977 resultados para Small Hydroelectric Generation


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thesis (Master's)--University of Washington, 2016-06

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Representative Life-Cycle Inventories (LCIs) are essential for Life-Cycle Assessments (LCAs) quality and readiness. Because energy is such an important element of LCAs, appropriate LCIs on energy are crucial, and due to the prevalence of hydropower on Brazilian electricity mix, the frequently used LCIs are not representative of the Brazilian conditions. The present study developed a LCI of the Itaipu Hydropower Plant, the major hydropower plant in the world, responsible for producing 23.8% of Brazil's electricity consumption. Focused on the capital investments to construct and operate the dam, the LCI was designed to serve as a database for the LCAs of Brazilian hydroelectricity production. The life-cycle boundaries encompass the construction and operation of the dam, as well as the life-cycles of the most important material and energy consumptions (cement, steel, copper, diesel oil, lubricant oil), as well as construction site operation, emissions from reservoir flooding, material and workers transportation, and earthworks. As a result, besides the presented inventory, it was possible to determine the following processes, and respective environmental burdens as the most important life-cycle hotspots: reservoir filling (CO(2) and CH(4) emission: land use); steel life-cycle (water and energy consumption; CO, particulates, SO(x) and NO(x) emissions); cement life-cycle (water and energy consumption; CO(2) and particulate emissions); and operation of civil construction machines (diesel consumption; NO(x) emissions). Compared with another hydropower studies, the LCI showed magnitude adequacy, with better results than small hydropower, which reveals a scale economy for material and energy exchanges in the case of ltaipu Power Plant. (C) 2009 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Program opportunity notice (PON) number DE-PN-07-79-ID-12043."

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Tem crescido a demanda por energia em todo o mundo. No Brasil, com o aquecimento da economia aumentam ainda mais as pressões. O parque gerador Brasileiro é fortemente baseado na geração hidrelétrica, que representa aproximadamente 77,6% da oferta de geração de eletricidade. Entre os impactos ambientais gerados pela construção de barragens e reservatórios de aproveitamentos hidrelétricos está a mudança do regime fluvial de jusante, a chamada vazão remanescente. Entre outros, esta vazão deve garantir as condições adequadas à sobrevivência e continuação das espécies e dos ecossistemas, associando as necessidades humanas, ambientais e as características de cada região. Tomou-se como objeto de análise dois estudos de caso, a pequena central hidrelétrica (PCH) Santa Gabriela, localizada no rio Correntes, na divisa entre os estados de Mato Grosso e Mato Grosso do Sul e a usina hidrelétrica (UHE) Batalha, situada no rio São Marcos, na divisa entre os estados de Minas Gerais e Goiás. Embora o assunto seja discutido amplamente pela comunidade técnica e acadêmica, não há ainda nos marcos legais Brasileiros associados, uma definição explícita de critérios ou limites para estabelecimento da vazão remanescente. Em geral, as legislações estaduais estabelecem valores máximos outorgáveis determinados a partir de percentuais da curva de permanência (Q90, Q95) ou da vazão mínima anual de sete dias de duração e tempo de recorrência de 10 anos Q7,10, garantindo consequentemente as vazões mínimas remanescentes. Essas metodologias implicam num único valor fixo para a vazão ao longo do ano, o que não condiz com a realidade do regime hidrológico natural. Estudos atuais apontam para um hidrograma ecológico, que represente a variação das vazões entre os meses de estiagem e cheia. Assim, a metodologia envolveu a comparação entre critérios de outorga utilizados em alguns estados Q90, Q95 e Q7,10 e métodos citados na literatura para estudo da vazão ecológica (Tennant, Texas, Vazão Base e Perímetro Molhado) e as Resoluções referentes à Declaração de Reserva de Disponibilidade Hídrica (DRDH) das usinas, que especificam a vazão remanescente nas fases de enchimento e operação, emitidas pela Agência Nacional de Águas (ANA). Observaram-se valores de vazões substancialmente diferenciados entre os seis métodos empregados. Cabe destacar, que representa um avanço a publicação do Manual de Estudos de Disponibilidade Hídrica para Aproveitamentos Hidrelétricos (ANA, 2009), que visa à padronização dos documentos para fins obtenção da DRDH e da outorga do uso do potencial de energia hidráulica em corpo de água de domínio da União. Assim, o empreendedor poderá propor e negociar a demanda hídrica para as necessidades ambientais com as autoridades competentes, o que deverá ser discutido em reunião técnica inicial que deverá contar com a participação da Agência Nacional de Energia Elétrica (ANEEL), ANA, órgão ambiental, empreendedor e a empresa responsável pelos estudos ambientais.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Synchronisation of small distributed generation, 30 kVA–2 MVA, employing salient-pole synchronous machines is normally performed within a narrow range of tolerances for voltage, frequency and phase angle. However, there are situations when the ability to synchronise with non-ideal conditions would be beneficial. Such applications include power system islanding and rapid generator start-up. The physical process and effect of out-of-phase synchronisation is investigated both through simulation and experimental tests on a salient-pole alternator. There are many factors that affect synchronisation, but particular attention is given to synchronisation angle, voltage difference and, as generators will be loaded during islanding, the load angle. The results suggest that it would be acceptable for the maximum synchronisation angle of distributed generation to exceed that of current practice. Interesting observations on the nature of out-of-phase synchronisation are made, including some specific to small salient-pole synchronous machines. Furthermore, recommendations are made for synchronisation under different system conditions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

