992 resultados para Stepwise inventory reduction experiment
Resumo:
Currently, the power generation is one of the most significant life aspects for the whole man-kind. Barely one can imagine our life without electricity and thermal energy. Thus, different technologies for producing those types of energy need to be used. Each of those technologies will always have their own advantages and disadvantages. Nevertheless, every technology must satisfy such requirements as efficiency, ecology safety and reliability. In the matter of the power generation with nuclear energy utilization these requirements needs to be highly main-tained, especially since accidents on nuclear power plants may cause very long term deadly consequences. In order to prevent possible disasters related to the accident on a nuclear power plant strong and powerful algorithms were invented in last decades. Such algorithms are able to manage calculations of different physical processes and phenomena of real facilities. How-ever, the results acquired by the computing must be verified with experimental data.
Resumo:
Stepwise uncertainty reduction (SUR) strategies aim at constructing a sequence of points for evaluating a function f in such a way that the residual uncertainty about a quantity of interest progressively decreases to zero. Using such strategies in the framework of Gaussian process modeling has been shown to be efficient for estimating the volume of excursion of f above a fixed threshold. However, SUR strategies remain cumbersome to use in practice because of their high computational complexity, and the fact that they deliver a single point at each iteration. In this article we introduce several multipoint sampling criteria, allowing the selection of batches of points at which f can be evaluated in parallel. Such criteria are of particular interest when f is costly to evaluate and several CPUs are simultaneously available. We also manage to drastically reduce the computational cost of these strategies through the use of closed form formulas. We illustrate their performances in various numerical experiments, including a nuclear safety test case. Basic notions about kriging, auxiliary problems, complexity calculations, R code, and data are available online as supplementary materials.
Resumo:
Compliance with punctual delivery under the high pressure of costs can be implemented through the optimization of the in-house tool supply. Within the Transfer Project 13 of the Collaborative Research Centre 489 using the example of the forging industry, a mathematical model was developed which determines the minimum inventory of forging tools required for production, considering the tool appropriation delay.
Inventory parameter management and focused continuous improvement for repetitive batch manufacturers
Resumo:
What this thesis proposes is a methodology to assist repetitive batch manufacturers in the adoption of certain aspects of the Lean Production principles. The methodology concentrates on the reduction of inventory through the setting of appropriate batch sizes, taking account of the effect of sequence dependent set-ups and the identification and elimination of bottlenecks. It uses a simple Pareto and modified EBQ based analysis technique to allocate items to period order day classes based on a combination of each item's annual usage value and set-up cost. The period order day classes the items are allocated to are determined by the constraints limits in the three measured dimensions, capacity, administration and finance. The methodology overcomes the limitations associated with MRP in the area of sequence dependent set-ups, and provides a simple way of setting planning parameters taking this effect into account by concentrating on the reduction of inventory through the systematic identification and elimination of bottlenecks through set-up reduction processes, so allowing batch sizes to reduce. It aims to help traditional repetitive batch manufacturers in a route to continual improvement by: Highlighting those areas where change would bring the greatest benefits. Modelling the effect of proposed changes. Quantifying the benefits that could be gained through implementing the proposed changes. Simplifying the effort required to perform the modelling process. It concentrates on increasing flexibility through managed inventory reduction through rationally decreasing batch sizes, taking account of sequence dependent set-ups and the identification and elimination of bottlenecks. This was achieved through the development of a software modelling tool, and validated through a case study approach.
Resumo:
Debido a la necesidad de diferenciarse y hacer frente a la competencia, las empresas han apostado por desarrollar operaciones que den valor al cliente, por eso muchas de ellas han visto en las herramientas lean la oportunidad para mejorar sus operaciones. Esta mejora implica la reducción de dinero, personas, equipos grandes, inventario y espacio, con dos objetivos: eliminar despilfarro y reducir la variabilidad. Para conseguir los objetivos estratégicos de la empresa es imprescindible qué éstos estén alineados con los planes de la gerencia a nivel medio y a su vez con el trabajo realizado por los empleados para asegurar que cada persona está alineada en la misma dirección y al mismo tiempo. Ésta es la filosofía de la planificación estratégica. Por ello uno de los objetivos de este proyecto será el desarrollar una herramienta que facilite la exposición de los objetivos de la empresa y la comunicación de los mismos a todos los niveles de la organización para a partir de ellos y tomando como referencia la necesidad de reducir inventarios en la cadena de suministro se realizará un estudio de la producción de un componente de control del aerogenerador para conseguir nivelarla y reducir su inventario de producto terminado. Los objetivos particulares en este apartado serán reducir el inventario en un 28%, nivelar la producción reduciendo la variabilidad del 31% al 24%, mantener un stock máximo de 24 unidades garantizando el suministro ante una demanda variable, incrementar la rotación del inventario en un 10% y establecer un plan de acción para reducir el lead time entre un 40-50%. Todo ello será posible gracias a la realización del mapa de valor presente y futuro para eliminar desperdicios y crear un flujo continuo y el cálculo de un supermercado que mantenga el stock en un nivel óptimo.
