816 resultados para Small Hydroelectric Power Plant
Resumo:
Balancing power production and environmental conservation can be problematic. The objective of this study was to investigate the abundance of marsh deer in the Paraná River Basin, above the Sergio Motta (Porto Primavera) Dam, before and after the impact of the dam closure. A fixed-wing, flat window aircraft was used to survey study transects. Observations were recorded based on the distance sampling line transect method, assuming that the detection probability decreases with increased distance. The abundance of marsh deer in the survey region prior to flooding was estimated to be 974 individuals (CV = 0.23). The overall abundance dropped from 974 to 444 (CV = 0.26) individuals after flooding, an overall reduction of 54%. This reduction can be attributed to the direct impact of the flooding process, but it was likely exacerbated by indirect effects, such as increased disease, hunting, and reduction in food availability. Prior to flooding, the marsh deer was distributed widely throughout the dam's catchment area; however, the marsh deer habitat was almost completely destroyed by the flooding process. This situation highlights the need to implement management strategies that ensure the survival of the remaining fragmented population.
Resumo:
The hydroelectric power plant Hidroltuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in connecting Hidroltuango, in order to strengthen the Colombian national transmission system. A Mixed Binary Linear Programming (MBLP) model was used to solve the Multistage Transmission Network Expansion Planning (MTEP) problem of the Colombian electrical system, taking the N-1 safety criterion into account. The N-1 safety criterion indicates that the transmission system must be expanded so that the system will continue to operate properly if an outage in a system element (within a pre-defined set of contingencies) occurs. The use of a MBLP model guaranteed the convergence with existing classical optimization methods and the optimal solution for the MTEP using commercial solvers. Multiple scenarios for generation and demand were used to consider uncertainties within these parameters. The model was implemented using the algebraic modeling language AMPL and solved using the commercial solver CPLEX. The proposed model was then applied to the Colombian electrical system using the planning horizon of 2018-2025. (C) 2014 Elsevier B.V. All rights reserved.
Resumo:
"Program opportunity notice (PON) number DE-PN-07-79-ID-12043."
Resumo:
It is acknowledged that wind power is a stochastic energy source compared to hydroelectric generation which is easily scheduled. In this paper a scheme for coordinating wind power plant and hydroelectric power plant is presented by using PMUs to measure and control the state of wind and hydro power plants. Hydroelectric generation is proposed as a method of energy reserve and compensation in the context of wind power fluctuation in order to avoid full or partial curtailment of wind generation to benefit wind providers. The feasibility of this proposed scheme is investigated by power flow calculation and stability analysis using the IEEE 30-bus power system model.
Resumo:
Tem crescido a demanda por energia em todo o mundo. No Brasil, com o aquecimento da economia aumentam ainda mais as pressões. O parque gerador Brasileiro é fortemente baseado na geração hidrelétrica, que representa aproximadamente 77,6% da oferta de geração de eletricidade. Entre os impactos ambientais gerados pela construção de barragens e reservatórios de aproveitamentos hidrelétricos está a mudança do regime fluvial de jusante, a chamada vazão remanescente. Entre outros, esta vazão deve garantir as condições adequadas à sobrevivência e continuação das espécies e dos ecossistemas, associando as necessidades humanas, ambientais e as características de cada região. Tomou-se como objeto de análise dois estudos de caso, a pequena central hidrelétrica (PCH) Santa Gabriela, localizada no rio Correntes, na divisa entre os estados de Mato Grosso e Mato Grosso do Sul e a usina hidrelétrica (UHE) Batalha, situada no rio São Marcos, na divisa entre os estados de Minas Gerais e Goiás. Embora o assunto seja discutido amplamente pela comunidade técnica e acadêmica, não há ainda nos marcos legais Brasileiros associados, uma definição explícita de critérios ou limites para estabelecimento da vazão remanescente. Em geral, as legislações estaduais estabelecem valores máximos outorgáveis determinados a partir de percentuais da curva de permanência (Q90, Q95) ou da vazão mínima anual de sete dias de duração e tempo de recorrência de 10 anos Q7,10, garantindo consequentemente as vazões mínimas remanescentes. Essas metodologias implicam num único valor fixo para a vazão ao longo do ano, o que não condiz com a realidade do regime hidrológico natural. Estudos atuais apontam para um hidrograma ecológico, que represente a variação das vazões entre os meses de estiagem e cheia. Assim, a metodologia envolveu a comparação entre critérios de outorga utilizados em alguns estados Q90, Q95 e Q7,10 e métodos citados na literatura para estudo da vazão ecológica (Tennant, Texas, Vazão Base e Perímetro Molhado) e as Resoluções referentes à Declaração de Reserva de Disponibilidade Hídrica (DRDH) das usinas, que especificam a vazão remanescente nas fases de enchimento e operação, emitidas pela Agência Nacional de Águas (ANA). Observaram-se valores de vazões substancialmente diferenciados entre os seis métodos empregados. Cabe destacar, que representa um avanço a publicação do Manual de Estudos de Disponibilidade Hídrica para Aproveitamentos Hidrelétricos (ANA, 2009), que visa à padronização dos documentos para fins obtenção da DRDH e da outorga do uso do potencial de energia hidráulica em corpo de água de domínio da União. Assim, o empreendedor poderá propor e negociar a demanda hídrica para as necessidades ambientais com as autoridades competentes, o que deverá ser discutido em reunião técnica inicial que deverá contar com a participação da Agência Nacional de Energia Elétrica (ANEEL), ANA, órgão ambiental, empreendedor e a empresa responsável pelos estudos ambientais.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by darns established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible.
