976 resultados para Tecnologia BIM


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação em Arquitetura e Urbanismo, 2015.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this work was developed an information system to apply the concepts of CAD3D-BIM technology for the design activities of the furniture industry. The development of this system was based in an architecture comprised of two modules: a web interface to management the metadata of models from furniture's library and the combination of three-dimensional CAD software with a specific plugin to access the information from this model. To develop this system was also used a Data Base Management System (DBMS) designed to storage the information from models in a hierarchical way, based on concepts of Group Technology (GT). The centralization of information in a single database allows the automatic availability of any changes to all participants involved in a particular project when it‟s happens. Each module from system has its own connection to this database. Finally was developed a prototype from a 3D virtual environment to help create Virtual Reality projects in the web. A study from available technologies to create 3D web applications for execution in websites was done to support this development. The interconnection between modules and the database developed allowed the assembly of a system architecture to support the construction and exhibition of projects of the furniture industry in accordance with the concepts proposed by BIM (Building Information Modeling), using as object of study the furniture industry of state of Rio Grande do Norte

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Este trabalho insere-se no âmbito de um estágio curricular realizado no gabinete de projetos SE2P, durante o qual foram desenvolvidas ferramentas de cálculo estrutural em situação de incêndio, integradas numa metodologia de trabalho que segue os princípios inerentes à tecnologia BIM (Building Information Modeling). Em particular foi implementado um procedimento de análise ao fogo segundo os modelos simplificados prescritos pelos Eurocódigos. Estes modelos garantem a segurança estrutural, permitindo, de forma rápida e eficiente, a determinação das necessidades de proteção passiva para diferentes cenários, tendo em vista a obtenção da solução mais económica. Esta dissertação, para além da apresentação do trabalho desenvolvido em regime de estágio curricular, objetivou dotar o leitor de um documento que introduza os principais conceitos relativos ao cálculo estrutural em situação de incêndio, indicando as várias opções de análise e respetivas vantagens e desvantagens, ajudando a definir a sua adequabilidade ao projeto em estudo. Neste contexto é efetuada uma introdução geral ao fenómeno do fogo e às medidas mais correntes de proteção, indicando-se os documentos normativos aplicáveis tanto ao cálculo estrutural como aos materiais de proteção. É também abordada a interação entre as várias normas que devem ser consultadas quando é efetuada uma análise ao fogo, e quais se aplicam a cada fase da análise. Efetua-se uma clara distinção entre a análise do comportamento térmico e mecânico, indicando-se as principais propriedades dos materiais em função do tipo de análise e a forma como são afetadas pela temperatura. No campo da análise do comportamento térmico faz-se essencialmente referência aos modelos de cálculo simplificados do desenvolvimento da temperatura em elementos metálicos e vigas mistas, com e sem proteção passiva. No que concerne ao campo da análise do comportamento mecânico são descritos os modelos de cálculo simplificados para a verificação da segurança estrutural atendendo às ações e combinações em situação de incêndio e à perda de resistência a temperaturas elevadas. Relativamente ao trabalho desenvolvido na SE2P, relativo ao desenvolvimento de ferramentas de cálculo e a sua implementação na análise ao fogo, realiza-se uma descrição detalhada de todo o processo, e da forma como se integra no conceito BIM, utilizando informações provenientes da modelação das estruturas e introduzindo novos dados ao modelo. Realizou-se também a aplicação de todo o procedimento de análise e das ferramentas desenvolvidas, a um caso de estudo baseado num edifício de habitação. Este caso de estudo serviu também para criar cenários de otimização utilizando-se referências de preços de mercado para o aço, sua transformação em fábrica e sistemas de proteção passiva, demonstrando-se a dificuldade em encontrar caminhos rápidos e diretos de decisão no processo de otimização.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

O BIM – Building Information Modeling – é um conceito de controlo e gestão de informação desenvolvida, entre diferentes especialidades e intervenientes envolventes, durante o ciclo de vida das construções. A utilização das tecnologias BIM, no ramo da Engenharia Mecânica e Civil, tem sido uma aposta constante, e cada vez mais concisa, nos projetos de construção. A justificação para a adoção destas metodologias mais eficientes, em substituição dos processos convencionais, prende-se com o facto desses processos convencionais, ainda hoje, apresentarem muitas dificuldades e problemas associados, por exemplo, à falta de comunicação entre os intervenientes e ao ineficiente controlo na gestão de projetos. O objetivo desta dissertação centra-se na análise da interoperabilidade de softwares BIM, ou seja, na verificação da viabilidade de exportação de dados dos modelos produzidos, entre as ferramentas BIM. Para este campo de ação contribuirá a análise da passagem de informação, relativa ao modelo de uma Nave Industrial modelada, em alguns dos softwares BIM, correntemente mais utilizados. O conhecimento adquirido com a modelação do caso de estudo do presente trabalho irá permitir identificar algumas lacunas existentes ao nível da falta de recomendações práticas que sirvam de orientação na modelação recorrendo a ferramentas informáticas BIM-compatíveis. Assim, a base deste trabalho consiste na criação de uma série de recomendações ou de um roteiro de modelação em específico para a disciplina de estruturas enquanto área de aplicação concreta do estudo efetuado. Nesse sentido, a proposta deste trabalho é de apresentar alguns critérios de modelação onde são definidos os elementos a modelar em cada fase do projeto.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2016.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Eletrotécnica e Computadores