Resumo:
Debido a la necesidad de diferenciarse y hacer frente a la competencia, las empresas han apostado por desarrollar operaciones que den valor al cliente, por eso muchas de ellas han visto en las herramientas lean la oportunidad para mejorar sus operaciones. Esta mejora implica la reducción de dinero, personas, equipos grandes, inventario y espacio, con dos objetivos: eliminar despilfarro y reducir la variabilidad. Para conseguir los objetivos estratégicos de la empresa es imprescindible qué éstos estén alineados con los planes de la gerencia a nivel medio y a su vez con el trabajo realizado por los empleados para asegurar que cada persona está alineada en la misma dirección y al mismo tiempo. Ésta es la filosofía de la planificación estratégica. Por ello uno de los objetivos de este proyecto será el desarrollar una herramienta que facilite la exposición de los objetivos de la empresa y la comunicación de los mismos a todos los niveles de la organización para a partir de ellos y tomando como referencia la necesidad de reducir inventarios en la cadena de suministro se realizará un estudio de la producción de un componente de control del aerogenerador para conseguir nivelarla y reducir su inventario de producto terminado. Los objetivos particulares en este apartado serán reducir el inventario en un 28%, nivelar la producción reduciendo la variabilidad del 31% al 24%, mantener un stock máximo de 24 unidades garantizando el suministro ante una demanda variable, incrementar la rotación del inventario en un 10% y establecer un plan de acción para reducir el lead time entre un 40-50%. Todo ello será posible gracias a la realización del mapa de valor presente y futuro para eliminar desperdicios y crear un flujo continuo y el cálculo de un supermercado que mantenga el stock en un nivel óptimo.
Resumo:
This thesis aims to redesign the supply chain system in an automotive industry in order to obtain space reduction in the inventory by using tailored logistics network. The redesigning process by tailored supply chain will combine all possible shipment methods including direct shipment, milk-run, milk-run via distribution center and Kanban delivery. The current supply chain system in Nissan goes rather well when the production volume is in moderate level. However, when the production volume is high, there is a capacity problem in the warehouse to accommodate all delivered parts from suppliers. Hence, the optimization of supply chain system is needed in order to obtain efficient logistics process and effective inventory consumption. The study will use primary data for both qualitative and quantitative approach as the research methods. Qualitative data will be collected by conducting interviews with people related to procurement and inventory control. Quantitative data consists of list of suppliers with their condition in several parameters which will be evaluated and analyzed by using scoring method to assign the most suitable transportation network to each suppliers for improvement of inventory reduction in a cost efficient manner.
Resumo:
Stepwise electrochemical reduction of the complex fac-[Mn(Br)(CO)(3)(tmbp)] (tmbp = 4,4',5,5'-tetramethyl-2,2'-biphosphinine) produces the dimer [Mn(CO)(3)(tmbp)](2) and the five-coordinate anion [Mn(CO)(3)(tmbp)](-). All three members of the redox series have been characterized by single-crystal X-ray diffraction. The crystallographic data provide valuable insight into the localization of the added electrons on the (carbonyl)manganese and tmbp centers. In particular, the formulation of the two-electron-reduced anion as [Mn-0(CO)(3)(tmbp(-))](-) also agrees with the analysis of its IR nu(CO) wavenumbers and with the results of density functional theoretical (DFT) MO calculations on this compound. The strongly delocalized pi-bonding in the anion stabilizes its five-coordinate geometry and results in the appearance of several mixed Mn-to-tmbp charge-transfer/IL(tmbp) transitions in the near-UV-vis spectral region. A thorough voltammetric and UV-vis/IR spectroelectrochemical study of the reduction path provided evidence for a direct formation of [Mn(CO)(3)(tmbp)](-) via a two-electron ECE mechanism involving the [Mn(CO)(3)(tmbp)](.) radical transient. At ambient temperature [Mn(CO)(3)(tmbp)](-) reacts rapidly with nonreduced fac-[Mn(Br)(CO)(3)(tmbp)] to produce [Mn(CO)(3)(tmbp)](2). Comparison with the analogous 2,2'-bipyridine complexes has revealed striking similarity in the bonding properties and reactivity, despite the stronger pi-acceptor character of the tmbp ligand.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Die künstlichen Elemente Rutherfordium, Dubnium und Seaborgium werden an Schwerionenbeschleunigern erzeugt. Ihre chemische Untersuchung erfolgt mit computergesteuerten Apparaturen, z.B. ARCA (Automated Rapid Chemistry Apparatus). Ziel der Untersuchungen ist die Einordnung derElemente ins Periodensystem. Im einzelnen beschreibt die vorliegende Arbeit Experimente zur Fluorid- und Chlorid-Komplexierung von Rutherfordium und Dubnium, zum ionischen Zustand von Seaborgium in Nitratlösungen, zur Komplexierung von Seaborgium mit alpha-HIB sowie Vorexperimente zur Reduktion von Seaborgium.
