849 resultados para The money management process,
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. The KM process receives input from its context (e.g. internal business environment), and produces output (i.e. knowledge). It is argued that the validity of such knowledge should be justified by business performance. The study, this paper reports on, provides enhanced empirical understanding of such an input-process-output relationship through investigating the interactions among different KM activities in the context of how construction organisations in Hong Kong manage knowledge. To this end, a theoretical framework along with a number of hypotheses are proposed and empirically tested through correlation, regression and path analyses. A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to facilitate testing the proposed relationships. More than 140 respondents from 99 organisations responded to the survey. The study findings demonstrate that both organisational and technical environments have the potential to predict the intensity of KM activities. Furthermore, different categories of KM activities interact with each other, and collectively they could be used to predict business performance.
Resumo:
To effectively manage the challenges being faced by construction organisations in a fast changing business environment, many organisations are attempting to integrate knowledge management (KM) into their business operations. KM activities interact with each other and form a process which receives input from its internal business environment and produces outputs that should be justified by its business performance. This paper aims to provide further understanding on the dynamic nature of the KM process. Through a combination of path analysis and system dynamic simulation, this study found that: 1) an improved business performance enables active KM activities and provide feedback and guidance for formulating learning-based policies; and 2) effective human resource recruitment policies can enlarge the pool of individual knowledge, which lead to a more conducive internal business environment, as well as a higher KM activity level. Consequently, the desired business performance level can be reached within a shorter time frame.
Resumo:
The aim of this study was to examine the actions of geographically dispersed process stakeholders (doctors, community pharmacists and RACFs) in order to cope with the information silos that exist within and across different settings. The study setting involved three metropolitan RACFs in Sydney, Australia and employed a qualitative approach using semi-structured interviews, non-participant observations and artefact analysis. Findings showed that medication information was stored in silos which required specific actions by each setting to translate this information to fit their local requirements. A salient example of this was the way in which community pharmacists used the RACF medication charts to prepare residents' pharmaceutical records. This translation of medication information across settings was often accompanied by telephone or face-to-face conversations to cross-check, validate or obtain new information. Findings highlighted that technological interventions that work in silos can negatively impact the quality of medication management processes in RACF settings. The implementation of commercial software applications like electronic medication charts need to be appropriately integrated to satisfy the collaborative information requirements of the RACF medication process.
Resumo:
The ProFacil model is a generic process model defined as a framework model showing the links between the facilities management process and the building end user’s business process. The purpose of using the model is to support more detailed process modelling. The model has been developed using the IDEF0 modelling method. The ProFacil model describes business activities from the generalized point of view as management-, support-, and core processes and their relations. The model defines basic activities in the provision of a facility. Examples of these activities are “operate facilities”, “provide new facilities”, “provide re-build facilities”, “provide maintained facilities” and “perform dispose of facilities”. These are all generic activities providing a basis for a further specialisation of company specific FM activities and their tasks. A facilitator can establish a specialized process model using the ProFacil model and interacting with company experts to describe their company’s specific processes. These modelling seminars or interviews will be done in an informal way, supported by the high-level process model as a common reference.
Resumo:
This study will collaborate by bringing some detailed analysis and findings on a special case study of a discontinuous product development process, trying to answer how the discontinuous product development process takes place and the main factors that influence this process. Additionally, it tried to explore some explanations for the difficulties generally faced by the companies to sustain innovation. The case is about the Motorola cell phone RAZR V3, launched in 2004. RAZR V3 was noted by industry experts as game-changing feat of design and engineering, selling more than 110 million units by end of 2008 and recognized as one of the fastest selling products in the industry. The study uses a single case methodology, which is appropriate given the access to a phenomenon that happened inside corporate dominium and it is not easily accessed for academic studies, besides being a rare case of success in the cellular phone industry. In order to magnify the understanding of the phenomenon, the exploration was extended to contrast the RAZR development process and the standard product development process in Motorola. Additionally, it was integrated a longitudinal reflection of the company product development evolution until the next breakthrough product hitting the cellular phone industry. The result of the analysis shows that discontinuous products do not fit well traditional product development process (in this case, stage-gate). This result reinforces the results obtained on previous studies of discontinuous product development conducted by other authors. Therefore, it is clear that the dynamics of discontinuous product development are different from the continuous product development, requiring different treatment to succeed. Moreover, this study highlighted the importance of the management influence in all the phases of the process as one of the most important factors, suggesting a key component to be carefully observed in future researches. Some other findings of the study that were considered very important for a discontinuous product development process: have champions (who believe and protect the project) and not only one champion; create a right atmosphere to make flow the creative process; question paradigms to create discontinuous products; simple guiding light to focus the team; company culture that accepts and knows how to deal with risks; and undoubtedly, have a company strategy that understands the different dynamics of continuous and discontinuous product development processes and treat them accordingly.
Resumo:
The focus of this paper is to outline the practical experiences and the lessons learned derived from the assessment of the requirements management process in two industrial case studies. Furthermore this paper explains the main structure of an alternative assessment approach that has been used in the appraisal of the two case studies. The assessment approach helped us to know the current state of the organizational requirement management process. We have to point out that these practical experiences and the lessons learned can be helpful to reduce risks and costs of the on-site assessment process.
