967 resultados para construction project teams


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction project teams are increasingly operating in dispersed arrangements in which communications predominantly take place via information communication technology (ICT) with a dose of face-to-face interactions. However, a review of literature reflects a scarcity of research on how shifting to dispersed teams affects the perceived quality of communications in construction project teams. The present study attempts to address such a gap in the body of knowledge. To this end, 12 major indicators of quality of communications were identified through a review of literature. This was followed by conducting 17 semi-structured interviews with experts in the industry to customize the indicators for the construction context. Based on the identified indicators, a questionnaire survey was designed for elucidating the perceptions of construction practitioners about changes in quality of communications in dispersed teams in comparison to fully collocated ones. Drawing upon the data collated from 285 duly completed questionnaires, confirmatory factor analysis (CFA) was deployed to define the major areas of change in quality of communications in dispersed teams as perceived by the respondents. The findings showed that shifting towards dispersed working results in a change in perceived quality of communications in ten areas mainly reduction in completeness and reliability of communications. The present study contributes to the field by providing a list of indicators for assessing the quality of communications for construction project teams. Additionally, the findings provide an illuminating insight into the primary changes in perceived quality of communications in disperse team arrangements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conflict is intrinsic to individuals, teams and organisations. Due to the unique and complex nature with various parties, conflict is inevitable in most construction projects. According to the general management literature, three distinct types of intragroup conflicts can be identified: task, process and relationship conflicts. However, very little consideration has been given in the literature addressing the three types individually in a construction project team setting. Therefore, this study has explored the existence of types of intragroup conflicts and their management in this context. This research was approached through case studies of six construction projects, which were operating under the traditional procurement method in Sri Lanka. Semi-structured interviews were conducted with three distinct participants from each team. The findings revealed that both process and relationship conflicts offer disruptive effects to construction projects and teams, while task conflicts offer positive effects when they exist at low levels. Based on the most critical sources identified within the cases, suggestions are offered here to construction project team managers on how to manage intergroup conflicts proactively. Since the research is based on six case studies on traditional procurement arrangement in Sri Lanka, further research is required to generalise the findings across different contexts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-Deploying hybrid construction project teams (HCPTs) in which the common pattern of interactions is a blend of face-to-face and virtual communications has been increasingly gaining momentum in the construction context. Evidence has demonstrated that effectiveness of HCPTs is affected by a perceived level of virtuality, i.e. the perception of distance and boundaries between members where teams shift towards working virtually as opposed to purely collocated teams. This study aims to provide an integrated model of the factors affecting perceived virtuality in HCPTs, to address the conspicuous absence of studies on virtuality in the construction context. Design/methodology/approach-An a priori list of factors extracted from existing literature on virtuality was subjected to the scrutiny of 17 experts with experiences of working in HCPTs through semi-structured interviews. Nvivo 10 was deployed for analysing the interview transcripts. Findings-The fndings outline the factors affecting virtuality in HCPTs and map the patterns of their associations as an integrated model. This leads to discovering a number of novel factors, which exert moderating impacts upon perceived virtuality in HCPTs. Practical implications-The fndings assist managers and practitioners dealing with any form of HCPTs (including building information modelling-based networks and distributed design teams) in identifying the variables manipulating the effectiveness of their teams. This enables them of designing more effective team arrangements. Originality/value-As the frst empirical study on virtuality in the construction context, this paper contributes to the sphere by conceptualising and contextualising the concept of virtuality in the construction industry. The study presents a new typology for the factors affecting perceived virtuality by categorising them into predictors and moderators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As business environments become even more competitive, project teams are required to make an effort to operate external linkages from within an organization or across organizational boundaries. Nevertheless, some members boundary-span less extensively, isolating themselves and their project teams from external environments. Our study examines why some members boundary-span more or less through the framework of group attachment theory. Data from 521 project-team members in construction and engineering industries revealed that the more individuals worry about their project team’s acceptance (group attachment anxiety), the more likely they are to perceive intergroup competition, and thus put more efforts into operating external linkages and resources to help their own teams outperform competitors. In contrast, a tendency to distrust their project teams (group attachment avoidance) generates members’ negative construal of their team’s external image, and thus fewer efforts are made at operating external linkages. Thus, project leaders and members with high group-attachment-anxiety may be best qualified for external tasks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

From the perspective of network, a project team’s social capital consists of conduits network, and resource exchange network. Prior research intensively studies the effect of the structure of conduits network on the team’s performance, assuming knowledge transfer is the causal mechanism linking conduits network to performance. This paper attempts to explore the interrelations between conduits network and knowledge network, and further distinguish the different influence between various conduit networks, and hypothesizes that a project team’s knowledge network mediates the effect of various conduit networks on the team’s performance. This research can enrich our knowledge of disparate influence of the various conduit networks on knowledge transfer, and imply some management practices to enhance the organization’s social capital, and hence improve the organization’s performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In sustainable development projects, as well as other types of projects, knowledge transfer is important for the organisations managing the project. Nevertheless, knowledge transfer among employees does not happen automatically and it has been found that the lack of social networks and the lack of trust among employees are the major barriers to effective knowledge transfer. Social network analysis has been recognised as a very important tool for improving knowledge transfer in the project environment. Transfer of knowledge is more effective where it depends heavily on social networks and informal dialogue. Based on the theory of social capital, social capital consists of two parts: conduits network and resource exchange network. This research studies the relationships among performance, the resource exchange network (such as the knowledge network) and the relationship network (such as strong ties network, energy network, and trust network) at the individual and project levels. The aim of this chapter is to present an approach to overcoming the lack of social networks and lack of trust to improve knowledge transfer within project-based organisations. This is to be done by identifying the optimum structure of relationship networks and knowledge networks within small and medium projects. The optimal structure of the relationship networks and knowledge networks is measured using two dimensions: intra-project and inter-project. This chapter also outlines an extensive literature review in the areas of social capital, knowledge management and project management, and presents the conceptual model of the research approach.