Resumo:
Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost centre, and not as a process able to influence productive capacity and profit. It is also hindered by a lack of alignment between commonly used maintenance performance measures and key business drivers, and the lack of formal business training amongst maintenance professionals. With this in mind, a model to assist maintenance managers in evaluating the benefits of maintenance improvement projects was recently formulated. The model considers four cost saving dimensions. These are: 1. reduction in the cost of unplanned repairs and maintenance, 2. increased or accelerated production and/or sales, 3. spares inventory reduction, and 4. reduction in over-investment in physical assets and operating costs. This paper discusses the application of this model and a number of numerical examples are given to justify investments in maintenance improvement projects having varying objectives.
Resumo:
A study of clay chemistry has been approached with three aims: - to modify the conducting properties by intercalation of tetrathiafulvalene, - to study the electrochemistry of redox-active coordination compounds immobilised on clay coated electrodes, and - to study the role of clays as reagents in inorganic glass forming reactions using mainly solid-state magic-angle-spinning NMR. TTF was intercalated by smectites containing different interlayer and lattice cations. Evidence from ESR and 57Fe Mossbauer indicated charge-transfer from TTF to structural iron in natural montmorillonite, and to interlayer Cu2+ in Cu2+ exchanged laponite. No charge transfer was observed for laponite (Na+ form) itself. Ion exchange of TTF3(BF4)2 with laponite was found to proceed quantitatively. The intercalated species were believed to be (TTF)2+ dimers. Conductivity data showed an order of magnitude increase for the intercalated clays. The mechanism is thought to be ionic rather than CT as Na+ laponite showed a similar enhancement in conductivity. Mechanically robust colloidal clay films were prepared on platinum electrodes. After immersion in solutions containing redox active complexes [Co(bpy)3]3+ and [Cr(bpy)3]3+, the films became electroactive when a potential was applied. Cyclic voltammograms obtained for both complexes were found to be of the diffusion controlled type. For [Co(bpy)3]3+ immobilised on clay coated electrodes, a one-step oxidation and four-step reduction wave was observed corresponding to a one electron stepwise reversible reduction of Co(III), through Co(II), Co(I), Co(O) to Co(I) oxidation state. For [Cr(bpy)3]3+ the electrochemistry was complicated by the presence of additional waves corresponding to the dissociation of [Cr(bpy)3]3+ into the diaquo complex. ESR and diffuse reflectance data supported such a mechanism. 29Si, 27Al and 23Na MAS NMR spectroscopy, supported by powder XRD and FTIR, was used to probe the role of clays as reagents in glass forming reactions. 29Si MAS NMR was found to be a very sensitive technique for identifying the presence and relative abundance of crystalline and non-crystalline phases. In thermal reactions of laponite formation of new mineral phases such as forsterite, akermanite, sillimanite and diopside were detected. The relative abundance of each phase was dependent on thermal history, chemical nature and concentration of the modifier oxide present. In continuing work, the effect of selected oxides on the glass forming reactions of a model feldspar composition was investigated using solid state NMR alone. Addition of network modifying oxides generally produced less negative 29Si chemical shifts and larger linewidths corresponding to a wider distribution of Si-O-Si bond angles and lengths, and a dominant aluminosilicate phase with a less polymerised structure than the starting material. 29Si linewidths and 27Al chemical shifts were respectively correlated with cationic potential and Lewis acidity of the oxide cations. Anomalous Al(4) chemical shifts were thought to be due to precipitation of aluminate phases rather than a breakdown in Lowenstein's aluminium avoidance principle.
Resumo:
This thesis presents the study of a two-degree-of-freedom (2 DOF) nonlinear system consisting of two grounded linear oscillators coupled to two separate light weight nonlinear energy sinks of an essentially nonlinear stiffness. In this thesis, Targeted Energy Transfer (TET) and NES concept are introduced. Previous studies and research of Energy pumping and NES are presented. The characters in nonlinear energy pumping have been introduced at the start of the thesis. For the aim to design the application of a tremor reduction assessment device, the knowledge of tremor reduction has also been mentioned. Two main parties have been presented in the research: dynamical theoretic method of nonlinear energy pumping study and experiments of nonlinear vibration reduction model. In this thesis, nonlinear energy sink (NES) has been studied and used as a core attachment for the research. A new theoretic method of nonlinear vibration reduction which with two NESs has been attached to a primary system has been designed and tested with the technology of targeted energy transfer. Series connection and parallel connection structure systems have been designed to run the tests. Genetic algorithm has been used and presented in the thesis for searching the fit components. One more experiment has been tested with the final components. The results have been compared to find out most efficiency structure and components for the theoretic model. A tremor reduction experiment has been designed and presented in the thesis. The experiment is for designing an application for reducing human body tremor. By using the theoretic method earlier, the experiment has been designed and tested with a tremor reduction model. The experiment includes several tests, one single NES attached system and two NESs attached systems with different structures. The results of theoretic models and experiment models have been compared. The discussion has been made in the end. At the end of the thesis, some further work has been considered to designing the device of the tremor reduction.