985 resultados para Software projects
Resumo:
Software engineering is criticized as not being engineering or 'well-developed' science at all. Software engineers seem not to know exactly how long their projects will last, what they will cost, and will the software work properly after release. Measurements have to be taken in software projects to improve this situation. It is of limited use to only collect metrics afterwards. The values of the relevant metrics have to be predicted, too. The predictions (i.e. estimates) form the basis for proper project management. One of the most painful problems in software projects is effort estimation. It has a clear and central effect on other project attributes like cost and schedule, and to product attributes like size and quality. Effort estimation can be used for several purposes. In this thesis only the effort estimation in software projects for project management purposes is discussed. There is a short introduction to the measurement issues, and some metrics relevantin estimation context are presented. Effort estimation methods are covered quite broadly. The main new contribution in this thesis is the new estimation model that has been created. It takes use of the basic concepts of Function Point Analysis, but avoids the problems and pitfalls found in the method. It is relativelyeasy to use and learn. Effort estimation accuracy has significantly improved after taking this model into use. A major innovation related to the new estimationmodel is the identified need for hierarchical software size measurement. The author of this thesis has developed a three level solution for the estimation model. All currently used size metrics are static in nature, but this new proposed metric is dynamic. It takes use of the increased understanding of the nature of the work as specification and design work proceeds. It thus 'grows up' along with software projects. The effort estimation model development is not possible without gathering and analyzing history data. However, there are many problems with data in software engineering. A major roadblock is the amount and quality of data available. This thesis shows some useful techniques that have been successful in gathering and analyzing the data needed. An estimation process is needed to ensure that methods are used in a proper way, estimates are stored, reported and analyzed properly, and they are used for project management activities. A higher mechanism called measurement framework is also introduced shortly. The purpose of the framework is to define and maintain a measurement or estimationprocess. Without a proper framework, the estimation capability of an organization declines. It requires effort even to maintain an achieved level of estimationaccuracy. Estimation results in several successive releases are analyzed. It isclearly seen that the new estimation model works and the estimation improvementactions have been successful. The calibration of the hierarchical model is a critical activity. An example is shown to shed more light on the calibration and the model itself. There are also remarks about the sensitivity of the model. Finally, an example of usage is shown.
Resumo:
Agile software development methods are attempting to provide an answer to the software development industry's need of lighter weight, more agile processes that offer the possibility to react to changes during the software development process. The objective of this thesis is to analyze and experiment the possibility of using agile methods or practices also in small software projects, even in projects containing only one developer. In the practical part of the thesis a small software project was executed with some agile methods and practices that in the theoretical part of the thesis were found possible to be applied to the project. In the project a Bluetooth proxy application that is run in the S60 smartphone platform and PC was developed further to contain some new features. As a result it was found that certain agile practices can be useful even in the very small projects. The selection of the suitable practices depends on the project and the size of the project team.
Resumo:
The question of Pilot Project creation, due to support pre-development stage of software product elaboration, nowadays might be used as an approach, which allows improving the whole scheme of information technology project running. This subject is not new, but till now no model has been presented, which gives deep description of this important stage on the early phase of project. This Master's Thesis represents the research's results and findings concerning the pre-development study from the Software Engineering point of view. The aspects of feasibility study, pilot prototype developments are analyzed in this paper. As the result, the technique of Pilot Project is formulated and scheme has been presented. The experimental part is focused on particular area Pilot Project scheme's implementation- Internationally Distributed Software projects. The specific characteristic, aspects, obstacles, advantages and disadvantages are considered on the example of cross border region of Russia and Finland. The real case of Pilot Project technique implementation is given.
Resumo:
Vaatimusmäärittelyn tavoitteena on luoda halutun järjestelmän kokonaisen, yhtenäisen vaatimusluettelon vaatimusten määrittämiseksi käsitteellisellä tasolla. Liiketoimintaprosessien mallintaminen on varsin hyödyllinen vaatimusmäärittelyn varhaisissa vaiheissa. Tämä työ tutkii liiketoimintaprosessien mallintamista tietojärjestelmien kehittämistä varten. Nykyään on olemassa erilaisia liiketoimintaprosessien mallintamiseen tarkoitettuja tekniikoita. Tämä työ tarkastaa liiketoimintaprosessien mallintamisen periaatteet ja näkökohdat sekä eri mallinnustekniikoita. Uusi menetelmä, joka on suunniteltu erityisesti pienille ja keskisuurille ohjelmistoprojekteille, on kehitetty prosessinäkökohtien ja UML-kaavioiden perusteella.
