1000 resultados para Spleen Volume


Relevância:

60.00% 60.00%

Publicador:

Resumo:

BACKGROUND: Anemia is considered a negative prognostic risk factor for survival in patients with myelofibrosis. Most patients with myelofibrosis are anemic, and 35-54 % present with anemia at diagnosis. Ruxolitinib, a potent inhibitor of Janus kinase (JAK) 1 and JAK2, was associated with an overall survival benefit and improvements in splenomegaly and patient-reported outcomes in patients with myelofibrosis in the two phase 3 COMFORT studies. Consistent with the ruxolitinib mechanism of action, anemia was a frequently reported adverse event. In clinical practice, anemia is sometimes managed with erythropoiesis-stimulating agents (ESAs). This post hoc analysis evaluated the safety and efficacy of concomitant ruxolitinib and ESA administration in patients enrolled in COMFORT-II, an open-label, phase 3 study comparing the efficacy and safety of ruxolitinib with best available therapy for treatment of myelofibrosis. Patients were randomized (2:1) to receive ruxolitinib 15 or 20 mg twice daily or best available therapy. Spleen volume was assessed by magnetic resonance imaging or computed tomography scan.

RESULTS: Thirteen of 146 ruxolitinib-treated patients had concomitant ESA administration (+ESA). The median exposure to ruxolitinib was 114 weeks in the +ESA group and 111 weeks in the overall ruxolitinib arm; the median ruxolitinib dose intensity was 33 mg/day for each group. Six weeks before the first ESA administration, 10 of the 13 patients had grade 3/4 hemoglobin abnormalities. These had improved to grade 2 in 7 of the 13 patients by 6 weeks after the first ESA administration. The rate of packed red blood cell transfusions per month within 12 weeks before and after first ESA administration remained the same in 1 patient, decreased in 2 patients, and increased in 3 patients; 7 patients remained transfusion independent. Reductions in splenomegaly were observed in 69 % of evaluable patients (9/13) following first ESA administration.