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A metodologia BIM (Building Information Modeling), tem vindo a ganhar grande importância na indústria da AEC (Arquitetura, Engenharia e Construção). Este conceito introduz alterações muito significativas na forma como atualmente se aborda a conceção, construção e manutenção de edifícios. Apesar da emergente utilização, não existem neste momento normas de boas práticas para a sua implementação em Portugal. O BIM tem como princípios a integração das fases do processo construtivo, a integração e trabalho colaborativo de todas as especialidades envolvidas na fase de projeto, sendo apoiada por aplicações de visualização tridimensional. O grande potencial do conceito BIM está também na normalização da informação, sendo suportada entre outros aspetos na normalização da forma como se devem modelar os objetos. Assente nesta base são várias as potencialidades que daqui decorrem. No âmbito desta dissertação pretende-se abordar e aplicar a metodologia BIM ao projeto de estruturas e de especialidades que foi previamente elaborado segundo a metodologia tradicional (CAD 2D). Pretende-se, clarificar a metodologia BIM e avaliar algumas das ferramentas computacionais disponíveis no mercado. O caso de estudo da presente dissertação, permitiu identificar algumas dificuldades e falhas existentes nos projetos a 2D, o que não acontece no caso da metodologia BIM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The integration between architectural design and structur al systems consi sts, in academic education, one of the main challenges to the architectural design education . Recent studies point to the relevance of the use of computational tools in academic settings as an important strategy for such integration. Although in recent yea rs teaching experience using BIM (BuildingInformationModeling) may be incorporated by the a rchitecture schools , notes the need for further didactic and pedagogical practices that promote the architectural design and structur al integration teaching. This pa per analyzes experiences developed within the UFRN and UFPB, seeking to identify tools, processes and products used, pointing limitations and potentials in subjects taught in these institutions. The research begins with a literature review on teaching BIM and related aspects to the integration of architectural design and stru c tur e . It has been used as data collection techniques in studio the direct observation, the use of questionnaires and interviews with students and teachers, and mixed method, qualitativ e and quantitative analysis . In UFRN, the scope of the Integrated Workshop as a compulsory subject in the curriculum, favors the integration of disciplines studied here as it allows teachers from different disciplines at the same project studio . Regarding the use of BIM form initial users, BIM modelers, able to extract quantitative and automatically speed up production, gaining in quality in the products, however learn the tool and design in parallel cause some difficulties. UFPB, lack of required courses o n BIM, generates lack of knowledge and confidence in using the tool and processes, by most students. Thus we see the need for greater efforts by school to adopt BIM skills and training. There is a greater need for both BIM concept, in order to promote BIM process and consequent better use of tools, and obsolete avoiding impairment of technology, merely a tool. It is considered the inclusion of specific subjects with more advanced BIM skills, through partnerships with engineering degrees and the promotion of trans disciplinary integration favoring the exchange of different cultures from the academic environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modeling (BIM) concept is able to reshape each AEC project and the industry in general, offering a comprehensive collaboration process over a model of structure with regularly actualized and synchronized information. This report presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders through four case studies carried out during the internship in the engineering office NEWTON - Engineering Consultancy Company. The aim of the four cases studies was to cover multidisciplinary and varied projects. The first case study highlights the engineering project’s workflow and presents a comparison of traditional procedures and BIM concepts applied on the rehabilitation of an existing building. In the second and third case study, attention is focused on the goals achieved, particularly by structural engineer, due to the implementation of the mentioned technology on a full-lifecycle BIM project of a small residence and a complex project of residential building in Porto and on its architectural integration. In addition, through the fourth case study, the spatial coordination of Mechanical, Electrical and Plumbing (MEP) systems at a large-scale hotel project has been analyzed and accomplished, highlighting merits of BIM at this project stage. Through a reduction of the space used for facilities and infrastructures and the ability to identify conflicts and to nullify the related costs, its advantage for a complex building was proved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

his report describes in detail a project aimed at providing a better understanding of the business drivers and barriers to the adoption of Building Information Modelling (BIM) in the Architecture Engineering and Construction (AEC) and facility management (FM) industry sectors. The objectives of the project were to investigate the nature of economic, process and industry constraints to BIM adoption and then - if possible - to identify business strategies, and cost/benefit models that may support adoption of BIM in AEC/FM industry. The research was based on case studies from the property, construction and facility management sectors as well as other industries and interviews with business leaders and users of advanced applications of CAD in the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As ‘The Architect’s Handbook of Professional Practice’ (cited by Riskus (2007) suggests, Building Information Modelling, or BIM, is “the use of virtual building information models to develop building design solutions, design documentation, and to analyse construction processes”. We would suggest such a definition, while useful, should be extended to include the operational phases of built assets (such as maintenance and decommissioning), and also be applied to the whole area of infrastructure. As a set of technologies, BIM holds promise to deliver benefits for the property, construction, and infrastructure management industries – particularly improved efficiencies and effectiveness through enhanced collaboration at all stages of the construction cycle. There are several important qualifiers, barriers, enablers, and some disadvantages with this suite of technologies. This report outlines the costs and benefits enablers and barriers associated with BIM, and makes suggestions about how these issues may be addressed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.