Resumo:
Open source and open source software development have been interesting phenomena during the past decade. Traditional business models do not apply with open source, where the actual product is free. However, it is possible to make business with open source, even successfully, but the question is: how? The aim of this study is to find the key factors of successfully making business out of commercial open source software development. The task is achieved by finding the factors that influence open source projects, finding the relation between those factors, and find out why some factors explain the success more than others. The literature review concentrates first on background of open innovation, open source and open source software. Then business models, critical success factors and success measures are examined. Based on existing literature a framework was created. The framework contains categorized success factors that influence software projects in general as well as open source software projects. The main categories of success factors in software business are divided into community management, technology management, project management and market management. In order to find out which of the factors based on the existing literature are the most critical, empirical research was done by conducting unstructured personal interviews. The main finding based on the interviews is that the critical success factors in open source software business do not differ from those in traditional software business or in fact from those in any other business. Some factors in the framework came out in the interviews that can be considered as key factors: establishing and communicating hierarchy (community management), localization (technology management), good license know-how and IPR management (project management), and effective market management (market management). The critical success factors according to the interviewees are not listed in the framework: low price, good product and good business model development.
Resumo:
In businesses such as the software industry, which uses knowledge as a resource, activities are knowledge intensive, requiring constant adoption of new technologies and practices. Another feature of this environment is that the industry is particularly susceptible to failure; with this in mind, the objective of this research is to analyze the integration of Knowledge Management techniques into the activity of risk management as it applies to software development projects of micro and small Brazilian incubated technology-based firms. Research methods chosen were the Multiple Case Study. The main risk factor for managers and developers is that scope or goals are often unclear or misinterpreted. For risk management, firms have found that Knowledge Management techniques of conversion combination would be the most applicable for use; however, those most commonly used refer to the conversion mode as internalization.. © 2013 Elsevier Ltd. APM and IPMA.
Resumo:
Gaining economic benefits from substantially lower labor costs has been reported as a major reason for offshoring labor-intensive information systems services to low-wage countries. However, if wage differences are so high, why is there such a high level of variation in the economic success between offshored IS projects? This study argues that offshore outsourcing involves a number of extra costs for the ^his paper was recommended for acceptance by Associate Guest Editor Erran Carmel. client organization that account for the economic failure of offshore projects. The objective is to disaggregate these extra costs into their constituent parts and to explain why they differ between offshored software projects. The focus is on software development and maintenance projects that are offshored to Indian vendors. A theoretical framework is developed a priori based on transaction cost economics (TCE) and the knowledge-based view of the firm, comple mented by factors that acknowledge the specific offshore context The framework is empirically explored using a multiple case study design including six offshored software projects in a large German financial service institution. The results of our analysis indicate that the client incurs post contractual extra costs for four types of activities: (1) re quirements specification and design, (2) knowledge transfer, (3) control, and (4) coordination. In projects that require a high level of client-specific knowledge about idiosyncratic business processes and software systems, these extra costs were found to be substantially higher than in projects where more general knowledge was needed. Notably, these costs most often arose independently from the threat of oppor tunistic behavior, challenging the predominant TCE logic of market failure. Rather, the client extra costs were parti cularly high in client-specific projects because the effort for managing the consequences of the knowledge asymmetries between client and vendor was particularly high in these projects. Prior experiences of the vendor with related client projects were found to reduce the level of extra costs but could not fully offset the increase in extra costs in highly client-specific projects. Moreover, cultural and geographic distance between client and vendor as well as personnel turnover were found to increase client extra costs. Slight evidence was found, however, that the cost-increasing impact of these factors was also leveraged in projects with a high level of required client-specific knowledge (moderator effect).