Resumo:
This research advocates the idea that although requirements management process is not carried out in many organizations there is some people within the organization that perform some requirements management practices. However, these practices are usually not documented and as consequence are not spread across the organization. This paper proposes an assessment methodology based on a two-stage questionnaire to identify which practices of the requirements management process are performed but not documented, which practices require to be prioritized and which are not implemented due to bad management or unawareness. In order to validate the assessment methodology, the questionnaire was applied to an industrial case study.
Resumo:
This paper aims to obtain a baseline snapshot of the requirement management process using a two-stage questionnaire to identify both performed and non-performed CMMI practices. The questionnaire proposed in this paper may help with the assessment of the requirement management process, provide useful information related to the current state of the process, and indicate those practices that require immediate attention with the aim of begin a Software Process Improvement program.
Resumo:
Many infrastructure and necessity systems such as electricity and telecommunication in Europe and the Northern America were used to be operated as monopolies, if not state-owned. However, they have now been disintegrated into a group of smaller companies managed by different stakeholders. Railways are no exceptions. Since the early 1980s, there have been reforms in the shape of restructuring of the national railways in different parts of the world. Continuous refinements are still conducted to allow better utilisation of railway resources and quality of service. There has been a growing interest for the industry to understand the impacts of these reforms on the operation efficiency and constraints. A number of post-evaluations have been conducted by analysing the performance of the stakeholders on their profits (Crompton and Jupe 2003), quality of train service (Shaw 2001) and engineering operations (Watson 2001). Results from these studies are valuable for future improvement in the system, followed by a new cycle of post-evaluations. However, direct implementation of these changes is often costly and the consequences take a long period of time (e.g. years) to surface. With the advance of fast computing technologies, computer simulation is a cost-effective means to evaluate a hypothetical change in a system prior to actual implementation. For example, simulation suites have been developed to study a variety of traffic control strategies according to sophisticated models of train dynamics, traction and power systems (Goodman, Siu and Ho 1998, Ho and Yeung 2001). Unfortunately, under the restructured railway environment, it is by no means easy to model the complex behaviour of the stakeholders and the interactions between them. Multi-agent system (MAS) is a recently developed modelling technique which may be useful in assisting the railway industry to conduct simulations on the restructured railway system. In MAS, a real-world entity is modelled as a software agent that is autonomous, reactive to changes, able to initiate proactive actions and social communicative acts. It has been applied in the areas of supply-chain management processes (García-Flores, Wang and Goltz 2000, Jennings et al. 2000a, b) and e-commerce activities (Au, Ngai and Parameswaran 2003, Liu and You 2003), in which the objectives and behaviour of the buyers and sellers are captured by software agents. It is therefore beneficial to investigate the suitability or feasibility of applying agent modelling in railways and the extent to which it might help in developing better resource management strategies. This paper sets out to examine the benefits of using MAS to model the resource management process in railways. Section 2 first describes the business environment after the railway 2 Modelling issues on the railway resource management process using MAS reforms. Then the problems emerge from the restructuring process are identified in section 3. Section 4 describes the realisation of a MAS for railway resource management under the restructured scheme and the feasible studies expected from the model.
Resumo:
The study is about the Gulf-returned Keralites and their personal financial planning during the Gulf-period. The researcher has examined the nature of their income, expenditure, savings and investments during the Gulf-period and after their return. Even though the Gulf-returned Keralites had remitted huge amounts to Kerala, it appears that the majority of them are struggling hard to make both ends meet. The sample consists of 318 Gulf-returned Keralites selected by employing stratified random sampling technique, from 5 districts. After a pilot study, the data was collected through personal interviews using a structured schedule. In order to find out whether the respondents had personal financial planning during the Gulf-period, the researcher has evaluated 15 elements of personal financeusing a five-point-scale rating technique. The hypotheses were tested using correlation, t-test, chi-square and ANOVA, through SPSS.
Resumo:
Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.
Resumo:
Climate change is becoming increasingly apparent that is largely caused by human activities such as asset management processes, from planning to disposal, of property and infrastructure. One essential component of asset management process is asset identification. The aims of the study are to identify the information needed in asset identification and inventory as one of public asset management process in addressing the climate change issue; and to examine its deliverability in developing countries’ local governments. In order to achieve its aims, this study employs a case study in Indonesia. This study only discusses one medium size provincial government in Indonesia. The information is gathered through interviews of the local government representatives in South Sulawesi Province, Indonesia and document analysis provided by interview participants. The study found that for local government, improving the system in managing their assets is one of emerging biggest challenge. Having the right information in the right place and at the right time are critical factors in response to this challenge. Therefore, asset identification as the frontline step in public asset management system is holding an important and critical role. Furthermore, an asset identification system should be developed to support the mainstream of adaptation to climate change vulnerability and to help local government officers to be environmentally sensitive. Finally, findings from this study provide useful input for the policy makers, scholars and asset management practitioners to develop an asset inventory system as a part of public asset management process in addressing the climate change.
Resumo:
The effect of resource management on the building design process directly influences the development cycle time and success of construction projects. This paper presents the information constraint net (ICN) to represent the complex information constraint relations among design activities involved in the building design process. An algorithm is developed to transform the information constraints throughout the ICN into a Petri net model. A resource management model is developed using the ICN to simulate and optimize resource allocation in the design process. An example is provided to justify the proposed model through a simulation analysis of the CPN Tools platform in the detailed structural design. The result demonstrates that the proposed approach can obtain the resource management and optimization needed for shortening the development cycle and optimal allocation of resources.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.