It is acknowledged that wind power is a stochastic energy source compared to hydroelectric generation which is easily scheduled. In this paper a scheme for coordinating wind power plant and hydroelectric power plant is presented by using PMUs to measure and control the state of wind and hydro power plants. Hydroelectric generation is proposed as a method of energy reserve and compensation in the context of wind power fluctuation in order to avoid full or partial curtailment of wind generation to benefit wind providers. The feasibility of this proposed scheme is investigated by power flow calculation and stability analysis using the IEEE 30-bus power system model.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper introduces a novel load sharing algorithm to enable island synchronization. The system model used for development is based on an actual system for which historical measurement and fault data is available and is used to refine and test the algorithms performance and validity. The electrical system modelled is selected due to its high-level of hydroelectric generation and its history of islanding events. The process of developing the load sharing algorithm includes a number of steps. Firstly, the development of a simulation model to represent the case study accurately - this is validated by way of matching system behavior based on data from historical island events. Next, a generic island simulation is used to develop the load sharing algorithm. The algorithm is then tested against the validated simulation model representing the case study area selected. Finally, a laboratory setup is described which is used as validation method for the novel load sharing algorithm.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This work analyzes the entry problem in the hydroelectric generation industry. The operation of a generator upstream regularizes the river flow for generators located downstream on the same river, increasing the production capacity of the latter. This positive externality increases the attractiveness of the locations downstream whenever a generator decides to enter upstream. Therefore, the entry decision of a generator in a given location may affect all entry decisions in potential locations for plants downstream. I first model the problem of generators located in cascade on the same river to show the positive effect of the externality. Next, I develop a method to estimate an entry model specific to the hydro generation industry which takes into account the externality of the entry decisions. Finally, I use a data set on investment decisions of Brazilian hydro-generators to estimate the model. The results show a positive incentive to locate downstream from existing plants and from locations where entry is likely to occur. An interesting by-product of the analysis is that the year effects’ estimates show an increase one year before the energy crisis of 2001, providing evidence that the market anticipated the crisis. It contradicts the governmental version that the crisis was due to an unexpected drought.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Energia na Agricultura) - FCA

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Energia na Agricultura) - FCA

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Pós-graduação em Agronomia (Energia na Agricultura) - FCA

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The complete mitochondrial genome and a set of polymorphic microsatellite markers were identified by 454 pyrosequencing (1/16th of a plate) for the New Caledonian rainforest spider-ant Leptomyrmex pallens. De novo genome assembly recovered the entire mitochondrial genome with mean coverage of 8.9-fold (range 1-27). The mitogenome consists of 15,591 base pairs including 13 protein-coding genes, 2 ribosomal subunit genes, 22 transfer RNAs, and a non-coding AT-rich region. The genome arrangement is typical of insect taxa and very similar to the only other published ant mitogenome from the Solenopsis genus, with the main differences consisting of translocations and inversions of tRNAs. A total of 13 polymorphic loci were also characterized using 41 individuals from a single population in the Aoupinié region, corresponding to workers from 21 nests and 16 foraging workers. We observed moderate genetic variation across most loci (mean number of alleles per locus = 4.50; mean expected heterozygosity = 0.53) with evidence of only two loci deviating significantly from Hardy-Weinberg equilibrium due to null alleles. Marker independence was confirmed with tests for linkage disequilibrium. Most loci cross amplified for three additional Leptomyrmex species. The annotation of the mitogenome and characterization of microsatellite markers will provide useful tools for assessing the colony structure, population genetic patterns, and dispersal strategy of L. pallens in the context of rainforest fragmentation in New Caledonia. Furthermore, this paper confirms a recent line of evidence that comprehensive mitochondrial data can be obtained relatively easily from small next-generation sequencing analyses. Greater synthesis of next-generation sequencing data will play a significant role in expanding the taxonomic representation of mitochondrial genome sequences.