868 resultados para Student BIM project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Semester 1 2007, a Monitoring Student Engagement study, conducted as part of the Enhancing Transition at Queensland University of Technology (ET@QUT) Project and extending earlier work in the Project by Arora (2006), aimed at mapping the processes and resources used at that time to identify, monitor and manage students in their first year who were at risk of leaving QUT (Shaw, 2007). This identified a lack of documentation of the processes and resources used and revealed an ad-hoc rather than holistic and systematic approach to monitoring student engagement. One of Shaw’s recommendations was to: “To introduce a centralised case management approach to student engagement” (p. 14). That provided the genesis for the Student Success Project that is being reported on here. The aim of the Student Success Project is to trial, evaluate and ultimately establish holistic and systematic ways of helping students who appear to be at-risk of failing or withdrawing from a unit to persist and succeed. Students are profiled as being at-risk if they are absent from more than 2 tutorials in a row without contacting their tutor or if they fail to submit their first assignment. A Project Officer makes personal contact with these students to suggest ways they can get further assistance depending on their situation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry. Additionally Includes MAPMYTOWN 2010, Bell Darling Downs, summary of QUT contributions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report documents the key findings of a year-long collaborative research project focusing on the London Symphony Orchestra’s (LSO) development, implementation and testing of a mobile ticketing and information system. This ticketing system was developed in association with the LSO’s technical partners, Kodime Limited and in collaboration with the Aurora Orchestra.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PAS1192-2 (2013) outlines the “fundamental principles of Level 2 information modeling”, one of these principles is the use of what is commonly referred to as a Common Data Environment (CDE). A CDE could be described as an internet-enabled cloudhosting platform, accessible to all construction team members to access shared project information. For the construction sector to achieve increased productivity goals, the next generation of industry professionals will need to be educated in a way that provides them with an appreciation of Building Information Modelling (BIM) working methods, at all levels, including an understanding of how data in a CDE should be structured, managed, shared and published. This presents a challenge for educational institutions in terms of providing a CDE that addresses the requirements set out in PAS1192-2, and mirrors organisational and professional working practices without causing confusion due to over complexity. This paper presents the findings of a two-year study undertaken at Ulster University comparing the use of a leading industry CDE platform with one derived from the in-house Virtual Learning Environment (VLE), for the delivery of a student BIM project. The research methodology employed was a qualitative case study analysis, focusing on observations from the academics involved and feedback from students. The results of the study show advantages for both CDE platforms depending on the learning outcomes required.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This report provides an overview of findings of qualitative research comprising three case studies undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. These case studies (see Parts 2, 3 and 4 of this suite of reports) were undertaken to illustrate the nature of past R&D investments in Australia. This was done to complement: (i) the audit and analysis of past R&D investment undertaken by Thomas Barlow (2011); and (ii) the Construction 2030 roadmap being developed by Swinburne University of Technology and Professor Göran Roos from VTT Technical Research Centre of Finland. These documents will be the basis for the final phase of the present project - developing policy guidelines for future R&D investment in the Australian built environment. Refer also Parts 1, 2 and 3 for detail findings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Building Information Modeling (BIM) concept is able to reshape each AEC project and the industry in general, offering a comprehensive collaboration process over a model of structure with regularly actualized and synchronized information. This report presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders through four case studies carried out during the internship in the engineering office NEWTON - Engineering Consultancy Company. The aim of the four cases studies was to cover multidisciplinary and varied projects. The first case study highlights the engineering project’s workflow and presents a comparison of traditional procedures and BIM concepts applied on the rehabilitation of an existing building. In the second and third case study, attention is focused on the goals achieved, particularly by structural engineer, due to the implementation of the mentioned technology on a full-lifecycle BIM project of a small residence and a complex project of residential building in Porto and on its architectural integration. In addition, through the fourth case study, the spatial coordination of Mechanical, Electrical and Plumbing (MEP) systems at a large-scale hotel project has been analyzed and accomplished, highlighting merits of BIM at this project stage. Through a reduction of the space used for facilities and infrastructures and the ability to identify conflicts and to nullify the related costs, its advantage for a complex building was proved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

THE little Anglican boarding school of St Barnabas, in the misty mountain town of Ravenshoe, north Queensland, was allegedly a hotbed of physical and sexual abuse in the 1960s. North Queensland Bishop Bill Ray has confirmed the diocese has few files about the school -- which was closed mid-term in 1990 -- with suspicions they were dumped "down a well or an old mine shaft" in the district A history of brutal physical punishment and sexual abuse at the school dating from the 1960s is now emerging. Headmaster Robert Waddington, who arrived at the school from England to be headmaster in 1961, dished out daily canings to many of his young students and then allegedly raped some behind closed doors in his room or the sick bay, which were next to each other. Former St Barnabas student Bim Atkinson, now 58, and two other former students have levelled allegations against the man they called "the Wadd".

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Im Anschluß an das narrative Verständnis der Zeit bei Paul Ricoeur und Wilhelm Schapp entwickelt der Text die These, daß Lebenszeit die Summe der erzählten und erzählbaren Geschichten ist, die wir über uns und die wir einander zu erzählen haben. Wenn diese These Geltung besitzt, plausibel und nachvollziehbar ist, dann sind Sonderpädagogen Geschichtenerzähler. Allerdings (re-)konstruieren sie nur eine Geschichte, nämlich die der Behinderung. Nur in diesem Fokus sind andere Menschen sonderpädagogisch überhaupt interessant. Dieser unauflösliche Widerspruch fundiert Sonderpädagogik. Fatal im Sinne von „end-gültig“ist die Konsequenz für den so Erzählten: wer nur eine Geschichte von sich zu erzählen hat, über wen es nur eine Geschichte zu erzählen gibt, der ist arm dran. Behinderung ist ein Geschichtsmonopol. Dem ist nur durch disziplinkritische Auswilderung zu entgehen. Die pädagogische Aufgabe liegt in der Eröffnung eines Horizontes von Geschichten. Dies kann die verengenden institutionellen und organisatorischen Fragestellungen gegenwärtiger inklusiver Bewegungsforschung erweitern und ergänzen. Es ist dabei gleichgültig, ob dies zu einer Neubestimmung von akademischer Sonderpädagogik oder ihrer Substituierung führt. Die weißen Handschuhe auszuziehen gilt es allemal. (DIPF/Orig.)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.