961 resultados para Siting and sizing
Resumo:
Some uncertainties such as the stochastic input/output power of a plug-in electric vehicle due to its stochastic charging and discharging schedule, that of a wind unit and that of a photovoltaic generation source, volatile fuel prices and future uncertain load growth, all together could lead to some risks in determining the optimal siting and sizing of distributed generators (DGs) in distributed systems. Given this background, under the chance constrained programming (CCP) framework, a new method is presented to handle these uncertainties in the optimal sitting and sizing problem of DGs. First, a mathematical model of CCP is developed with the minimization of DGs investment cost, operational cost and maintenance cost as well as the network loss cost as the objective, security limitations as constraints, the sitting and sizing of DGs as optimization variables. Then, a Monte Carolo simulation embedded genetic algorithm approach is developed to solve the developed CCP model. Finally, the IEEE 37-node test feeder is employed to verify the feasibility and effectiveness of the developed model and method. This work is supported by an Australian Commonwealth Scientific and Industrial Research Organisation (CSIRO) Project on Intelligent Grids Under the Energy Transformed Flagship, and Project from Jiangxi Power Company.
Resumo:
Traditionally, siting and sizing decisions for parks and reserves reflected ecological characteristics but typically failed to consider ecological costs created from displaced resource collection, welfare costs on nearby rural people, and enforcement costs. Using a spatial game-theoretic model that incorporates the interaction of socioeconomic and ecological settings, we show how incorporating more recent mandates that include rural welfare and surrounding landscapes can result in very different optimal sizing decisions. The model informs our discussion of recent forest management in Tanzania, reserve sizing and siting decisions, estimating reserve effectiveness, and determining patterns of avoided forest degradation in Reduced Emissions from Deforestation and Forest Degradation programs.
Resumo:
To allocate and size capacitors in a distribution system, an optimization algorithm, called Discrete Particle Swarm Optimization (DPSO), is employed in this paper. The objective is to minimize the transmission line loss cost plus capacitors cost. During the optimization procedure, the bus voltage, the feeder current and the reactive power flowing back to the source side should be maintained within standard levels. To validate the proposed method, the semi-urban distribution system that is connected to bus 2 of the Roy Billinton Test System (RBTS) is used. This 37-bus distribution system has 22 loads being located in the secondary side of a distribution substation (33/11 kV). Reducing the transmission line loss in a standard system, in which the transmission line loss consists of only about 6.6 percent of total power, the capabilities of the proposed technique are seen to be validated.
Resumo:
In this paper, the placement and sizing of Distributed Generators (DG) in distribution networks are determined optimally. The objective is to minimize the loss and to improve the reliability. The constraints are the bus voltage, feeder current and the reactive power flowing back to the source side. The placement and size of DGs are optimized using a combination of Discrete Particle Swarm Optimization (DPSO) and Genetic Algorithm (GA). This increases the diversity of the optimizing variables in DPSO not to be stuck in the local minima. To evaluate the proposed algorithm, the semi-urban 37-bus distribution system connected at bus 2 of the Roy Billinton Test System (RBTS), which is located at the secondary side of a 33/11 kV distribution substation, is used. The results finally illustrate the efficiency of the proposed method.
Resumo:
In this paper, the optimal allocation and sizing of distributed generators (DGs) in a distribution system is studied. To achieve this goal, an optimization problem should be solved in which the main objective is to minimize the DGs cost and to maximise the reliability simultaneously. The active power balance between loads and DGs during the isolation time is used as a constraint. Another point considered in this process is the load shedding. It means that if the summation of DGs active power in a zone, isolated by the sectionalizers because of a fault, is less than the total active power of loads located in that zone, the program start shedding the loads in one-by-one using the priority rule still the active power balance is satisfied. This assumption decreases the reliability index, SAIDI, compared with the case loads in a zone are shed when total DGs power is less than the total load power. To validate the proposed method, a 17-bus distribution system is employed and the results are analysed.