CONCLUSIONS: Concomitant use of an ESA with ruxolitinib was well tolerated and did not affect the efficacy of ruxolitinib. Further investigations evaluating the effects of ESAs to alleviate anemia in ruxolitinib-treated patients are warranted (ClinicalTrials.gov identifier, NCT00934544; July 6, 2009).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The effects of water and feed fasting for 24, 48 and 72 hours post-hatching on blood parameters (mean corpuscular volume, MCV; red blood-cell, RBC; hematocrit, HCT; hemoglobin, HGB; plasma glucose, CGP; plasma total protein, PP, and differential leukocytes count), and on body, liver, spleen, bursa, and yolk sac weights were analyzed. Erythrogram data were obtained with a blood cell counter. Total plasma protein and plasma glucose were determined by using the Bradford method (1976) and a glucose PAP liquiform kit (Labtest, cat. n. 84), respectively. Specific leukocyte counts were carried out on blood smears stained with Rosenfeld solution. According to the obtained data, water and feed post-hatching fasting reduced MCV values, which also were lower in males than that in females. Fasting for 48 hours promoted an increase in PP, while fasting for 72 hours reduced HCT. Chicks submitted to fasting presented lower body weights as compared to fed chicks, but their liver weight did not increase between 48 and 72 hours of age. Fasting decreased spleen weight, but bursa and yolk sac weight were not affected. Data showed that female and male chicks react in a similar way to post-hatching fasting, which affects body weight, liver and spleen weight, and HCT and PP values. Moreover, 72 hours of fasting affected more intensely HCT and MCV values.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: Autopsy determination of fatal hemorrhage as the cause of death is often a difficult diagnosis in forensic medicine. No quantitative system for accurately measuring the blood volume in a corpse has been developed. MATERIALS AND METHODS: This article describes the measurement and evaluation of the cross-sectional areas of major blood vessels, of the diameter of the right pulmonary artery, of the volumes of thoracic aorta and spleen on MDCT, and of the volumes of heart chambers on MRI in 65 autopsy-verified cases of fatal hemorrhage or no fatal hemorrhage. RESULTS: Most cases with a cause of death of "fatal hemorrhage" had collapsed vessels. The finding of a collapsed superior vena cava, main pulmonary artery, or right pulmonary artery was 100% specific for fatal hemorrhage. The mean volumes of the thoracic aorta and of each of the heart chambers and the mean cross-sectional areas of all vessels except the inferior vena cava and abdominal aorta were significantly smaller in fatal hemorrhage than in no fatal hemorrhage. CONCLUSION: For the quantitative differentiation of fatal hemorrhage from other causes of death, we propose a three-step algorithm with measurements of the diameter of the right pulmonary artery, the cross-sectional area of the main pulmonary artery, and the volume of the right atrium (specificity, 100%; sensitivity, 95%). However, this algorithm must be corroborated in a prospective study, which would eliminate the limitations of this study. Quantitative postmortem cross-sectional imaging might become a reliable objective method to assess the question of fatal hemorrhage in forensic medicine.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An unstructured mesh �nite volume discretisation method for simulating di�usion in anisotropic media in two-dimensional space is discussed. This technique is considered as an extension of the fully implicit hybrid control-volume �nite-element method and it retains the local continuity of the ux at the control volume faces. A least squares function recon- struction technique together with a new ux decomposition strategy is used to obtain an accurate ux approximation at the control volume face, ensuring that the overall accuracy of the spatial discretisation maintains second order. This paper highlights that the new technique coincides with the traditional shape function technique when the correction term is neglected and that it signi�cantly increases the accuracy of the previous linear scheme on coarse meshes when applied to media that exhibit very strong to extreme anisotropy ratios. It is concluded that the method can be used on both regular and irregular meshes, and appears independent of the mesh quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Report Hello fellow AITPM members, Welcome to the first edition of the AITPM National Newsletter for 2009! I trust we all had a relaxing break and managed to lose track of all things transport for just a little while. I know I had trouble doing so when hunting for a car space at the shopping centre, and experiencing new projects such as the Tugun Bypass – the new gateway between New South Wales and Queensland. Byron Bay is now as close as Noosa for those high profile beach goers of Brisbane. There was also my experience of the reduced posted speed of 90km/h on the Bruce Highway around the troublesome Gympie stretch, when returning from a short Fraser Coast holiday. I expect that this relatively inexpensive safety improvement will pay substantial dividends in terms of crash reduction. The Newsletter took its annual leave last month and is refreshed and ready for a new year to keep us all informed of the latest in traffic and transport engineering, planning and management. I would like to take this opportunity to acknowledge the ongoing significant contributions of many volunteers in the Newsletter’s production. Mr Andrew Hulse, AITPM’s Immediate Past National President, serves as the Editorial Coordinator on behalf of the Institute. Each Branch Committee also includes a Newsletter Coordinator and committee members frequently contribute as well. And the ongoing contributions of readers enable us to offer the Newsletter as a vehicle for dialogue and debate around our sector. If you would like to contribute please email AITPM’s administration officer Josephine Mitton at aitpm@aitpm.com or through your local Branch Committee. I would also like to welcome back on deck our Editor, Mr David Brown of Driven Media, who creates a fantastic package for us each month. Lastly, members would have received the Call for Papers for the AITPM 2009 National Conference, Traffic Beyond Tomorrow, to be held at the Adelaide Convention Centre between 5 – 7 August. Abstracts will be accepted up to 20 February 2009. We look forward to seeing everyone at this, our flagship event for the year. To all a good year ahead, Jon Bunker Post Script: We all will have seen through the media the enormous scale and nature of the two natural disasters Australia is experiencing at present. AITPM’s thoughts are with all of those members, family and friends who may be experiencing hardship as a result of the Victorian bushfires and North Queensland floods. AITPM is a not for profit organisation however the National Executive has taken the decision to donate in measure to the Red Cross Victorian Bushfire Disaster Relief fund and the Queensland Premier’s Disaster Relief fund as a gesture to support our fellow Australians in their time of need. Details about these funds can be found via the Victorian and Queensland Governments’ websites.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Report Hello fellow AITPM members, First I would like on behalf of all AITPM members to send our condolences to all who have been affected by February’s tragic bushfires in regional Victoria, and deliver our best wishes to all of those involved in the rebuilding efforts. Over time I expect that the Victorian Government’s Royal Commission will analyse the circumstances and put forward a range of measures which will improve fire safety in vulnerable areas. As transport professionals it will be important for us to consider the findings and look to undertaking any recommendations that relate to the work we do. Not only in Victoria, but nationwide. In particular, the importance of logistics was highlighted following the fire events. Donors across Australia were this time requested to donate money rather than goods, presumably due in part to problems associated with the transport system coping with additional uncoordinated freight load, whilst being needed to support emergency management vehicle and managed freight movements. Notwithstanding, it was wonderful to see otherwise difficult to obtain goods, such as animal feed, being donated from far afield and transported in kind by trucking operators. As stated in last month’s Newsletter, AITPM made a direct cash donation to the Red Cross Bushfire Appeal immediately following the events, and a further donation to the Queensland Premier’s Disaster Relief Fund to support recovery after the North Queensland floods, which claimed seven lives. Again, we will need to monitor how the rebuilding effort unfolds particularly in regional Victoria and centres including Ingham in North Queensland, but I would urge all AITPM members who are in a position to support the restoration of the affected communities to play a part, particularly over time once the initial shock subsides and the steady job of rebuilding is underway. Onto lighter matters, AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, being held in Adelaide from 5 to 7 August, is fast approaching. www.aitpm.com has all of the details about how to register, sponsor a booth, and so forth. We are looking forward to catching up with our conference “regulars” and meeting with new folks to AITPM, and Australian traffic and transport planning and management. Adelaide is one of my favourite places to visit and I’m looking forward to riding the light rail line extension through town and checking out progress on the road system development. Best regards all, Jon Bunker