Resumo:
In this work, experimental results are reported for a small scale cogeneration plant for power and refrigeration purposes. The plant includes a natural gas microturbine and an ammonia/water absorption chiller fired by steam. The system was tested under different turbine loads, steam pressures and chiller outlet temperatures. An evaluation based on the 1st and 2nd Laws of Thermodynamics was also performed. For the ambient temperature around 24°C and microturbine at full load, the plant is able to provide 19 kW of saturated steam at 5.3 bar (161 °C), corresponding to 9.2 kW of refrigeration at -5 °C (COP = 0.44). From a 2nd law point-of-view, it was found that there is an optimal chiller outlet temperature that maximizes the chiller exergetic efficiency. As expected, the microturbine presented the highest irreversibilities, followed by the absorption chiller and the HRSG. In order to reduce the plant exergy destruction, it is recommended a new design for the HRSG and a new insulation for the exhaust pipe. © 2013 Elsevier Ltd. All rights reserved.
Resumo:
Species occurrence and abundance models are important tools that can be used in biodiversity conservation, and can be applied to predict or plan actions needed to mitigate the environmental impacts of hydropower dams. In this study our objectives were: (i) to model the occurrence and abundance of threatened plant species, (ii) to verify the relationship between predicted occurrence and true abundance, and (iii) to assess whether models based on abundance are more effective in predicting species occurrence than those based on presence–absence data. Individual representatives of nine species were counted within 388 randomly georeferenced plots (10 m × 50 m) around the Barra Grande hydropower dam reservoir in southern Brazil. We modelled their relationship with 15 environmental variables using both occurrence (Generalised Linear Models) and abundance data (Hurdle and Zero-Inflated models). Overall, occurrence models were more accurate than abundance models. For all species, observed abundance was significantly, although not strongly, correlated with the probability of occurrence. This correlation lost significance when zero-abundance (absence) sites were excluded from analysis, but only when this entailed a substantial drop in sample size. The same occurred when analysing relationships between abundance and probability of occurrence from previously published studies on a range of different species, suggesting that future studies could potentially use probability of occurrence as an approximate indicator of abundance when the latter is not possible to obtain. This possibility might, however, depend on life history traits of the species in question, with some traits favouring a relationship between occurrence and abundance. Reconstructing species abundance patterns from occurrence could be an important tool for conservation planning and the management of threatened species, allowing scientists to indicate the best areas for collection and reintroduction of plant germplasm or choose conservation areas most likely to maintain viable populations.
Resumo:
Thesis (Master's)--University of Washington, 2016-06
Resumo:
The research analyses the former and the current status of the small gas-motor power plant investments in the Hungarian energy sector. It discusses the development of project financing in the segment and the major changes and effects of new regulations and subsidy-policy implemented in 2010. The objective of this paper is to present the results of an empirical research of the so called GCHP projects, and to draw conclusion concerning how classic project financing conditions were present and changed during the last decade, and how regulation affected the current and future financial status of these projects.
Resumo:
This paper presents a novel power control strategy that decouples the active and reactive power for a synchronous generator connected to a power network. The proposed control paradigm considers the capacitance of the transmission line along with its resistance and reactance as-well. Moreover the proposed controller takes into account all cases of R-X relationships, thus allowing it to function in Virtual Power Plant (VPP) structures which operate at both medium voltage (MV) and low voltage (LV) levels. The independent control of active and reactive power is achieved through rotational transformations of the terminal voltages and currents at the synchronous generator's output. This paper details the control technique by first presenting the mathematical and electrical network analysis of the methodology and then successfully implementing the control using MATLAB-SIMULINK simulation.
Resumo:
This case study was conducted to explore the perceptions of health risk messages sent by the Japanese Government following the Fukushima nuclear power plant disaster. The content of health risk messages from the Japanese Government and the Japanese national broadcaster (NHK) were analysed and semi-structured interviews were conducted with a sample of Tokyo residents. Initially, participants trusted these messages but as the crisis unfolded they became sceptical about the messages. Participants felt the messages did not communicate health risk information effectively because the messages were; not supported by evidence, inconsistent, delayed and changed over time. Despite widespread access to the internet, social media and mobile telephones, most participants relied on television news for information about the health risks. The Japanese Government urgently needs to re-build trust by engaging the community in the planning and development phases of health risk communication strategies.