997 resultados para construction contractor


Relevância:

100.00% 100.00%

Publicador:

Resumo:

International comparisons of construction industry performance are notoriously difficult. A recent comparative study, extensive in scope and using an innovative approach, is reviewed and questions raised regarding various aspects of the methodology adopted, the validity of the conclusions drawn and manner in which outcomes were reported. Particular areas of concern include the unequivocal statement of conclusions that are based on a small sample, and the use of data from that sample that are, in fact, no more than estimates of project performance. Attention is drawn to the limitations of the research reported and the reliability of the methods used, and the data gathered is examined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The integration of automation (specifically Global Positioning Systems (GPS)) and Information and Communications Technology (ICT) through the creation of a Total Jobsite Management Tool (TJMT) in construction contractor companies can revolutionize the way contractors do business. The key to this integration is the collection and processing of real-time GPS data that is produced on the jobsite for use in project management applications. This research study established the need for an effective planning and implementation framework to assist construction contractor companies in navigating the terrain of GPS and ICT use. An Implementation Framework was developed using the Action Research approach. The framework consists of three components, as follows: (i) ICT Infrastructure Model, (ii) Organizational Restructuring Model, and (iii) Cost/Benefit Analysis. The conceptual ICT infrastructure model was developed for the purpose of showing decision makers within highway construction companies how to collect, process, and use GPS data for project management applications. The organizational restructuring model was developed to assist companies in the analysis and redesign of business processes, data flows, core job responsibilities, and their organizational structure in order to obtain the maximum benefit at the least cost in implementing GPS as a TJMT. A cost-benefit analysis which identifies and quantifies the cost and benefits (both direct and indirect) was performed in the study to clearly demonstrate the advantages of using GPS as a TJMT. Finally, the study revealed that in order to successfully implement a program to utilize GPS data as a TJMT, it is important for construction companies to understand the various implementation and transitioning issues that arise when implementing this new technology and business strategy. In the study, Factors for Success were identified and ranked to allow a construction company to understand the factors that may contribute to or detract from the prospect for success during implementation. The Implementation Framework developed as a result of this study will serve to guide highway construction companies in the successful integration of GPS and ICT technologies for use as a TJMT.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Digging the foundation for the Arnold and Mabel Beckman Business and Technology Hall, Chapman University, Orange, California, ca. 1997. Turner Construction, contractor.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Digging the foundation for the Arnold and Mabel Beckman Business and Technology Hall, Chapman University, Orange, California, ca. 1997. Turner Construction, contractor.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The exploratory research presented in this discussion paper was undertaken as input to a major research grant application for the Australian Research Council. The research looks at the contribution of the Australian built environment to meet social and environmental needs. The paper examines the following research questions: What are the main challenges facing the Australian built environment? What types of building innovations might address those challenges? The research questions were addressed through desk-top research, involving an international review of (1) relevant academic literature in top-tier construction management and general management journals, and (2) high profile industry reports published internationally. Future research will involve assessing the diffusion of the identified building innovations and gauging their impact on social and environmental goals.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Digging the foundation for the Arnold and Mabel Beckman Business and Technology Hall, Chapman University, Orange, California, ca. 1997. Turner Construction, contractor.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Digging the foundation for the Arnold and Mabel Beckman Business and Technology Hall, Chapman University, Orange, California, ca. 1997. Turner Construction, contractor.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Digging the foundation for the Arnold and Mabel Beckman Business and Technology Hall, Chapman University, Orange, California, ca. 1997. Turner Construction, contractor.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Case study research investigating the impact of culture upon a Hong Kong based construction contractor's leadership in implementing an Enterprise Resource Planning (ERP) system unearthed rich data relating to the predominantly Hong Kong Chinese cultural perspective of power, leadership and followership. Intimately involved participants were surveyed using both structured and semi-structured interviews. The study's focus was centred upon the interplay between culture, power and how people interact with the way that the ERP is used and how teams of people involved in the ERP implementation, perceived the supportive nature of the organisation's leadership in deploying the ERP. A culturally sensitive empowering leadership style was a significant issue in successfully project managing and deploying the ERP. Understanding how teams and their leaders interact and how power and trust influences the facilitation role of leadership is also useful in gauging how an ERP can be most effectively deployed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este artigo pretende discutir as relações entre o projeto ALBRAS/ALUNORTE e o processo de organização sindical dos trabalhadores da construção civil de Barcarena, no momento da construção da fábrica da ALBRAS. Analisam-se as relações de trabalho nos canteiros de obras e discutem-se as idéias de modernidade e de progresso que os trabalhadores expressaram nos momentos de conflito com os empresários da construção civil, com o governo do Pará e com o projeto de desenvolvimento para a região, nas greves ocorridas no setor em 1984 e 1985.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

No. 36/37 & 50, sect. 1-3. Queensboro subway.--No. 39, sect. 2. Broadway - Fourth avenue (New Utrecht avenue) - No. 43, 4/38, see no. 4/38, 43.--No. 48, sect. 1-2. Seventh avenue - Lexington avenue.--No. 50. Queensboro subway (Hunters Point avenue station