Resumo:
An iterative based strategy is proposed for finding the optimal rating and location of fixed and switched capacitors in distribution networks. The substation Load Tap Changer tap is also set during this procedure. A Modified Discrete Particle Swarm Optimization is employed in the proposed strategy. The objective function is composed of the distribution line loss cost and the capacitors investment cost. The line loss is calculated using estimation of the load duration curve to multiple levels. The constraints are the bus voltage and the feeder current which should be maintained within their standard range. For validation of the proposed method, two case studies are tested. The first case study is the semi-urban 37-bus distribution system which is connected at bus 2 of the Roy Billinton Test System which is located in the secondary side of a 33/11 kV distribution substation. The second case is a 33 kV distribution network based on the modification of the 18-bus IEEE distribution system. The results are compared with prior publications to illustrate the accuracy of the proposed strategy.
Resumo:
Shri Shakti LPG Ltd. (SSLPG) imports and markets propane (referred to as liquefied petroleum gas (LPG) in India) in south India. It sells LPG in packed (cylinder) form to domestic customers and commercial establishments through a network of dealers. Dealers replenish their stocks of filled cylinders from bottling plants, which in turn receive LPG in bulk from the cheaper of SSLPG's two import-and-storage facilities that are located on the Indian coast. We implemented integer programming to help SSLPG decide on the locations and long-run sizes of its bottling plants. We estimate that our recommended configuration of bottling plants is about $1 million cheaper annually than the one that SSLPG had initially planned.
Resumo:
Increased boating activities and new waterfront developments have contributed an estimated 3,000 dismantled, abandoned, junked, wrecked, derelict vessels to Florida coastal waters. This report outlines a method of siting and prioritizing derelict vessel removal using the Florida Keys as a test area. The data base was information on 240 vessels, obtained from Florida Marine Patrol files. Vessel location was plotted on 1:250,000 regional and 1:5,000 and 1:12,000 site maps. Type of vessel, length, hull material, engine, fuel tanks, overall condition, afloat and submerged characteristics, and accessibility, were used to derive parametric site indices of removal priority and removal difficulty. Results indicate 59 top priority cases which should be the focus of immediate clean up efforts in the Florida Keys. Half of these cases are rated low to moderate in removal difficulty; the remainder are difficult to remove. Removal difficulty is a surrogate for removal cost: low difficulty -low cost, high difficulty - high cost. The rating scheme offers coastal planners options of focusing removal operations either on (1) specific areas with clusters of high priority derelict vessels or on (2) selected targeted derelicts at various, specific locations. (PDF has 59 pages.)
Resumo:
This paper proposes a computationally efficient methodology for the optimal location and sizing of static and switched shunt capacitors in large distribution systems. The problem is formulated as the maximization of the savings produced by the reduction in energy losses and the avoided costs due to investment deferral in the expansion of the network. The proposed method selects the nodes to be compensated, as well as the optimal capacitor ratings and their operational characteristics, i.e. fixed or switched. After an appropriate linearization, the optimization problem was formulated as a large-scale mixed-integer linear problem, suitable for being solved by means of a widespread commercial package. Results of the proposed optimizing method are compared with another recent methodology reported in the literature using two test cases: a 15-bus and a 33-bus distribution network. For the both cases tested, the proposed methodology delivers better solutions indicated by higher loss savings, which are achieved with lower amounts of capacitive compensation. The proposed method has also been applied for compensating to an actual large distribution network served by AES-Venezuela in the metropolitan area of Caracas. A convergence time of about 4 seconds after 22298 iterations demonstrates the ability of the proposed methodology for efficiently handling large-scale compensation problems.
Resumo:
This paper presents a methodology for the placement and sizing evaluation of distributed generation (DG) in electric power systems. The candidate locations for DG placement are identified on the bases of Locational Marginal Prices (LMP's) obtained from an optimal power flow solution. The problem is formulated for two different objectives: social welfare maximization and profit maximization. For each DG unit an optimal placement is identified for each of the objectives.
Resumo:
"BNL 50679."