of the year (March, April and May). With the understanding and manipulation of these requirements, fish production in Nigeria can be greatly enhanced

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For at least two millennia and probably much longer, the traditional vehicle for communicating geographical information to end-users has been the map. With the advent of computers, the means of both producing and consuming maps have radically been transformed, while the inherent nature of the information product has also expanded and diversified rapidly. This has given rise in recent years to the new concept of geovisualisation (GVIS), which draws on the skills of the traditional cartographer, but extends them into three spatial dimensions and may also add temporality, photorealistic representations and/or interactivity. Demand for GVIS technologies and their applications has increased significantly in recent years, driven by the need to study complex geographical events and in particular their associated consequences and to communicate the results of these studies to a diversity of audiences and stakeholder groups. GVIS has data integration, multi-dimensional spatial display advanced modelling techniques, dynamic design and development environments and field-specific application needs. To meet with these needs, GVIS tools should be both powerful and inherently usable, in order to facilitate their role in helping interpret and communicate geographic problems. However no framework currently exists for ensuring this usability. The research presented here seeks to fill this gap, by addressing the challenges of incorporating user requirements in GVIS tool design. It starts from the premise that usability in GVIS should be incorporated and implemented throughout the whole design and development process. To facilitate this, Subject Technology Matching (STM) is proposed as a new approach to assessing and interpreting user requirements. Based on STM, a new design framework called Usability Enhanced Coordination Design (UECD) is ten presented with the purpose of leveraging overall usability of the design outputs. UECD places GVIS experts in a new key role in the design process, to form a more coordinated and integrated workflow and a more focused and interactive usability testing. To prove the concept, these theoretical elements of the framework have been implemented in two test projects: one is the creation of a coastal inundation simulation for Whitegate, Cork, Ireland; the other is a flooding mapping tool for Zhushan Town, Jiangsu, China. The two case studies successfully demonstrated the potential merits of the UECD approach when GVIS techniques are applied to geographic problem solving and decision making. The thesis delivers a comprehensive understanding of the development and challenges of GVIS technology, its usability concerns, usability and associated UCD; it explores the possibility of putting UCD framework in GVIS design; it constructs a new theoretical design framework called UECD which aims to make the whole design process usability driven; it develops the key concept of STM into a template set to improve the performance of a GVIS design. These key conceptual and procedural foundations can be built on future research, aimed at further refining and developing UECD as a useful design methodology for GVIS scholars and practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Natural disasters are events that cause general and widespread destruction of the built environment and are becoming increasingly recurrent. They are a product of vulnerability and community exposure to natural hazards, generating a multitude of social, economic and cultural issues of which the loss of housing and the subsequent need for shelter is one of its major consequences. Nowadays, numerous factors contribute to increased vulnerability and exposure to natural disasters such as climate change with its impacts felt across the globe and which is currently seen as a worldwide threat to the built environment. The abandonment of disaster-affected areas can also push populations to regions where natural hazards are felt more severely. Although several actors in the post-disaster scenario provide for shelter needs and recovery programs, housing is often inadequate and unable to resist the effects of future natural hazards. Resilient housing is commonly not addressed due to the urgency in sheltering affected populations. However, by neglecting risks of exposure in construction, houses become vulnerable and are likely to be damaged or destroyed in future natural hazard events. That being said it becomes fundamental to include resilience criteria, when it comes to housing, which in turn will allow new houses to better withstand the passage of time and natural disasters, in the safest way possible. This master thesis is intended to provide guiding principles to take towards housing recovery after natural disasters, particularly in the form of flood resilient construction, considering floods are responsible for the largest number of natural disasters. To this purpose, the main structures that house affected populations were identified and analyzed in depth. After assessing the risks and damages that flood events can cause in housing, a methodology was proposed for flood resilient housing models, in which there were identified key criteria that housing should meet. The same methodology is based in the US Federal Emergency Management Agency requirements and recommendations in accordance to specific flood zones. Finally, a case study in Maldives – one of the most vulnerable countries to sea level rise resulting from climate change – has been analyzed in light of housing recovery in a post-disaster induced scenario. This analysis was carried out by using the proposed methodology with the intent of assessing the resilience of the newly built housing to floods in the aftermath of the 2004 Indian Ocean Tsunami.