965 resultados para change construction
Resumo:
The SternReview(2006) on the economics of climate change has changed the ground onwhich arguments over climate change are fought. In making the economic case for mitigation over adaptation, Stern has sought to undermine one of the primary arguments against decisive early action - that the immediate costs outweigh the long-term benefits. While this argument is made at the global level, it is appropriate to ask what implications Stern's arguments might have at the construction sectoral level. The implications of the Stern Review for construction can be divided into three main questions. How construction would be different if Stern's economics were applied? How would construction companies act differently if Stern's ethics were adopted? How will the political response to the Stern Review change construction's policy and regulatory landscape? The impact of the Review has shifted the debate from the natural science community into the public policy domain and onto an economic rationale. There seems to have been a pronounced shift away from the debate over the science and towards the economics of mitigation versus adaptation. In this context, the academic debate over Stern's methods is irrelevant - it is his findings, authority and use of the hegemonic power of economic argument that carry the day. This is likely to be Stern's true legacy, and through this will come his greatest impact on construction.
Resumo:
In this paper I first discuss some non-causal change constructions which have largely gone unnoticed in the literature, such as The butler bowed the guests in (which is said to code mild causation) and The supporters booed Newcastle off at the interval (which only codes temporal coextension between its two constitutive subevents). Since the same structure (i.e. the transitive object-oriented change construction) can be used to code a wide spectrum of causal and temporal relations, the question arises of what cognitive mechanisms may be involved in such meaning shifts. I argue that variation can be motivated on the basis of the figure/ground segregation which the conceptualiser can impose upon the integrated scene coded by the change construction. The integrated scene depicts a force-dynamic scenario but also evokes a unique temporal setting (i.e. temporal overlap or coextension between the constitutive subevents). Such a “bias” towards temporal overlap can be used by the conceptualiser to background causation and highlight temporal overlap interpretations. It is also shown that figure/ground segregation can be appealed to to account for the causal interpretation of intransitive change constructions, e.g. The kettle boiled dry. If the conceptual distance between the verbal event and the non-verbal event is (relatively) great, causality can be highlighted even in intransitive patterns.
Resumo:
The C6 rat glioma cell line is responsive to glucocorticoid hormones. C6 variants that are hyper-responsive (ST1) and resistant (P7) to hormone treatment have been derived previously. Glucocorticoid treatment of ST1 cells leads to complete reversion of the transformed phenotype and loss of tumorigenic potential. Production of C type retrovirus particles is also induced by glucocorticoids in ST1 cells. Cloning of the genes regulated by glucocorticoids in this cell system was used here as a strategy to uncover the gene products involved in the transformed-to-normal phenotypic change. Construction of a cDNA library from glucocorticoid-treated ST1 cells and screening by differential hybridization resulted in the isolation of three cellular sequences that code for rat metallothioneins (C27 and C41) and α1-acid glycoprotein (C36). Northern blot analysis revealed that expression of these genes was dramatically induced by hydrocortisone in ST1 but not in P7 cells. Viral genomic RNA was used to isolate and characterize retrovirus-related sequences that could also be responsible for the phenotypic reversion phenomenon.
Resumo:
Les facteurs climatiques ainsi bien que les facteurs non-climatiques doivent être pris en considération dans le processus d'adaptation de l'agriculture aux changements et à la variabilité climatiques (CVC). Ce changement de paradigme met l'agent humain au centre du processus d'adaptation, ce qui peut conduire à une maladaptation. Suite aux débats sur les changements climatiques qui ont attiré l'attention scientifique et publique dans les années 1980 et 1990, l'agriculture canadienne est devenue un des points focaux de plusieurs études pionnières sur les CVC, un phénomène principalement dû à l’effet anthropique. Pour faire face aux CVC, ce n’est pas seulement la mitigation qui est importante mais aussi l’adaptation. Quand il s'agit de l'adaptation, c'est plutôt la variabilité climatique qui nous intéresse que simplement les augmentations moyennes des températures. L'objectif général de ce mémoire de maîtrise est d'améliorer la compréhension des processus d'adaptation et de construction de la capacité d'adaptation ai niveau de la ferme et de la communauté agricole à travers un processus ascendant, c’est-à-dire en utilisant l'approche de co-construction (qui peut également être considéré comme une stratégie d'adaptation en soi), pour développer une gestion et des outils de planification appropriés aux parties prenantes pour accroître ainsi la capacité d'adaptation de la communauté agricole. Pour y arriver, l'approche grounded theory est utilisée. Les résultats consistent de cinq catégories interdépendantes de codes élargis, conceptuellement distinctes et avec un plus grand niveau d'abstraction. La MRC du Haut-Richelieu a été choisie comme étude de cas en raison de plusieurs de ses dimensions agricoles, à part de ses conditions biophysiques favorables. 15 entrevues ont été menées avec les agriculteurs. Les résultats montrent que si certains agriculteurs ont reconnu les côtés positifs et négatifs des CVC, d’autres sont très optimistes à ce sujet comme se ils ne voient que le côté positif; d'où la nécessité de voir les deux côtés des CVC. Aussi, il y a encore une certaine incertitude liée aux CVC, qui vient de la désinformation et la désensibilisation des agriculteurs principalement en ce qui concerne les causes des CVC ainsi que la nature des événements climatiques. En outre, et compte tenu du fait que l'adaptation a plusieurs caractéristiques et types, il existe de nombreux types d'adaptation qui impliquent à la fois l'acteur privé et le gouvernement. De plus, les stratégies d'adaptation doivent être élaborées conjointement par les agriculteurs en concert avec d'autres acteurs, à commencer par les agronomes, car ils servent en tant que relais important entre les agriculteurs et d'autres parties prenantes telles que les institutions publiques et les entreprises privées.
Resumo:
Heat waves are expected to increase in frequency and magnitude with climate change. The first part of a study to produce projections of the effect of future climate change on heat-related mortality is presented. Separate city-specific empirical statistical models that quantify significant relationships between summer daily maximum temperature (T max) and daily heat-related deaths are constructed from historical data for six cities: Boston, Budapest, Dallas, Lisbon, London, and Sydney. ‘Threshold temperatures’ above which heat-related deaths begin to occur are identified. The results demonstrate significantly lower thresholds in ‘cooler’ cities exhibiting lower mean summer temperatures than in ‘warmer’ cities exhibiting higher mean summer temperatures. Analysis of individual ‘heat waves’ illustrates that a greater proportion of mortality is due to mortality displacement in cities with less sensitive temperature–mortality relationships than in those with more sensitive relationships, and that mortality displacement is no longer a feature more than 12 days after the end of the heat wave. Validation techniques through residual and correlation analyses of modelled and observed values and comparisons with other studies indicate that the observed temperature–mortality relationships are represented well by each of the models. The models can therefore be used with confidence to examine future heat-related deaths under various climate change scenarios for the respective cities (presented in Part 2).
Resumo:
Change within the construction sector has been a central concern of governments and a select few private-sector clients for a considerable time. The discourse of change emanating from organizations concerned with reform in the construction sector reflects these ongoing concerns for change in the sector. The underlying assumptions of the content of change and appropriate change mechanisms in the UK are critically examined and challenged. In particular, the limitations of measurement and best practice are explored. The allegiance to approaches based on measurement and best practice is acontextual, unreflective and insufficient in providing wholly reliable explanations for the relationship between practice and performance. Claims for the use of measurement and best practice by the reform movement must therefore be understood to have limitations and their use approached with caution. The emphasis on best practice is also understood to direct attention away from understanding the legitimacy of current practice and change within the UK construction sector. An agenda for change in the UK construction sector will need to engage with and be more reflective of current managerial practice and past change initiatives. Contextual approaches such as structuration theory offer a way in which to underpin a research framework that could support the reform movement in setting such an agenda.
Resumo:
Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.
Resumo:
There is limited understanding of the role of services in the wave of globalisation and how the strengths of the UK service sector help to respond to the challenge of global competition. The way in which the construction export data are collected does not reflect the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership, foreign affiliates, and changing forms of procurement. The paper describes construction service exports, how they are collected and classified, highlighting the challenges of recording the export performance of construction services in a changing world. A case for change is made to ensure the collection of statistics better reflects the role of construction professional services
Resumo:
This paper proposes a spatial-temporal downscaling approach to construction of the intensity-duration-frequency (IDF) relations at a local site in the context of climate change and variability. More specifically, the proposed approach is based on a combination of a spatial downscaling method to link large-scale climate variables given by General Circulation Model (GCM) simulations with daily extreme precipitations at a site and a temporal downscaling procedure to describe the relationships between daily and sub-daily extreme precipitations based on the scaling General Extreme Value (GEV) distribution. The feasibility and accuracy of the suggested method were assessed using rainfall data available at eight stations in Quebec (Canada) for the 1961-2000 period and climate simulations under four different climate change scenarios provided by the Canadian (CGCM3) and UK (HadCM3) GCM models. Results of this application have indicated that it is feasible to link sub-daily extreme rainfalls at a local site with large-scale GCM-based daily climate predictors for the construction of the IDF relations for present (1961-1990) and future (2020s, 2050s, and 2080s) periods at a given site under different climate change scenarios. In addition, it was found that annual maximum rainfalls downscaled from the HadCM3 displayed a smaller change in the future, while those values estimated from the CGCM3 indicated a large increasing trend for future periods. This result has demonstrated the presence of high uncertainty in climate simulations provided by different GCMs. In summary, the proposed spatial-temporal downscaling method provided an essential tool for the estimation of extreme rainfalls that are required for various climate-related impact assessment studies for a given region.
Resumo:
Includes bibliography
Resumo:
The aim of this paper is to analyze, synchronically and diachronically, aspects of the Spanish impersonal se-construction that have not yet been satisfactorily accounted for in Spanish linguistics
Resumo:
This paper analyzes the psychosocial construction of the conceptions of time and social change, and their relation with the notion of progress set up by modernity as well as their contradictory aspects, considering their historicity as psychosocial and social phenomena. The social construction of the notion of time is discussed; it responds to social organization forms, thus turning the social changes into historical and temporal landmarks. The association between social changes and social movements is argued and the concept of progress is deconstructed. Finally, the importance of the idea of movement in the construction of time, change and progress concepts is pointed out; it is also explained how modernity imbued such notions with direction and goals, in the direction of an arrow, according to the prevailing interests, while modeling them in its own image and likeness.