813 resultados para Transit planning
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
Mode of access: Internet.
Resumo:
Rapid population increase and booming economic growth have caused a significant escalation in car ownership in many cities, leading to additional or, multiple traffic problems on congested roadways. The increase of automobiles is generating a significant amount of congestion and pollution in many cities. It has become necessary to find a solution to the ever worsening traffic problems in our cities. Building more roadways is nearly impossible due to the limitations of right-of-way in cities. Studies have shown that guideway transit could provide effective transportation and could stimulate land development. The Medium-Capacity Guideway Transit (MCGT) is one of the alternatives to solve this problem. The objective of this research was to better understand the characteristics of MCGT systems, to investigate the existing MCGT systems around the world and determine the main factors behind the planning of successful systems, and to develop a MCGT planning guide. The factors utilized in this study were determined and were analyzed using Excel. A MCGT Planning Guide was developed using Microsoft Visual Basic. ^ A MCGT was defined as a transit system whose capacity can carry up to 20,000 passengers per hour per direction (pphpd). The results shown that Light Rail Transit (LRT) is favored when peak hour demand is less than 13,000 pphpd. Automated People Mover (APM) is favored when the peak hour demand is more than 18,000 pphpd. APM systems could save up to three times the waiting time cost compared to that of the LRT. If comfort and convenience are important, then using an APM does make sense. However, if cost is the critical factor, then LRT will make more sense because it is reasonable service at a reasonable price. If travel time and safety (accident/crush) costs were included in calculating life-cycle “total” costs, the capital cost advantage of LRT disappeared and APM could become very competitive. The results also included a range of cost-performance criteria for MCGT systems that help planners, engineers, and decision-makers to select the most feasible system for their respective areas. ^
Resumo:
One challenge related to transit planning is selecting the appropriate mode: bus, light rail transit (LRT), regional express rail (RER), or subway. This project uses data from life cycle assessment to develop a tool to measure energy requirements for different modes of transit, on a per passenger-kilometer basis. For each of the four transit modes listed, a range of energy requirements associated with different vehicle models and manufacturers was developed. The tool demonstrated that there are distinct ranges where specific transit modes are the best choice. Diesel buses are the clear best choice from 7-51 passengers, LRTs make the most sense from 201-427 passengers, and subways are the best choice above 918 passengers. There are a number of other passenger loading ranges where more than one transit mode makes sense; in particular, LRT and RER represent very energy-efficient options for ridership ranging from 200 to 900 passengers. The tool developed in the thesis was used to analyze the Bloor-Danforth subway line in Toronto using estimated ridership for weekday morning peak hours. It was found that ridership across the line is for the most part actually insufficient to justify subways over LRTs or RER. This suggests that extensions to the existing Bloor-Danforth line should consider LRT options, which could service the passenger loads at the ends of the line with far greater energy efficiency. It was also clear that additional destinations along the entire transit line are necessary to increase the per passenger-kilometer energy efficiency, as the current pattern of commuting to downtown leaves much of the system underutilized. It is hoped that the tool developed in this thesis can be used as an additional resource in the transit mode decision-making process for many developing transportation systems, including the transit systems across the GTHA.
Resumo:
Transportation Department, Office of University Research, Washington, D.C.
Resumo:
Tesis (Doctor en Ingeniería con Especialidad en Ingeniería de Sistemas) UANL, 2012.
Resumo:
The aim of this paper is to propose an integrated planning model to adequate the offered capacity and system frequencies to attend the increased passenger demand and traffic congestion around urban and suburban areas. The railway capacity is studied in line planning, however, these planned frequencies were obtained without accounting for rolling stock flows through the rapid transit network. In order to provide the problem more freedom to decide rolling stock flows and therefore better adjusting these flows to passenger demand, a new integrated model is proposed, where frequencies are readjusted. Then, the railway timetable and rolling stock assignment are also calculated, where shunting operations are taken into account. These operations may sometimes malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operations will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Swapping operations will also be ensured using homogeneous rolling stock material and ensuring parkings in strategic stations. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results show that through this integrated approach a greater robustness degree can be obtained
Resumo:
Urban Mass Transportation Administration, Washington, D.C.
Resumo:
Federal Transit Administration, Washington, D.C.
Resumo:
"DOT-I-83-14"--P. [4] of cover.
Resumo:
Mode of access: Internet.
