974 resultados para Water fire fighting
Resumo:
Includes index.
Resumo:
Includes index.
Resumo:
"May 1968."
Resumo:
The EU’s October summit was dominated by one issue; the migration and refugee crisis, with EU leaders intent on putting on a public display of unity after weeks of bitter arguments, and concentrating on fire-fighting and immediate measures to tackle the most pressing reasons for, and impacts of, the crisis. Longer-term measures to address some of the root causes of increased migratory flows, support for the integration of newly arrived refugees or the introduction of new channels of legal migration, were not discussed. The Summit also spent little time on two issues that had originally been expected to be a key part of the agenda: the forthcoming British referendum on EU membership, where irritation with the slow pace of talks and British vagueness about its demands were in evidence; and the governance of Economic and Monetary Union (EMU), where EU leaders missed another opportunity for a thorough debate about future perspectives on the basis of the ‘Five Presidents’ Report’.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"20 November 1987."
Resumo:
"20 November 1987."
Resumo:
"Issued October 1946."
Resumo:
"This manual supersedes Bureau of Ships fire fighting manual (Rev. 1944)."
Resumo:
East-West trade has grown rapidly since the sixties, stimulating a parallel expansion in the literature on the subject. An extensive review of this literature shows how: (i) most of the issues involved have at their source the distinctions between East and West in political ideology and/or economic management, and (ii) there has been a tendency to keep theoretical and practical perspectives on the subject too separate. This thesis demonstrates the importance of understanding the fundamental principles implied in the first point, and represents an attempt to bridge the gap identified in the second. A detailed study of the market for fire fighting equipment in Eastern Europe is undertaken in collaboration with a medium-sized company, Angus Fire Armour Limited. Desk research methods are combined with visits to the market to assess the potential for the company's products, and recommendations for future strategy are made. The case demonstrates the scope and limitations of various research methods for the East European market, and a model for market research relevant to all companies is developed. Tne case study highlights three areas largely neglected in the literature: (i) the problems of internal company adaptation to East European conditions; (ii) the division of responsibility between foreign trade organisations; and (iii) bribery and corruption in East-West trade. Further research into the second topic - through a survey of 36 UK exporters - and the third - through analysis of publicised corruption cases - confirms the representativeness of the Angus experience, and reflects on the complexity of the Bast European import process, which does not always function as is commonly supposed. The very complexity of the problems confronting companies reaffirms the need to appreciate the principles underlying the subject, while the detailed analysis into questions of, originally, a marketing nature, reveals wider implications for East-West trade and East-West relations.
Resumo:
Relatório de Estágio para obtenção do grau de Mestre em Engenharia na Área de Especializção em Edificações
Resumo:
Between 2003 and 2007 an urban network or road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as "Calle 30 Project" counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure includieng, in some parts of the tunnel, fixed fire fighting system based on water mist. Whithin this framework a large-scale programme of fire tests was planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinguishing system. In addition, these large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San pedro of Anes" which includes a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test's programme carried out and some previous results obtained.
Resumo:
Between 2003 and 2007 an urban network of road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as “Calle30 Project” counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure including,in some parts of the tunnel, fixed fire fighting system based on water mist. Within this framework a large-scale campaign of fire tests were planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinction system. In addition, this large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San Pedro of Anes" which counts with a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test’s campaign carried out and some previous results obtained.