998 resultados para Strip mining -- Queensland
Resumo:
Bibliography: p. 41.
Resumo:
"U.S. Bureau of Mines contracts J0166054 and J0166055."
Resumo:
Commuting in the mining industry -Background -The problem -Journey management -The structure of the legislative framework Legislation and Regulation -Workplace safety in Queensland mining -Risk management -Mining legislation and journey management -Commuting and employee responsibilities -Queensland Workers’ Compensation Scheme Industry standards -Industry standards and journey management Regulated and organisational policy documents -Policy documents and journey management Observations & Conclusions
Resumo:
In open-cut strip mining, waste material is placed in-pit to minimise operational mine costs. Slope failures in these spoil piles pose a significant safety risk to personnel, along with a financial risk from loss of equipment and scheduling delays. It has been observed that most spoil pile failures occur when the pit has been previously filled with water and then subsequently dewatered. The failures are often initiated at the base of spoil piles where the material can undergo significant slaking (disintegration) over time due to overburden pressure and water saturation. It is important to understand how the mechanical properties of base spoil material are affected by slaking when designing safe spoil pile slope angles, heights, and dewatering rates. In this study, fresh spoil material collected from a coal mine in Brown Basin Coalfield of Queensland, Australia was subjected to high overburden pressure (0 – 900 kPa) under saturated condition and maintained over a period of time (0 – 6 months) allowing the material to slake. To create the above conditions, laboratory designed pressure chambers were used. Once a spoil sample was slaked under certain overburden pressure over a period of time, it was tested for classification, permeability, and strength properties. Results of this testing program suggested that the slaking of saturated coal mine spoil increase with overburden pressure and the time duration over which the overburden pressure was maintained. Further, it was observed that shear strength and permeability of spoil decreased with increase in spoil slaking.
Resumo:
Mode of access: Internet.
Resumo:
Bibliography: p. 296-297.
Resumo:
"July, 1980."
Resumo:
Funded by the U.S. Dept. of Interior, Office of Surface Mining Reclamation and Enforcement.
Resumo:
Cover title.
Resumo:
Cover title.
Resumo:
Mode of access: Internet.
Resumo:
Hearings held Mar. 13-16, 1973
Resumo:
Includes bibliographical references.