Resumo:
An Automatic Vehicle Location (AVL) system is a computer-based vehicle tracking system that is capable of determining a vehicle's location in real time. As a major technology of the Advanced Public Transportation System (APTS), AVL systems have been widely deployed by transit agencies for purposes such as real-time operation monitoring, computer-aided dispatching, and arrival time prediction. AVL systems make a large amount of transit performance data available that are valuable for transit performance management and planning purposes. However, the difficulties of extracting useful information from the huge spatial-temporal database have hindered off-line applications of the AVL data. ^ In this study, a data mining process, including data integration, cluster analysis, and multiple regression, is proposed. The AVL-generated data are first integrated into a Geographic Information System (GIS) platform. The model-based cluster method is employed to investigate the spatial and temporal patterns of transit travel speeds, which may be easily translated into travel time. The transit speed variations along the route segments are identified. Transit service periods such as morning peak, mid-day, afternoon peak, and evening periods are determined based on analyses of transit travel speed variations for different times of day. The seasonal patterns of transit performance are investigated by using the analysis of variance (ANOVA). Travel speed models based on the clustered time-of-day intervals are developed using important factors identified as having significant effects on speed for different time-of-day periods. ^ It has been found that transit performance varied from different seasons and different time-of-day periods. The geographic location of a transit route segment also plays a role in the variation of the transit performance. The results of this research indicate that advanced data mining techniques have good potential in providing automated techniques of assisting transit agencies in service planning, scheduling, and operations control. ^
Resumo:
A major challenge in successfully implementing transit-oriented development (TOD) is having a robust process that ensures effective appraisal, initiation and delivery of multi-stakeholder TOD projects. A step-by step project development process can assist in the methodic design, evaluation, and initiation of TOD projects. Successful TOD requires attention to transit, mixed-use development and public space. Brisbane, Australia provides a case-study where recent planning policies and infrastructure documents have laid a foundation for TOD, but where barriers lie in precinct level planning and project implementation. In this context and perhaps in others, the research effort needs to shift toward identification of appropriate project processes and strategies. This paper presents the outcomes of research conducted to date. Drawing on the mainstream approach to project development and financial evaluation for property projects, key steps for potential use in successful delivery of TOD projects have been identified, including: establish the framework; location selection; precinct context review; preliminary precinct design; the initial financial viability study; the decision stage; establishment of project structure; land acquisition; development application; and project delivery. The appropriateness of this mainstream development and appraisal process will be tested through stakeholder research, and the proposed process will then be refined for adoption in TOD projects. It is suggested that the criteria for successful TOD should be broadened beyond financial concerns in order to deliver public sector support for project initiation.
Resumo:
Cette thèse croise les concepts de planification, de gouvernance et de transit-oriented development (TOD) par une étude de la production, de la mise en débat et de l'adoption du plan métropolitain d'aménagement et de développement (PMAD) de la Communauté métropolitaine de Montréal (CMM). Elle expose les résultats de quatre années de recherche qualitative sur les impacts de l'épisode du PMAD et de la stratégie TOD de la CMM sur les pratiques planificatrices et les processus décisionnels du Grand Montréal à l'échelle métropolitaine. Elle révèle que la planification métropolitaine et l'objectif de coordination du transport et de l'aménagement en général ainsi que le PMAD et le concept de TOD en particulier y sont des instruments de gouvernance. Les chapitres 2, 3 et 4 présentent la problématique, le terrain d'enquête et la démarche méthodologique de cette recherche. Le chapitre 5 relate l'épisode du PMAD en analysant son contenu, les procédures par lesquelles la CMM l'a produit, mis en débat et adopté, les réactions des parties prenantes de la région quant à ces aspects et la façon dont elles comptent assurer le suivi de sa mise en œuvre. Le chapitre 6 illustre comment cet épisode a fait du PMAD un instrument de gouvernance pour le Grand Montréal en décortiquant le rôle de la participation publique, des médias, des acteurs des milieux régional et local, des élus, de la CMM et de la société civile de la région au sein de ce processus de changement de registre de la planification et de la gouvernance les déployant sur des bases plus stratégiques et collaboratives. Le chapitre 7 montre que cet épisode a aussi fait du TOD un instrument de gouvernance pour le Grand Montréal en détaillant les tenants et aboutissants du processus d'appropriation, de marchand(is)age et d'instrumentalisation du concept par les élites politiques et techniques à des fins de marketing territorial et de construction de capital politique ouvrant la voie à la stabilisation d'une gouvernance en matière d'aménagement métropolitain. Il se dégage de cette thèse que ces profondes transformations que subissent actuellement la planification et la gouvernance exacerbent le caractère symbiotique de la relation qui les unit.
Resumo:
The growth and expansion of cities during the last century can’t be seen without taking into account the important role they have assumed in the transport infrastructure. In Bogota have passed trough streetcar, buses and automóviles was deciding for the city, because all this periods marked a drastic change in growth morphology. This article studies the planning of Mass Transit System –MTS– Transmilenio and its interaction with the urban structure, in light of the current city planning framework. It also specifies the behavior of land use in the construction of the system first phase. One of the most important findings of this study is that there is no articulation between land and transport use system, despite the decisions taken in the ordering model. Similarly, local and intermediate planning exhibits Peak articulation.The existing infrastructure of the MTS reiterates the tendency to concentrate the accessibility in one place: the center has the largest accessibility whereas periphery fails to overcome its limitations of accessibility. While the city continued with this trend the existence of a coordinated planning system for Bogota and the ability to meet expectations of planning model is questionable, however it is something that depends not only on MTS.