677 resultados para Whole-of-Life-Efficiencies
Resumo:
Building Information Modelling (BIM) is a digital process that encompasses all aspects, disciplines and systems of built assets within a single virtual model. This allows stakeholders to collaborate more accurately and efficiently than with traditional processes. Case study 1 Design: New Generation Rollingstock Maintenance Centre, Queensland. Case Study 2 Construction: Perth Children's Hospital, Western Australia. Case Study 3 Asset Management: Sydney Opera House, New South Wales. This project sought to provide the built environment industry with a framework to measure and maximize benefits from implementing BIM across the life-cycle phases of a built asset.
Resumo:
The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.
Resumo:
n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented
Resumo:
Policy makers increasingly recognise that an educated workforce with a high proportion of Science, Technology, Engineering and Mathematics (STEM) graduates is a pre-requisite to a knowledge-based, innovative economy. Over the past ten years, the proportion of first university degrees awarded in Australia in STEM fields is below the global average and continues to decrease from 22.2% in 2002 to 18.8% in 2010 [1]. These trends are mirrored by declines between 20% and 30% in the proportions of high school students enrolled in science or maths. These trends are not unique to Australia but their impact is of concern throughout the policy-making community. To redress these demographic trends, QUT embarked upon a long-term investment strategy to integrate education and research into the physical and virtual infrastructure of the campus, recognising that expectations of students change as rapidly as technology and learning practices change. To implement this strategy, physical infrastructure refurbishment/re-building is accompanied by upgraded technologies not only for learning but also for research. QUT’s vision for its city-based campuses is to create vibrant and attractive places to learn and research and to link strongly to the wider surrounding community. Over a five year period, physical infrastructure at the Gardens Point campus was substantially reconfigured in two key stages: (a) a >$50m refurbishment of heritage-listed buildings to encompass public, retail and social spaces, learning and teaching “test beds” and research laboratories and (b) destruction of five buildings to be replaced by a $230m, >40,000m2 Science and Engineering Centre designed to accommodate retail, recreation, services, education and research in an integrated, coordinated precinct. This landmark project is characterised by (i) self-evident, collaborative spaces for learning, research and social engagement, (ii) sustainable building practices and sustainable ongoing operation and; (iii) dynamic and mobile re-configuration of spaces or staffing to meet demand. Innovative spaces allow for transformative, cohort-driven learning and the collaborative use of space to prosecute joint class projects. Research laboratories are aggregated, centralised and “on display” to the public, students and staff. A major visualisation space – the largest multi-touch, multi-user facility constructed to date – is a centrepiece feature that focuses on demonstrating scientific and engineering principles or science oriented scenes at large scale (e.g. the Great Barrier Reef). Content on this visualisation facility is integrated with the regional school curricula and supports an in-house schools program for student and teacher engagement. Researchers are accommodated in a combined open-plan and office floor-space (80% open plan) to encourage interdisciplinary engagement and cross-fertilisation of skills, ideas and projects. This combination of spaces re-invigorates the on-campus experience, extends educational engagement across all ages and rapidly enhances research collaboration.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
This report summarises the findings of a case study on Queensland’s New Generation Rollingstock (NGR) Project carried out as part of SBEnrc Project 2.34 Driving Whole-of-life Efficiencies through BIM and Procurement. This case study is one of three exemplar projects studied in order to leverage academic research in defining indicators for measuring tangible and intangible benefits of Building Information Modelling (BIM) across a project’s life-cycle in infrastructure and buildings. The NGR is an AUD 4.4 billion project carried out under an Availability Payment Public-Private Partnership (PPP) between the Queensland Government and the Bomabardier-led QTECTIC consortium comprising Bombardier Transportation, John Laing, ITOCHU Corporation and Aberdeen Infrastructure Investments. BIM has been deployed on the project from conceptual stages to drive both design and the currently ongoing construction at the Wulkuraka Project Site. This case study sourced information from a series of semi-structured interviews covering a cross-section of key stakeholders on the project. The present research identified 25 benefits gained from implementing BIM processes and tools. Some of the most prominent benefits were those leading to improved outcomes and higher customer satisfaction such as improved communications, data and information management, and coordination. There were also a number of expected benefits for future phases such as: • Improved decision making through the use of BIM for managing assets • Improved models through BIM maturity • Better utilisation of BIM for procurement on similar future projects • New capacity to specify the content of BIM models within contracts There were also three benefits that were expected to have been achieved but were not realised on the NGR project. These were higher construction information quality levels, better alignment in design teams as well as project teams, and capability improvements in measuring the impact of BIM on construction safety. This report includes individual profiles describing each benefit as well as the tools and processes that enabled them. Four key BIM metrics were found to be currently in use and six more were identified as potential metrics for the future. This case study also provides insights into challenges associated with implementing BIM on a project of the size and complexity of the NGR. Procurement aspects and lessons learned for managers are also highlighted, including a list of recommendations for developing a framework to assess the benefits of BIM across the project life-cycle.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
Jarvis et al. (Research Articles, 12 December 2014, p. 1320) presented molecular clock analyses that suggested that most modern bird orders diverged just after the mass extinction event at the Cretaceous-Paleogene boundary (about 66 million years ago). We demonstrate that this conclusion results from the use of a single inappropriate maximum bound, which effectively precludes the Cretaceous diversification overwhelmingly supported by previous molecular studies.
Resumo:
Mitchell et al. argue that divergence-time estimates for our avian phylogeny were too young because of an "inappropriate" maximum age constraint for the most recent common ancestor of modern birds and that, as a result, most modern bird orders diverged before the Cretaceous-Paleogene mass extinction event 66 million years ago instead of after. However, their interpretations of the fossil record and timetrees are incorrect.
Resumo:
The increasing need to understand complex products and systems with long life spans, presents a significant challenge to designers who increasingly require a broader understanding of the operational aspects of the system. This demands an evolution in current design practice, as designers are often constrained to provide a subsystem solution without full knowledge of the global system operation. Recently there has been a push to consider value centric approaches which should facilitate better or more rapid convergence to design solutions with predictable completion schedules. Value Driven Design is one such approach, in which value is used as the system top level objective function. This provides a broader view of the system and enables all sub-systems and components to be designed with a view to the effect on project value. It also has the capacity to include value expressions for more qualitative aspects, such as environmental impact. However, application of the method to date has been restricted to comparing value in a programme where the lifespan is fixed and known a priori. This paper takes a novel view of value driven design through the surplus value objective function, and shows how it can be used to identify key sensitivities to guide designers in design trade-off decisions. By considering a new time based approach it can be used to identify optimum programme life-span and hence allow trade-offs over the whole product life.
Resumo:
Patients with brain metastases (BM) rarely survive longer than 6months and are commonly excluded from clinical trials. We explored two combined modality regimens with novel agents with single agent activity and radiosensitizing properties.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Pages 654-682 incorrectly numbered 664-692.
Resumo:
Mode of access: Internet.