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Report Hello fellow AITPM members, A few weeks ago we saw another example of all levels of Government pulling together in real time to try to deal with a major transport incident, this time it was container loads of ammonium nitrate falling off the Pacific Adventurer during Cyclone Hamish and the associated major oil spill due to piercing of its hull off Moreton Bay in southern Queensland. The oil spill was extensive, affecting beaches and estuaries from Moreton Island north to the Sunshine Coast; a coastal stretch of at least 60km. We saw the Queensland Government, Brisbane, Moreton Bay and Sunshine Coast Regional Council crews deployed quickly once the gravity of the situation was realised to clean up toxic oil on beaches and prevent extensive upstream contamination. Environmental agencies public and private were quick to respond to help affected wildlife. The Navy’s HMAS Yarra and another minesweeper were deployed to search for the containers in the coastal area in an effort to have them salvaged before all ammonium nitrate could leach into and harm marine habitat, which would have a substantial impact not only on that environment but also the fishing industry. all of this during the final fortnight before a State election.) While this could be branded as a maritime problem, the road transport and logistics system was crucial to the cleanup. The private vehicular ferries were enlisted to transport plant and equipment from Brisbane to Moreton Island. The plant themselves, such as graders, were drawn from road building and maintenance inventory. Hundreds of Councils’ staff were released from other activities to undertake the cleanup. While it will take some time for us to know the long term impacts of this incident, it seems difficult to fault “grassroots” government crews and their private counterparts, such as Island tourism staff, in the initial cleanup effort. From a traffic planning and management perspective, we should also remember that this sort of incident has happened on road and rail corridors in the past, albeit on lesser scales. It underlines that we do need to continue to protect communities, commercial interests, and the environment through rigorous heavy vehicle management, planning and management of dangerous goods routesincluding rail corridors through urban areas), and carefully considered incident and disaster recovery plans and protocols. I’d like to close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. SA Branch President Paul Morris informs me that we have had over 50 paper submissions to date, from which a very balanced and informative programme of sessions has been prepared. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Message Hello fellow AITPM members, We’ve been offered a lot of press lately about the Federal Government’s plan for the multibillion dollar rollout of its high speed broadband network, which at the moment is being rated to a speed of 100Mb/s. This seems fantastic in comparison to the not atypical 250 to 500kb/s that I receive on my metropolitan cable broadband, which incidentally my service provider rates at theoretical speeds of up to 8 Mb/s. I have no doubt that such a scheme will generate significant advantages to business and consumers. However, I also have some reservations. Only a few of years ago I marvelled at my first 256Mb USB stick, which cost my employer about $90. Last month I purchased a 16Gb stick with a free computer carry bag for $80, which on the back of my envelope has given me about 72 times the value of my first USB stick not including the carry bag! I am pretty sure the technology industry will find a way to eventually push a lot more than 100Mb/s down the optic fibre network just as they have done with pushing several Mb/s ADSL2 down antique copper wire. This makes me wonder about the general problem of inbuilt obsolescence of all things high-tech due to rapid advances in the tech industry. As a transport professional I then think to myself that our industry has been moving forward at somewhat of a slower pace. We certainly have had major milestones having significant impacts, such as the move from horse and cart to the self propelled motor vehicle, sealing and formal geometric design of roads, development of motorways, signalisation of intersections, coordination of networks, to simulation modelling for real time adaptive control (perhaps major change has been at a frequency of 30 years or so?). But now with ITS truly penetrating the transport market, largely thanks to the in-car GPS navigator, smart phone, e-toll and e-ticket, I believe that to avoid our own obsolescence we’re going to need to “plan for ITS” rather than just what we seem to have been doing up until now, that is, to get it out there. And we’ll likely need to do it at a faster pace. It will involve understanding how to data mine enormous data sets, better understanding the human/machine interface, keeping pace with automotive technology more closely, resolving the ethical and privacy chestnuts, and in the main actually planning for ITS to make peoples’ lives easier rather than harder. And in amongst this we’ll need to keep pace with the types of technology advances similar to my USB stick example above. All the while we’ll be making a brand new set of friends in the disciplines that will morph into ITS along with us. Hopefully these will all be “good” problems for our profession to have. I should close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker