983 resultados para circuit breaker
Resumo:
Mode of access: Internet.
Resumo:
This paper provides a discussion on future direct current (DC) network development in terms of system protection under DC-side fault scenarios. The argument between appropriate DC circuit breaker and new DC fault-tolerant converters is discussed after a review on DC technology development and bottleneck issues that require proper solutions. The overcurrent/cost curve of power-electronic DC circuit breakers (CB) superimposed to voltage-source converter (VSC) systems is derived and compared with other possible fault-tolerant power conversion options. This in-advance planning of protection capability is essential for the future development of DC networks.
Resumo:
This study analyzes an accident in which two maintenance workers suffered severe burns while replacing a circuit breaker panel in a steel mill, following model of analysis and prevention of accidents (MAPA) developed with the objective of enlarging the perimeter of interventions and contributing to deconstruction of blame attribution practices. The study was based on materials produced by a health service team in an in-depth analysis of the accident. The analysis shows that decisions related to system modernization were taken without considering their implications in maintenance scheduling and creating conflicts of priorities and of interests between production and safety; and also reveals that the lack of a systemic perspective in safety management was its principal failure. To explain the accident as merely non-fulfillment of idealized formal safety rules feeds practices of blame attribution supported by alibi norms and inhibits possible prevention. In contrast, accident analyses undertaken in worker health surveillance services show potential to reveal origins of these events incubated in the history of the system ignored in practices guided by the traditional paradigm.
Resumo:
This study analyzes an accident in which two maintenance workers suffered severe burns while replacing a circuit breaker panel in a steel mill, following model of analysis and prevention of accidents (MAPA) developed with the objective of enlarging the perimeter of interventions and contributing to deconstruction of blame attribution practices. The study was based on materials produced by a health service team in an in-depth analysis of the accident. The analysis shows that decisions related to system modernization were taken without considering their implications in maintenance scheduling and creating conflicts of priorities and of interests between production and safety; and also reveals that the lack of a systemic perspective in safety management was its principal failure. To explain the accident as merely non-fulfillment of idealized formal safety rules feeds practices of blame attribution supported by alibi norms and inhibits possible prevention. In contrast, accident analyses undertaken in worker health surveillance services show potential to reveal origins of these events incubated in the history of the system ignored in practices guided by the traditional paradigm.
Resumo:
Tämän diplomityön tarkoitus on selvittää pienjakelujännitteen nostosta aiheutuvia vaikutuksia sellutehtaan varavoimaverkossa. Työn alussa esitellään varavoimaverkkoon kuuluvia osia, selvitetään erilaisten kuormien vaikutusta varavoimaverkon sähkön laatuun sekä kuormien jakoa varmennettuihin verkkoihin. Seuraavaksi suunnitellaan kaksi keskitettyä varavoimaverkkomallia eri pienjakelujännitteillä. Mallien nimellisjännitteet ovat 400 V ja 690 V. Varavoimaverkkomallien kuormat ja osastojen väliset etäisyydet on otettu valmiista sellutehtaista. Tässä diplomityössä painotutaan erityisesti varavoimaverkkomallien mitoitukseen ja jakelujännitteen nostosta aiheutuvien vaikutusten teknistaloudelliseen vertailuun. Vertailu tehdään keskijännitekojeiston ja varavoimakeskusten välisellä alueella, johon kuu-luvat jakelumuuntaja, varavoimakone, varavoimapääkeskus, kiskosillat, jakelukaapelit, kytkinvaroke- ja katkaisijalähdöt sekä mahdolliset välimuuntajat. Varavoimaverkkojen välisessä kustannusvertailussa käytetään nykyarvomenetelmää.
Resumo:
Tämän työn tavoitteena on analysoida Vaasan Sähköverkko Oy:n keskijänniteverkon nykytila sekä selvittää verkon kehittämisen suuntaviivoja. Nykytilan määrityksessä selvitetään kuormitettavuusasteet, jännitteenalenemat, häviöt oiko- ja maasulkusuojauksen toimivuus sekä keskeytyskustannukset. Nykytilan määrityksen apuna käytettiin verkkotietojärjestelmä Xpowerin tehojako-, oikosulku- ja maasulkulaskentoja. Nykytila on määritetty sekä normaalissa kytkentätilanteessa, että tilanteessa jossa yksi sähköasema kerrallaan on poissa käytöstä. Nykytilan määrityksen perusteella voidaan todeta, että normaalissa kytkentätilanteessa keskijänniteverkko täyttää suurilta osin sille asetetut tekniset reunaehdot, jotka ovat jännitteenalenema, kuormitettavuus, oikosulkukestoisuus sekä oiko- ja maasulkusuojauksen havahtuvaisuus. Jotta reunaehdot toteutuisivat kokonaisuudessaan, tulee oikosulkukestottomien lähtöjen releasetteluja muuttaa tai vaihtaa oikosulkukestottomat johto-osuudet suurempi poikkipintaiseen johtimeen. Nykytilan määrityksen perusteella neljän päämuuntajan kuormitettavuusaste on yli 90 %, joten näiden asemien alueiden kehitystä tulee tarkkailla. Sähköasemien korvaustarkastelun perusteella viiden sähköaseman korvaus tuottaa ongelmia jo nykyisillä huippukuormilla. Työssä tehtyjen selvitystöiden perusteella Vaasan Sähköverkko Oy:n keskijänniteverkkoon lisättiin 10 maastokatkaisijaa sekä selvitettiin verkon mahdollisia tulevaisuuden kehittämisen suuntaviivoja.
Resumo:
Master’s thesis focuses on the questions of crane electrics compliance with electrical safety standards. Overview and short comparison of the world’s effective standards in the field is made in order to understand their demands. Basic concepts of a proper electrical circuit design are presented. Characteristics, construction and operation principles of overcurrent protective devices are studied in details. Electrics of the basic crane is designed according to the assumed customer’s demands, compliance with the requirements of the standards is checked. Solutions to achieve better compliance in some issues are proposed. Accent is made on the National Electrical Code (NEC) and standards by Underwriters Laboratories (UL) latests demands. Requirements of the International Electrotechnical Commission (IEC) are also taken into account.
Resumo:
This thesis presents a low cost non-intrusive home energy monitor built on top of Non-Intrusive Load Monitoring (NILM) concepts and techniques. NILM solutions are already considered low cost alternatives to the big majority of existing commercial energy monitors but the goal here is to make its cost even lower by using a mini netbook as a whole in one solution. The mini netbook is installed in the homes main circuit breaker and computes power consumption by reading current and voltage from the built-in sound card. At the same time, feedback to the users is provided using the 11’’ LCD screen as well as other built-in I/O modules. Our meter is also capable of detecting changes in power and tries to find out which appliance lead to that change and it is being used as part of an eco-feedback platform that was build to study the long terms of energy eco-feedback in individuals. In this thesis the steps that were taken to come up with such a system are presented, from the basics of AC power measurements to the implementation of an event detector and classifier that was used to disaggregate the power load. In the last chapter results from some validation tests that have been performed are presented in order to validate the experiment. It is believed that such a system will not only be important as an energy monitor, but also as an open system than can be easily changed to accommodate and test new or existing nonintrusive load monitoring techniques.
Resumo:
In this work the problem of defects location in power systems is formulated through a binary linear programming (BLP) model based on alarms historical database of control and protection devices from the system control center, sets theory of minimal coverage (AI) and protection philosophy adopted by the electric utility. In this model, circuit breaker operations are compared to their expected states in a strictly mathematical manner. For solving this BLP problem, which presents a great number of decision variables, a dedicated Genetic Algorithm (GA), is proposed. Control parameters of the GA, such as crossing over and mutation rates, population size, iterations number and population diversification, are calibrated in order to obtain efficiency and robustness. Results for a test system found in literature, are presented and discussed. © 2004 IEEE.
