818 resultados para decision analytic model


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Reducing rates of healthcare acquired infection has been identified by the Australian Commission on Safety and Quality in Health Care as a national priority. One of the goals is the prevention of central venous catheter-related bloodstream infection (CR-BSI). At least 3,500 cases of CR-BSI occur annually in Australian hospitals, resulting in unnecessary deaths and costs to the healthcare system between $25.7 and $95.3 million. Two approaches to preventing these infections have been proposed: use of antimicrobial catheters (A-CVCs); or a catheter care and management ‘bundle’. Given finite healthcare budgets, decisions about the optimal infection control policy require consideration of the effectiveness and value for money of each approach. Objectives: The aim of this research is to use a rational economic framework to inform efficient infection control policy relating to the prevention of CR-BSI in the intensive care unit. It addresses three questions relating to decision-making in this area: 1. Is additional investment in activities aimed at preventing CR-BSI an efficient use of healthcare resources? 2. What is the optimal infection control strategy from amongst the two major approaches that have been proposed to prevent CR-BSI? 3. What uncertainty is there in this decision and can a research agenda to improve decision-making in this area be identified? Methods: A decision analytic model-based economic evaluation was undertaken to identify an efficient approach to preventing CR-BSI in Queensland Health intensive care units. A Markov model was developed in conjunction with a panel of clinical experts which described the epidemiology and prognosis of CR-BSI. The model was parameterised using data systematically identified from the published literature and extracted from routine databases. The quality of data used in the model and its validity to clinical experts and sensitivity to modelling assumptions was assessed. Two separate economic evaluations were conducted. The first evaluation compared all commercially available A-CVCs alongside uncoated catheters to identify which was cost-effective for routine use. The uncertainty in this decision was estimated along with the value of collecting further information to inform the decision. The second evaluation compared the use of A-CVCs to a catheter care bundle. We were unable to estimate the cost of the bundle because it is unclear what the full resource requirements are for its implementation, and what the value of these would be in an Australian context. As such we undertook a threshold analysis to identify the cost and effectiveness thresholds at which a hypothetical bundle would dominate the use of A-CVCs under various clinical scenarios. Results: In the first evaluation of A-CVCs, the findings from the baseline analysis, in which uncertainty is not considered, show that the use of any of the four A-CVCs will result in health gains accompanied by cost-savings. The MR catheters dominate the baseline analysis generating 1.64 QALYs and cost-savings of $130,289 per 1.000 catheters. With uncertainty, and based on current information, the MR catheters remain the optimal decision and return the highest average net monetary benefits ($948 per catheter) relative to all other catheter types. This conclusion was robust to all scenarios tested, however, the probability of error in this conclusion is high, 62% in the baseline scenario. Using a value of $40,000 per QALY, the expected value of perfect information associated with this decision is $7.3 million. An analysis of the expected value of perfect information for individual parameters suggests that it may be worthwhile for future research to focus on providing better estimates of the mortality attributable to CR-BSI and the effectiveness of both SPC and CH/SSD (int/ext) catheters. In the second evaluation of the catheter care bundle relative to A-CVCs, the results which do not consider uncertainty indicate that a bundle must achieve a relative risk of CR-BSI of at least 0.45 to be cost-effective relative to MR catheters. If the bundle can reduce rates of infection from 2.5% to effectively zero, it is cost-effective relative to MR catheters if national implementation costs are less than $2.6 million ($56,610 per ICU). If the bundle can achieve a relative risk of 0.34 (comparable to that reported in the literature) it is cost-effective, relative to MR catheters, if costs over an 18 month period are below $613,795 nationally ($13,343 per ICU). Once uncertainty in the decision is considered, the cost threshold for the bundle increases to $2.2 million. Therefore, if each of the 46 Level III ICUs could implement an 18 month catheter care bundle for less than $47,826 each, this approach would be cost effective relative to A-CVCs. However, the uncertainty is substantial and the probability of error in concluding that the bundle is the cost-effective approach at a cost of $2.2 million is 89%. Conclusions: This work highlights that infection control to prevent CR-BSI is an efficient use of healthcare resources in the Australian context. If there is no further investment in infection control, an opportunity cost is incurred, which is the potential for a more efficient healthcare system. Minocycline/rifampicin catheters are the optimal choice of antimicrobial catheter for routine use in Australian Level III ICUs, however, if a catheter care bundle implemented in Australia was as effective as those used in the large studies in the United States it would be preferred over the catheters if it was able to be implemented for less than $47,826 per Level III ICU. Uncertainty is very high in this decision and arises from multiple sources. There are likely greater costs to this uncertainty for A-CVCs, which may carry hidden costs, than there are for a catheter care bundle, which is more likely to provide indirect benefits to clinical practice and patient safety. Research into the mortality attributable to CR-BSI, the effectiveness of SPC and CH/SSD (int/ext) catheters and the cost and effectiveness of a catheter care bundle in Australia should be prioritised to reduce uncertainty in this decision. This thesis provides the economic evidence to inform one area of infection control, but there are many other infection control decisions for which information about the cost-effectiveness of competing interventions does not exist. This work highlights some of the challenges and benefits to generating and using economic evidence for infection control decision-making