94 resultados para Walnut
Resumo:
Purpose: The sorption of sulfamethoxazole, a frequently detected pharmaceutical compound in the environment, onto walnut shells was evaluated. Methods: The sorption proprieties of the raw sorbent were chemically modified and two additional samples were obtained, respectively HCl and NaOH treated. Scanning electron microscopy, Fourier transform infrared spectroscopy, X-ray photoelectron spectroscopy, and thermogravimetric (TG/DTG) techniques were applied to investigate the effect of the chemical treatments on the shell surface morphology and chemistry. Sorption experiments to investigate the pH effect on the process were carried out between pH 2 and 8. Results: The chemical treatment did not substantially alter the structure of the sorbent (physical and textural characteristics) but modified the surface chemistry of the sorbent (acid–base properties, point of zero charge—pHpzc). The solution pH influences both the sorbent’s surface charge and sulfamethoxazole speciation. The best removal efficiencies were obtained for lower pH values where the neutral and cationic sulfamethoxazole forms are present in the solution. Langmuir and Freundlich isotherms were applied to the experimental adsorption data for sulfamethoxazole sorption at pH 2, 4, and 7 onto raw walnut shell. No statistical difference was found between the two models except for the pH 2 experimental data to which the Freundlich model fitted better. Conclusion: Sorption of sulfamethoxazole was found to be highly pH dependent in the entire pH range studied and for both raw and treated sorbent.
Resumo:
City Audit Report
Resumo:
Audit report on the City of Walnut, Iowa for the year ended June 30, 2007
Resumo:
El projecte es desenvolupa en el marc d'un conveni entre la UAB i la empresa UNIT4 Business Software Ibérica a les oficines de Barberà del Vallès. L'objectiu del projecte consisteix en crear un assistent de formularis per a la plataforma de treball de l'aplicació de gestió de l'empresa UNIT4 que permeti tant a usuaris com a clients crear els seus propis formularis personalitzats complint sempre les directrius de disseny predefinides.
Resumo:
Audit report on the City of Walnut, Iowa for the year ended June 30, 2011
Resumo:
This report deals with the probable impact of urban development on the magnitude and frequency of flooding in the lower reach of the Walnut Creek Basin.
Resumo:
Examination report on the City of Walnut, Iowa for the period July 1, 2012 through June 30, 2013
Resumo:
Walnut Creek is a Class B warm water stream located in northern Poweshiek County. The creek is sixteen miles in length with 26,223 acres of watershed area. Walnut Creek is listed on the 2008 impaired waters list as biologically impaired. Based on results of biological monitoring, no specific causes of the impairment have been identified. This watershed is of particular significance to the Poweshiek SWCD and the state of Iowa because water quality protection efforts can be implemented that will address the impairment. The Poweshiek SWCD received a watershed development grant in 2005, to complete a watershed assessment for the Walnut Creek Watershed. The results of the assessments showed an estimated 23,224 tons of sediment are delivered annually to Walnut Creek, and, about 34% of land in the watershed is delivering nearly 66% of the sediment. Therefore, the acres with more than 1 ton/ac/yr sediment delivery have been prioritized. In Jan. 2008, an implementation grant began. The 1st year’s EQIP matching funds were obligated by July 2008. Specific objectives are to: 1) Reduce sediment delivery by 3,205 tons, by installing conservation practices on the sediment delivery areas of more that 1 ton/ac/yr, and, 2) Develop an information and education program for landowners. The District has prioritized the Walnut Creek watershed for 50% EQIP funding to be combined with 25% WSPF funds. This application is for additional practice funds, utilized as 50% cost-share, to be used with 25% WSPF funds, for eligible soil loss projects (>1 ton/ac), when EQIP funds are not available.
Resumo:
In 2004 Walnut Creek was placed on the 303d list of impaired water bodies for lack of aquatic life with biological causes. Sediment from farmland as well as the stream banks was listed as the most likely stressor. In response to this listing a preliminary watershed assessment was completed by the six counties which have land in the Walnut Creek watershed. Walnut Creek flows through portions of Shelby, Pottawattamie, Montgomery, Mills, Page, and Fremont Counties before reaching its confluence with the West Nishnabotna River. The preliminary study assessed resource concerns and evaluated anticipated landowner participation levels for the six Huc 12 sub-watersheds which divide the Walnut Creek basin. These preliminary assessments revealed a priority sub-watershed which lies between US Hwy 6 and Hwy 34. A development grant was then funded by the Division of Soil Conservation to conduct a detailed assessment of this area. The detailed assessment involved an assessment of the uplands as well as the stream itself. A better understanding of the resource concerns was gained through the assessment, allowing for a comprehensive watershed plan to be developed. A variety of best management practices will be necessary for our project to be a success, many of which will be funded by other sources besides the WIRB. This grant is the first request for funding submitted by the East Pottawattamie and Montgomery SWCDs’. This grant will serve as the first critical step in building what is destined to be a true watershed success story.
Resumo:
Agreed-upon procedures report on the City of Walnut, Iowa for the period July 1, 2013 through June 30, 2014
Resumo:
In 2004, Walnut Creek was placed on the 303d list of Impaired Waters due to a low biotic index (lack of aquatic life) during IDNR stream sampling events. Sediment originating from agriculture, streambank erosion, and channelization were listed as the most likely sources impacting aquatic life. In an effort to address these concerns, a preliminary study was completed of the multi-county watershed to identify priority areas. A Watershed Development & Planning Assistance Grant was then funded by the IDALS-DSC to conduct a detailed assessment of these prioritized sub-watersheds. The impending assessment of the watershed and the stream corridor revealed ample opportunities to address gully, sheet and rill erosion while addressing in-stream water velocity issues that plagued the riparian corridor. A comprehensive plan was developed comprised of a variety of best management practices to address the identified concerns. In 2009, this plan was submitted to the WIRB Board by the East Pottawattamie and Montgomery SWCDs and $489,455 was awarded to address concerns identified during watershed assessment inquiries. Despite adverse weather conditions, which has hampered conservation construction recently, this project has held fast to pre-project goals due to the fortitude of the project sponsors and the overwhelming participation by the watershed landowners. Unfortunately, state budget shortfalls are bringing project progress to a halt. As specified in the original WIRB funding request, practice funding for Year 3 was to come from the Division of Soil Conservation’s Watershed Protection Fund (WSPF). Due to Iowa’s budgetary restraints, the Walnut Creek WSPF application, which was submitted this spring, was not funded since no new applications in the state were funded. If funded again, this grant will serve as the critical step in continuing what is destined to be a true watershed success story.