Resumo:
The traditional operational and hazard control paradigm of an electrical installation has several issues pertaining to the diversity of equipment. A large maintenance inventory is a reason for concern for any manager, but the arc flash hazard is a particularly new phenomenon and the effects of equipment diversity on this phenomenon are even newer. The class of arc hazard can be increased, simply by changing the fuse link or circuit breaker manufacturer. Management pressure to operate as well as non-standard practices and installations are also partly responsible. The aim of this study is to take a typical situation in an industrial plant and to statistically simulate, by means of a dedicated software program, the fuse arc flash interruption performance of various manufacturers. The purpose of this study is to obtain a more objective indication of the influence of different fuse link manufacturers on arc flash incident energy. © 2011 IEEE.
Resumo:
The traditional operational and hazard control paradigm of an electrical installation has several issues pertaining to the diversity of equipment. A large maintenance inventory is a reason for concern for any manager, but the arc-flash hazard is a particularly new phenomenon, and the effects of equipment diversity on this phenomenon are even newer. The class of arc hazard can be simply increased by changing the fuse link or circuit breaker manufacturer. Management pressure to operate as well as nonstandard practices and installations are also partly responsible. The aim of this article is to take a typical situation in an industrial plant and to statistically simulate, by means of a dedicated software program, the fuse arc-flash interruption performance of various manufacturers. The purpose of this article is to obtain a more objective indication of the influence of different fuse link manufacturers on arc-flash incident energy. © 1975-2012 IEEE.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Title from cover.
Resumo:
Computer programs have been developed to enable the coordination of fuses and overcurrent relays for radial power systems under estimated fault current conditions. The grading curves for these protection devices can be produced on a graphics terminal and a hard copy can be obtained. Additional programs have also been developed which could be used to assess the validity of relay settings (obtained under the above conditions) when the transient effect is included. Modelling of a current transformer is included because transformer saturation may occur if the fault current is high, and hence the secondary current is distorted. Experiments were carried out to confirm that distorted currents will affect the relay operating time, and it is shown that if the relay current contains only a small percentage of harmonic distortion, the relay operating time is increased. System equations were arranged to enable the model to predict fault currents with a generator transformer incorporated in the system, and also to include the effect of circuit breaker opening, arcing resistance, and earthing resistance. A fictitious field winding was included to enable more accurate prediction of fault currents when the system is operating at both lagging and leading power factors prior to the occurrence of the fault.
Resumo:
This chapter discusses network protection of high-voltage direct current (HVDC) transmission systems for large-scale offshore wind farms where the HVDC system utilizes voltage-source converters. The multi-terminal HVDC network topology and protection allocation and configuration are discussed with DC circuit breaker and protection relay configurations studied for different fault conditions. A detailed protection scheme is designed with a solution that does not require relay communication. Advanced understanding of protection system design and operation is necessary for reliable and safe operation of the meshed HVDC system under fault conditions. Meshed-HVDC systems are important as they will be used to interconnect large-scale offshore wind generation projects. Offshore wind generation is growing rapidly and offers a means of securing energy supply and addressing emissions targets whilst minimising community impacts. There are ambitious plans concerning such projects in Europe and in the Asia-Pacific region which will all require a reliable yet economic system to generate, collect, and transmit electrical power from renewable resources. Collective offshore wind farms are efficient and have potential as a significant low-carbon energy source. However, this requires a reliable collection and transmission system. Offshore wind power generation is a relatively new area and lacks systematic analysis of faults and associated operational experience to enhance further development. Appropriate fault protection schemes are required and this chapter highlights the process of developing and assessing such schemes. The chapter illustrates the basic meshed topology, identifies the need for distance evaluation, and appropriate cable models, then details the design and operation of the protection scheme with simulation results used to illustrate operation. © Springer Science+Business Media Singapore 2014.