and provides support for commissioning more research into the cost-effectiveness of infection control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The first use of computing technologies and the development of land use models in order to support decision-making processes in urban planning date back to as early as mid 20th century. The main thrust of computing applications in urban planning is their contribution to sound decision-making and planning practices. During the last couple of decades many new computing tools and technologies, including geospatial technologies, are designed to enhance planners' capability in dealing with complex urban environments and planning for prosperous and healthy communities. This chapter, therefore, examines the role of information technologies, particularly internet-based geographic information systems, as decision support systems to aid public participatory planning. The chapter discusses challenges and opportunities for the use of internet-based mapping application and tools in collaborative decision-making, and introduces a prototype internet-based geographic information system that is developed to integrate public-oriented interactive decision mechanisms into urban planning practice. This system, referred as the 'Community-based Internet GIS' model, incorporates advanced information technologies, distance learning, sustainable urban development principles and community involvement techniques in decision-making processes, and piloted in Shibuya, Tokyo, Japan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). The paper begins with an update on a key development in a new early/first-order procurement decision making model that deploys production cost/benefit theory and theories concerning transaction costs from the New Institutional Economics, in order to identify a procurement mode that is likely to deliver the best ratio of production costs and transaction costs to production benefits, and therefore deliver superior VfM relative to alternative procurement modes. In doing so, the new procurement model is also able to address the uncertainty concerning the relative merits of Public-Private Partnerships (PPP) and non-PPP procurement approaches. The main aim of the paper is to develop competition as a dependent variable/proxy for VfM and a hypothesis (overarching proposition), as well as developing a research method to test the new procurement model. Competition reflects both production costs and benefits (absolute level of competition) and transaction costs (level of realised competition) and is a key proxy for VfM. Using competition as a proxy for VfM, the overarching proposition is given as: When the actual procurement mode matches the predicted (theoretical) procurement mode (informed by the new procurement model), then actual competition is expected to match potential competition (based on actual capacity). To collect data to test this proposition, the research method that is developed in this paper combines a survey and case study approach. More specifically, data collection instruments for the surveys to collect data on actual procurement, actual competition and potential competition are outlined. Finally, plans for analysing this survey data are briefly mentioned, along with noting the planned use of analytical pattern matching in deploying the new procurement model and in order to develop the predicted (theoretical) procurement mode.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study examined the effect that temporal order within the entrepreneurial discovery exploitation process has on the outcomes of venture creation. Consistent with sequential theories of discovery-exploitation, the general flow of venture creation was found to be directed from discovery toward exploitation in a random sample of nascent ventures. However, venture creation attempts which specifically follow this sequence derive poor outcomes. Moreover, simultaneous discovery-exploitation was the most prevalent temporal order observed, and venture attempts that proceed in this manner more likely become operational. These findings suggest that venture creation is a multi-scale phenomenon that is at once directional in time, and simultaneously driven by symbiotically coupled discovery and exploitation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the decision-making of multi-area ATC (Available Transfer Capacity) in electricity market environment, the existing resources of transmission network should be optimally dispatched and coordinately employed on the premise that the secure system operation is maintained and risk associated is controllable. The non-sequential Monte Carlo simulation is used to determine the ATC probability density distribution of specified areas under the influence of several uncertainty factors, based on which, a coordinated probabilistic optimal decision-making model with the maximal risk benefit as its objective is developed for multi-area ATC. The NSGA-II is applied to calculate the ATC of each area, which considers the risk cost caused by relevant uncertainty factors and the synchronous coordination among areas. The essential characteristics of the developed model and the employed algorithm are illustrated by the example of IEEE 118-bus test system. Simulative result shows that, the risk of multi-area ATC decision-making is influenced by the uncertainties in power system operation and the relative importance degrees of different areas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and delivering Value for Money (VfM). As part of the background to this challenge, a critique is given of current practice in the selection of the approach to procure major public sector infrastructure in Australia and which is akin to the Multi-Attribute Utility Approach (MAUA). To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision-making model is presented. The model addresses the make-or-buy decision (risk allocation); the bundling decision (property rights incentives), as well as the exchange relationship decision (relational to arms-length exchange) in its novel approach to articulating a procurement strategy designed to yield superior VfM across the whole life of the asset. The aim of this paper is report on the development of this decisionmaking model in terms of the procedural tasks to be followed and the method being used to test the model. The planned approach to testing the model uses a sample of 87 Australian major infrastructure projects in the sum of AUD32 billion and deploys a key proxy for VfM comprising expressions of interest, as an indicator of competition.