923 resultados para conforming bid (tender)
Resumo:
This thesis is a framework to formalise contractors process for bidding decision making through categorising the factors effecting the decision to bid into five categories. It opens the door to introduce a strategic planning system for pre-contract and business development activities which cost the contractors up to 5% of the project cost which is considered as high risk investment and would have impact on submitted bid price and the project delivery quality.
Resumo:
Mathematical relationships between Scoring Parameters can be used in Economic Scoring Formulas (ESF) in tendering to distribute the score among bidders in the economic part of a proposal. Each contracting authority must set an ESF when publishing tender specifications and the strategy of each bidder will differ depending on the ESF selected and the weight of the overall proposal scoring. This paper introduces the various mathematical relationships and density distributions that describe and inter-relate not only the main Scoring Parameters but the main Forecasting Parameters in any capped tender (those whose price is upper-limited). Forecasting Parameters, as variables that can be known in advance before the deadline of a tender is reached, together with Scoring Parameters constitute the basis of a future Bid Tender Forecasting Model.
Resumo:
Recent developments in the area of Bid Tender Forecasting have enabled bidders to implement new types of easy-to-use tools for increasing their chances of winning contracts. Although these new tools (such as iso-Score Curve Graphs, Scoring Probability Graphs, and Position Probability Graphs) are designed for bidders in capped tendering (tenders with an upper price limit), some of their principles can also be applied by a Contracting Authority to detect which bidders do not follow a standard pattern, that is, their bids are extremely high or low. Since a collusive bid generally needs to be sufficiently high or low to make an impact on the bid distribution, any person in charge of supervising capped tenders can be alerted to any bidder that might be involved in a cartel after identifying the same abnormal behavior in a series of tenders through simple calculations and a new type of graph.
Resumo:
Research in Bid Tender Forecasting Models (BTFM) has been in progress since the 1950s. None of the developed models were easy-to-use tools for effective use by bidding practitioners because the advanced mathematical apparatus and massive data inputs required. This scenario began to change in 2012 with the development of the Smartbid BTFM, a quite simple model that presents a series of graphs that enables any project manager to study competitors using a relatively short historical tender dataset. However, despite the advantages of this new model, so far, it is still necessary to study all the auction participants as an indivisible group; that is, the original BTFM was not devised for analyzing the behavior of a single bidding competitor or a subgroup of them. The present paper tries to solve that flaw and presents a stand-alone methodology useful for estimating future competitors’ bidding behaviors separately.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms set the stage for an adversarial and potentially destructive business relationship. Clients, especially those from the public sector, need broader tender evaluation criteria to complement the traditional focus on bid price. There is also a need for change in the construction industry—not only to a more cooperative approach between the constructing parties—but also from a confrontationist attitude to a more harmonious relationship between all stakeholders in providing constructed facilities. A strategic alliance is a cooperative relationship between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. Strategic alliances in building construction may provide a useful tool to assist public sector construction managers evaluate tenders and concurrently encourage more cooperative relationships amongst construction stakeholders. This paper begins with an overview of the Australian building construction industry, then reviews the existing strategic alliance literature and describes an analysis framework comprising six attributes of strategic alliances for application to construction organisations—trust, commitment, interdependence, cooperation, communication, and joint problem solving. These attributes are currently being used to collect data from 70 building construction firms in Queensland to assess their respective levels of strategic alliance. Given the trend towards broader indicators of construction firm performance, these attributes are proposed as a tool for use in the tender evaluation process for public works.
Resumo:
In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.
Resumo:
Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.
Resumo:
The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.
Resumo:
Instead of the costly encryption algorithms traditionally employed in auction schemes, efficient Goldwasser-Micali encryption is used to design a new sealed-bid auction. Multiplicative homomorphism instead of the traditional additive homomorphism is exploited to achieve security and high efficiency in the auction. The new scheme is the currently known most efficient non-interactive sealed-bid auction with bid privacy.