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this article is to improve the communication of the probabilistic flood forecasts generated by hydrological ensemble prediction systems (HEPS) by understanding perceptions of different methods of visualizing probabilistic forecast information. This study focuses on interexpert communication and accounts for differences in visualization requirements based on the information content necessary for individual users. The perceptions of the expert group addressed in this study are important because they are the designers and primary users of existing HEPS. Nevertheless, they have sometimes resisted the release of uncertainty information to the general public because of doubts about whether it can be successfully communicated in ways that would be readily understood to nonexperts. In this article, we explore the strengths and weaknesses of existing HEPS visualization methods and thereby formulate some wider recommendations about the best practice for HEPS visualization and communication. We suggest that specific training on probabilistic forecasting would foster use of probabilistic forecasts with a wider range of applications. The result of a case study exercise showed that there is no overarching agreement between experts on how to display probabilistic forecasts and what they consider the essential information that should accompany plots and diagrams. In this article, we propose a list of minimum properties that, if consistently displayed with probabilistic forecasts, would make the products more easily understandable. Copyright © 2012 John Wiley & Sons, Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A flood warning system incorporates telemetered rainfall and flow/water level data measured at various locations in the catchment area. Real-time accurate data collection is required for this use, and sensor networks improve the system capabilities. However, existing sensor nodes struggle to satisfy the hydrological requirements in terms of autonomy, sensor hardware compatibility, reliability and long-range communication. We describe the design and development of a real-time measurement system for flood monitoring, and its deployment in a flash-flood prone 650 km2 semiarid watershed in Southern Spain. A developed low-power and long-range communication device, so-called DatalogV1, provides automatic data gathering and reliable transmission. DatalogV1 incorporates self-monitoring for adapting measurement schedules for consumption management and to capture events of interest. Two tests are used to assess the success of the development. The results show an autonomous and robust monitoring system for long-term collection of water level data in many sparse locations during flood events.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A team of extension livestock specialists and county extension workers collected 362 forage samples from cooperating producers in 55 Iowa Counties. Summaries of the three forage types showed normal feed analysis for energy and protein. Micro minerals were also analyzed with 11% of samples being below National Research Council 1984 selenium and zinc requirements for beef.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Self-adaptation is emerging as an increasingly important capability for many applications, particularly those deployed in dynamically changing environments, such as ecosystem monitoring and disaster management. One key challenge posed by Dynamically Adaptive Systems (DASs) is the need to handle changes to the requirements and corresponding behavior of a DAS in response to varying environmental conditions. Berry et al. previously identified four levels of RE that should be performed for a DAS. In this paper, we propose the Levels of RE for Modeling that reify the original levels to describe RE modeling work done by DAS developers. Specifically, we identify four types of developers: the system developer, the adaptation scenario developer, the adaptation infrastructure developer, and the DAS research community. Each level corresponds to the work of a different type of developer to construct goal model(s) specifying their requirements. We then leverage the Levels of RE for Modeling to propose two complementary processes for performing RE for a DAS. We describe our experiences with applying this approach to GridStix, an adaptive flood warning system, deployed to monitor the River Ribble in Yorkshire, England.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The UK has experienced a number of flood events in recent years, and the intensity and frequency of such events are forecast to further increase in future due to changing climatic conditions. Accordingly, enhancing the resilience of small and medium-sized enterprises (SMEs) – which form an important segment in a society – to flood risk, has emerged as an important issue. However, SMEs often tend to underestimate the risk of flooding which tends to have a low priority in their business agenda. The purpose of this paper is to undertake an investigation of adaptation to the risk of flooding considering community-level measures, individual-level property protection, and business continuity and resilience measures. Design/methodology/approach – A total of four short case studies were conducted among SMEs to identify their response to flood risk, and what measures have been undertaken to manage the risk of flooding. Findings – It was observed that SMEs have implemented different property-level protection measures and generic business continuity/risk management measures, based on their requirements, to achieve a desired level of protection. Practical implications – SMEs are likely to positively respond to property-level adaptation following a post-flood situation. It is important that information such as costs/benefits of such measures and different options available are made accessible to SMEs affected by a flood event. Social implications – Implementation of property-level adaptation measures will contribute towards the long term adaptation of the existing building stock to changing climatic conditions. Originality/value – The paper contributes towards policy making on flood risk adaptation and SME decision making, and informs policy makers and practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent policy changes in the UK encourage at-risk communities to learn to live with and adapt to flooding. Adaptation of individual properties by embracing resilient and resistant measures is an important aspect endorsed therein. Uptake of such protection measures by property owners, including that of Small and Medium-sized Enterprises (SMEs), has traditionally been low. A post-flood situation offers an opportunity to reinstate / reconstruct by integrating flood protection measures, in such a way that reduce damage and enhance the ability to recover in the event of a future flood incidence. In order to investigate the reinstatement / reconstruction experiences of flood affected SMEs, those affected by the 2009 Cockermouth flood event were studied. The results of a questionnaire survey revealed that many SMEs have opted for traditional reinstatement rather than resilient reinstatement. A detailed case study revealed requirements of getting the business back and running as soon as possible, a lack of guidance and advice from professionals and financial concerns as some of the barriers faced by SMEs. It is important that SMEs are provided with necessary guidance during the post-flood reinstatement stage, in order to make sure that the opportunity to build back better, integrating flood-protection measures is grasped by the SME owners. Stakeholders related to the construction industry, who are actively involved with post-flood reinstatement work, have an important role to play in this regard, providing necessary guidance and expertise to flooded SMEs.