1000 resultados para construction auctions


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Currently, multi-attribute auctions are becoming widespread awarding mechanisms for contracts in construction, and in these auctions, criteria other than price are taken into account for ranking bidder proposals. Therefore, being the lowest-price bidder is no longer a guarantee of being awarded, thus increasing the importance of measuring any bidder’s performance when not only the first position (lowest price) matters. Modeling position performance allows a tender manager to calculate the probability curves related to the more likely positions to be occupied by any bidder who enters a competitive auction irrespective of the actual number of future participating bidders. This paper details a practical methodology based on simple statistical calculations for modeling the performance of a single bidder or a group of bidders, constituting a useful resource for analyzing one’s own success while benchmarking potential bidding competitors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the extent to which engineers can influence the competitive behavior of bidders in Best Value or multi-attribute construction auctions, where both the (dollar) bid and technical non-price criteria are scored according to a scoring rule. From a sample of Spanish construction auctions with a variety of bid scoring rules, it is found that bidders are influenced by the auction rules in significant and predictable ways. The bid score weighting, bid scoring formula and abnormally low bid criterion are variables likely to influence the competitiveness of bidders in terms of both their aggressive/conservative bidding and concentration/dispersion of bids. Revealing the influence of the bid scoring rules and their magnitude on bidders’ competitive behavior opens the door for the engineer to condition bidder competitive behavior in such a way as to provide the balance needed to achieve the owner’s desired strategic outcomes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The number of bidders, N, involved in a construction procurement auction is known to have an important effect on the value of the lowest bid and the mark up applied by bidders. In practice, for example, it is important for a bidder to have a good estimate of N when bidding for a current contract. One approach, instigated by Friedman in 1956, is to make such an estimate by statistical analysis and modelling. Since then, however, finding a suitable model for N has been an enduring problem for researchers and, despite intensive research activity in the subsequent thirty years little progress has been made - due principally to the absence of new ideas and perspectives. This paper resumes the debate by checking old assumptions, providing new evidence relating to concomitant variables and proposing a new model. In doing this and in order to assure universality, a novel approach is developed and tested by using a unique set of twelve construction tender databases from four continents. This shows the new model provides a significant advancement on previous versions. Several new research questions are also posed and other approaches identified for future study.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Noncompetitive bids have recently become a major concern in both public and private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German Tank problem. The model is then demonstrated and tested on a sample of real construction bid data, and shown to detect cover bids with high accuracy. This paper contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The number of bidders, N, involved in a construction procurement auction is known to have an important effect on the value of the lowest bid and the mark-up applied by bidders. In practice, for example, it is important for a bidder to have a good estimate of N when bidding for a current contract. One approach, instigated by Friedman in 1956, is to make such an estimate by statistical analysis and modelling. Since then, however, finding a suitable model for N has been an enduring problem for researchers and, despite intensive research activity in the subsequent 30 years, little progress has been made, due principally to the absence of new ideas and perspectives. The debate is resumed by checking old assumptions, providing new evidence relating to concomitant variables and proposing a new model. In doing this and in order to ensure universality, a novel approach is developed and tested by using a unique set of 12 construction tender databases from four continents. This shows the new model provides a significant advancement on previous versions. Several new research questions are also posed and other approaches identified for future study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Anticipating the number and identity of bidders has significant influence in many theoretical results of the auction itself and bidders’ bidding behaviour. This is because when a bidder knows in advance which specific bidders are likely competitors, this knowledge gives a company a head start when setting the bid price. However, despite these competitive implications, most previous studies have focused almost entirely on forecasting the number of bidders and only a few authors have dealt with the identity dimension qualitatively. Using a case study with immediate real-life applications, this paper develops a method for estimating every potential bidder’s probability of participating in a future auction as a function of the tender economic size removing the bias caused by the contract size opportunities distribution. This way, a bidder or auctioner will be able to estimate the likelihood of a specific group of key, previously identified bidders in a future tender.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Teachers' failure to utilise MBL activities more widely may be due to not recognising their capacity to transform the nature of laboratory activities to be more consistent with contemporary constructivist theories of learning. This research aimed to increase understanding of how MBL activities specifically designed to be consistent with a constructivist theory of learning support or constrain student construction of understanding. The first author conducted the research with his Year 11 physics class of 29 students. Dyads completed nine tasks relating to kinematics using a Predict-Observe-Explain format. Data sources included video and audio recordings of students and teacher during four 70-minute sessions, students' display graphs and written notes, semi-structured student interviews, and the teacher's journal. The study identifies the actors and describes the patterns of interactions in the MBL. Analysis of students' discourse and actions identified many instances where students' initial understanding of kinematics were mediated in multiple ways. Students invented numerous techniques for manipulating data in the service of their emerging understanding. The findings are presented as eight assertions. Recommendations are made for developing pedagogical strategies incorporating MBL activities which will likely catalyse student construction of understanding.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.