Resumo:
Given the centrality of control for achieving success in outsourced software projects, past research has identified key exogenous factors that determine the choice of controls. This view of exogenously driven control choice is based on a number of assumptions; particularly, clients and vendors are seen as separate cognitive entities that combat opportunistic threats under environmental uncertainty by one-off choices or infrequent revisions of controls. In this paper we complement this perspective by acknowledging that an outsourced software project may be characterized as a collective, evolving process faced with the challenge of coping with cognitive limitations of both client and vendor through a continuous process of learning. We argue that if viewed in this way, controls are less subject of a deliberate choice but rather are subject of endogenously driven change, i.e. controls evolve in close interaction with the evolving software project. Accordingly, we suggest a complementary model of endogenous control, where controls mediate individual and collective learning processes. Our research contributes to a better understanding of the dynamics in outsourced software projects. It also spells out methodological implications that may help improve cross-section control research.
Resumo:
We have attempted to bring together two areas which are challenging for both IS research and practice: forms of coordination and management of knowledge in the context of global, virtual software development projects. We developed a more comprehensive, knowledge-based model of how coordination can be achieved, and\illustrated the heuristic and explanatory power of the model when applied to global software projects experiencing different degrees of success. We first reviewed the literature on coordination and determined what is known about coordination of knowledge in global software projects. From this we developed a new, distinctive knowledge-based model of coordination, which was then employed to analyze two case studies of global software projects, at SAP and Baan, to illustrate the utility of the model.
Resumo:
The Corporate world is becoming more and more competitive. This leads organisations to adapt to this reality, by adopting more efficient processes, which result in a decrease in cost as well as an increase of product quality. One of these processes consists in making proposals to clients, which necessarily include a cost estimation of the project. This estimation is the main focus of this project. In particular, one of the goals is to evaluate which estimation models fit the Altran Portugal software factory the most, the organization where the fieldwork of this thesis will be carried out. There is no broad agreement about which is the type of estimation model more suitable to be used in software projects. Concerning contexts where there is plenty of objective information available to be used as input to an estimation model, model-based methods usually yield better results than the expert judgment. However, what happens more frequently is not having this volume and quality of information, which has a negative impact in the model-based methods performance, favouring the usage of expert judgement. In practice, most organisations use expert judgment, making themselves dependent on the expert. A common problem found is that the performance of the expert’s estimation depends on his previous experience with identical projects. This means that when new types of projects arrive, the estimation will have an unpredictable accuracy. Moreover, different experts will make different estimates, based on their individual experience. As a result, the company will not directly attain a continuous growing knowledge about how the estimate should be carried. Estimation models depend on the input information collected from previous projects, the size of the project database and the resources available. Altran currently does not store the input information from previous projects in a systematic way. It has a small project database and a team of experts. Our work is targeted to companies that operate in similar contexts. We start by gathering information from the organisation in order to identify which estimation approaches can be applied considering the organization’s context. A gap analysis is used to understand what type of information the company would have to collect so that other approaches would become available. Based on our assessment, in our opinion, expert judgment is the most adequate approach for Altran Portugal, in the current context. We analysed past development and evolution projects from Altran Portugal and assessed their estimates. This resulted in the identification of common estimation deviations, errors, and patterns, which lead to the proposal of metrics to help estimators produce estimates leveraging past projects quantitative and qualitative information in a convenient way. This dissertation aims to contribute to more realistic estimates, by identifying shortcomings in the current estimation process and supporting the self-improvement of the process, by gathering as much relevant information as possible from each finished project.
Resumo:
Knowledge processes are critical to outsourced software projects. According to outsourcing research, outsourced software projects succeed if they manage to integrate the client’s business knowledge and the vendor’s technical knowledge. In this paper, we submit that this view may not be wrong, but incomplete in a significant part of outsourced software work, which is software maintenance. Data from six software-maintenance outsourcing transitions indicate that more important than business or technical knowledge can be application knowledge, which vendor engineers acquire over time during practice. Application knowledge was the dominant knowledge during knowledge transfer activities and its acquisition enabled vendor staff to solve maintenance tasks. We discuss implications for widespread assumptions in outsourcing research.
Resumo:
Thousands of Free and Open Source Software Projects (FSP) were, and continually are, created on the Internet. This scenario increases the number of opportunities to collaborate to the same extent that it promotes competition for users and contributors, who can guide projects to superior levels, unachievable by founders alone. Thus, given that the main goal of FSP founders is to improve their projects by means of collaboration, the importance to understand and manage the capacity of attracting users and contributors to the project is established. To support researchers and founders in this challenge, the concept of attractiveness is introduced in this paper, which develops a theoretical-managerial toolkit about the causes, indicators and consequences of attractiveness, enabling its strategic management.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics