898 resultados para Urban development master plan


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Urban Design Master Plan for Government site adjacent to the State Tennis Centre and Yeerongpilly Station.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: Program year 1995.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Program year 1996 covers April 1, 1996-May 31, 1997.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Each vol. includes a 1-year action plan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Each issue includes first year of action plan (e.g., issue for 2000/2004 includes action plan for 2000).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"As submitted to the U.S. Department of Housing and Urban Development."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sustainable development has long been promoted as the best answer to the world's environmental problems. This term has generated mass appeal as it implies that the development of the built environment and its associated resource consumption can both be achieved without jeopardising the natural environment. In the urban context, sustainability issues have been reflected in the pomotion of sustainable urbanisation in a manner that allows future generations to repeat this process. This paper attempts to highlight an increasing urgency in formulating a suitable model for assessing sustainability at urban level, because this is where the bulk of a nation's population reside, and where sustainability problems mostly occur. It will also point out to the increasing importance of governance in facilitating urban sustainability research. This assessment involves the use of physical, social, environmental and goverance aspects in assessing the extent to which development of an urban settlement is sustainable. Specifically, this assessment model is carried out to determine whether or not sustainable urban development pratice is implemented in the provision of residential development, and in particular whether the development of master-planned residential communities have more desireable outcomes compared to traditional residential subdivision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thesis (Master's)--University of Washington, 2015

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The principal objective of this paper is to develop a methodology for the formulation of a master plan for renewable energy based electricity generation in The Gambia, Africa. Such a master plan aims to develop and promote renewable sources of energy as an alternative to conventional forms of energy for generating electricity in the country. A tailor-made methodology for the preparation of a 20-year renewable energy master plan focussed on electricity generation is proposed in order to be followed and verified throughout the present dissertation, as it is applied for The Gambia. The main input data for the proposed master plan are (i) energy demand analysis and forecast over 20 years and (ii) resource assessment for different renewable energy alternatives including their related power supply options. The energy demand forecast is based on a mix between Top-Down and Bottom-Up methodologies. The results are important data for future requirements of (primary) energy sources. The electricity forecast is separated in projections at sent-out level and at end-user level. On the supply side, Solar, Wind and Biomass, as sources of energy, are investigated in terms of technical potential and economic benefits for The Gambia. Other criteria i.e. environmental and social are not considered in the evaluation. Diverse supply options are proposed and technically designed based on the assessed renewable energy potential. This process includes the evaluation of the different available conversion technologies and finalizes with the dimensioning of power supply solutions, taking into consideration technologies which are applicable and appropriate under the special conditions of The Gambia. The balance of these two input data (demand and supply) gives a quantitative indication of the substitution potential of renewable energy generation alternatives in primarily fossil-fuel-based electricity generation systems, as well as fuel savings due to the deployment of renewable resources. Afterwards, the identified renewable energy supply options are ranked according to the outcomes of an economic analysis. Based on this ranking, and other considerations, a 20-year investment plan, broken down into five-year investment periods, is prepared and consists of individual renewable energy projects for electricity generation. These projects included basically on-grid renewable energy applications. Finally, a priority project from the master plan portfolio is selected for further deeper analysis. Since solar PV is the most relevant proposed technology, a PV power plant integrated to the fossil-fuel powered main electrical system in The Gambia is considered as priority project. This project is analysed by economic competitiveness under the current conditions in addition to sensitivity analysis with regard to oil and new-technology market conditions in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reviews the development of Greater Amman, Jordan noting that the vast urban expansion that has occurred over the last fifty years has led to the desertification of rare fertile lands, following the fragmented and scattered territorial expansion of the city. The future scenario for planning in Greater Amman is analyzed in respect of proposals outlined in the Metropolitan Growth Plan of 2008, which assumes a rapid population growth from 2,200,000 persons in 2006, to approximately 6,500,000 by 2025. The concentration of more than 39 per cent of the national population of Jordan in Greater Amman threatens the transformation of former distinct settlement pattern into a distinctive continuous urban zone, aggravating problems of infrastructural provision, water needs, agricultural lands, and leaving unresolved problems of land inflation, poor urban standards and housing shortages. In conclusion, the environmental implications of the Amman Metropolitan Growth Plan are analysed, and it is suggested that an alternative approach is needed, based on clear principles of sustainable urban development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current rate of global biodiversity loss led many governments to sign the international agreement ‘Halting Biodiversity Loss by 2010 and beyond’ in 2001. The UK government was one of these and has a number of methods to tackle this, such as: commissioning specific technical guidance and supporting the UK Biodiversity Acton Plan (BAP) targets. However, by far the most effective influence the government has upon current biodiversity levels is through the town planning system. This is due to the control it has over all phases of a new development scheme’s lifecycle.There is an increasing myriad of regulations, policies and legislation, which deal with biodiversity protection and enhancement across the hierarchical spectrum: from the global and European level, down to regional and local levels. With these drivers in place, coupled with the promotion of benefits and incentives, increasing biodiversity value ought to be an achievable goal on most, if not all development sites. However, in the professional world, this is not the case due to a number of obstructions. Many of these tend to be ‘process’ barriers, which are particularly prevalent with ‘urban’ and ‘major’ development schemes, and is where the focus of this research paper lies.The paper summarises and discusses the results of a questionnaire survey, regarding obstacles to maximising biodiversity enhancements on major urban development schemes. The questionnaire was completed by Local Government Ecologists in England. The paper additionally refers to insights from previous action research, specialist interviews, and case studies, to reveal the key process obstacles.Solutions to these obstacles are then alluded to and recommendations are made within the discussion.