833 resultados para Shared management project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report presents the findings of an evaluation of how the 12 pathfinder local authorities in the LGA/DH sponsored Shared Priority Project began engaging with new requirements to promote healthier communities and narrow health inequalities. The purpose of the report is to capture the learning from the pathfinder authorities' experience of this initial planning phase and share it more widely now that all local authorities have to focus on the shared priorities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report produced by Iowa Departmment of Agriculture and Land Stewardship

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

0-472-842.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been a strong move towards entrepreneurial education in high schools and at universities over the past few years. This has been echoed by a call from state governments around Australia to promote enterprise thinking and education in high schools. It also parallels the push within engineering to learn across the traditional boundaries , particularly between engineering and business. To meet this call, The Engineering Link Group (TELG) developed the Future Engineers Australia Management Project (FEAMP) in 2003. The project is based around Enterprise Education, and was inspired by the Smallpeice Year 12 Engineering Management course in the UK. The idea was to take high school students in years 11 and 12 and turn them into ‘engineering entrepreneurs’. This paper presents the design, development and evaluation of FEAMP as a five day residential course for year 11 and 12 students who want to learn more about being entrepreneurs and managers. It is a hands-on activity where the students invent, develop and sell an engineering concept to venture capitalists and ultimately to customers at a trade fair. It has been run successfully for two years, going from strength to strength. © 2005, Australasian Association for Engineering Education

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Shared management between businesses, governments and society in the historic town of São Paulo city began concurrently with the growth of nonprofit organizations (NGOs) in the 1990s. The program Ações Locais, coordinated by the NGO Associação Viva o Centro is housed in this context and its mission is to bring together individuals, businesses and local governments for economic, social and political development as to build up the citizenship in that area. This study provides a historical background on formation of Brazilian citizenship and, from that reference, analyzes the performing citizenship in the program Ações Locais. The main conclusion of the analysis identified that the program have been consolidated, despite the enormous quotidian difficulties, especially in the social inclusion actions for the poor. The dilemma about how bring in the excluded segments of the population may indicate a new field of research and future studies.