896 resultados para Rod Pump
Resumo:
SOARES, Lennedy C. ; MEDEIROS, Adelardo A. D. de ; PROTASIO, Alan D. D. ; BOLONHINI, Edson H. Sistema supervisório para o método de elevação plunger lift. In: CONGRESSO BRASILEIRO DE PESQUISA E DESENVOLVIMENTO EM PETRÓLEO E GÁS, 5., Fortaleza, CE, 2009. Anais...Fortaleza: CBPDPetro, 2009.
Resumo:
The artificial lifting of oil is needed when the pressure of the reservoir is not high enough so that the fluid contained in it can reach the surface spontaneously. Thus the increase in energy supplies artificial or additional fluid integral to the well to come to the surface. The rod pump is the artificial lift method most used in the world and the dynamometer card (surface and down-hole) is the best tool for the analysis of a well equipped with such method. A computational method using Artificial Neural Networks MLP was and developed using pre-established patterns, based on its geometry, the downhole card are used for training the network and then the network provides the knowledge for classification of new cards, allows the fails diagnose in the system and operation conditions of the lifting system. These routines could be integrated to a supervisory system that collects the cards to be analyzed
Resumo:
The several existing methods for oil artificial lifting and the variety of automation equipment for these methods many times lead the supervisory systems to be dedicated to a unique method and/or to a unique manufacturer. To avoid this problem, it has been developed the supervisory system named SISAL, conceived to supervise wells with different lifting methods and different automation equipments. The SISAL system is working in several Brazilian states but, nowadays, it is only supervising rod pump-based wells. The objective of this work is the development of a supervision module to the plunger lift artificial lift method. The module will have the same characteristics of working with automation hardware of many manufacturers. The module will be integrated to the SISAL system, incorporating the capacity to supervise the plunger lift artificial lift method.
Resumo:
SOARES, Lennedy C. ; MEDEIROS, Adelardo A. D. de ; PROTASIO, Alan D. D. ; BOLONHINI, Edson H. Sistema supervisório para o método de elevação plunger lift. In: CONGRESSO BRASILEIRO DE PESQUISA E DESENVOLVIMENTO EM PETRÓLEO E GÁS, 5., Fortaleza, CE, 2009. Anais...Fortaleza: CBPDPetro, 2009.
Resumo:
SOARES, Lennedy C. ; MEDEIROS, Adelardo A. D. de ; PROTASIO, Alan D. D. ; BOLONHINI, Edson H. Sistema supervisório para o método de elevação plunger lift. In: CONGRESSO BRASILEIRO DE PESQUISA E DESENVOLVIMENTO EM PETRÓLEO E GÁS, 5., Fortaleza, CE, 2009. Anais...Fortaleza: CBPDPetro, 2009.
Resumo:
The artificial lifting of oil is needed when the pressure of the reservoir is not high enough so that the fluid contained in it can reach the surface spontaneously. Thus the increase in energy supplies artificial or additional fluid integral to the well to come to the surface. The rod pump is the artificial lift method most used in the world and the dynamometer card (surface and down-hole) is the best tool for the analysis of a well equipped with such method. A computational method using Artificial Neural Networks MLP was and developed using pre-established patterns, based on its geometry, the downhole card are used for training the network and then the network provides the knowledge for classification of new cards, allows the fails diagnose in the system and operation conditions of the lifting system. These routines could be integrated to a supervisory system that collects the cards to be analyzed
Resumo:
The several existing methods for oil artificial lifting and the variety of automation equipment for these methods many times lead the supervisory systems to be dedicated to a unique method and/or to a unique manufacturer. To avoid this problem, it has been developed the supervisory system named SISAL, conceived to supervise wells with different lifting methods and different automation equipments. The SISAL system is working in several Brazilian states but, nowadays, it is only supervising rod pump-based wells. The objective of this work is the development of a supervision module to the plunger lift artificial lift method. The module will have the same characteristics of working with automation hardware of many manufacturers. The module will be integrated to the SISAL system, incorporating the capacity to supervise the plunger lift artificial lift method.
Resumo:
Experiments were undertaken to study drying kinetics of moist cylindrical shaped food particulates during fluidised bed drying. Cylindrical particles were prepared from Green beans with three different length:diameter ratios, 3:1, 2:1 and 1:1. A batch fluidised bed dryer connected to a heat pump system was used for the experimentation. A Heat pump and fluid bed combination was used to increase overall energy efficiency and achieve higher drying rates. Drying kinetics, were evaluated with non-dimensional moisture at three different drying temperatures of 30, 40 and 50o C. Numerous mathematical models can be used to calculate drying kinetics ranging from analytical models with simplified assumptions to empirical models built by regression using experimental data. Empirical models are commonly used for various food materials due to their simpler approach. However problems in accuracy, limits the applications of empirical models. Some limitations of empirical models could be reduced by using semi-empirical models based on heat and mass transfer of the drying operation. One such method is the quasi-stationary approach. In this study, a modified quasi-stationary approach was used to model drying kinetics of the cylindrical food particles at three drying temperatures.
Resumo:
The shortage of donor hearts for patients with end stage heart failure has accelerated the development of ventricular assist devices (VAD) that act as a replacement heart. Mechanical devices involving pulsatile, axial and centrifugal devices have been proposed. Recent clinical developments indicate that centrifugal devices are not only beneficial for bridge to transplantation applications, but may also aid myocardial recovery. The results of a recent study have shown that patients who received a VAD have extended lives and improved quality of life compared to recipients of drug therapy. Unfortunately 25% of these patients develop right heart failure syndrome, sepsis and multi-organ failure. It was reported that 17% of patients initially receiving an LVAD later required a right ventricular assist device (RVAD). Hence, current research focus is in the development of a bi-ventricular assist device (BVAD). Current BVAD technology is either too bulky or necessitates having to implant two pumps working independently. The latter requires two different controllers for each pump leading to the potential complication of uneven flow dynamics and the requirements for a large amount of body space. This paper illustrates the combination of the LVAD and RVAD as one complete device to augment the function of both the left and right cardiac chambers with double impellers. The proposed device has two impellers rotating in counter directions, hence eliminating the necessity of the body muscles and tubing/heart connection to restrain the pump. The device will also have two separate chambers with independent rotating impeller for the left and right chambers. A problem with centrifugal impellers is the fluid stagnation underneath the impeller. This leads to thrombosis and blood clots.This paper presents the design, construction and location of washout hole to prevent thrombus for a Bi-VAD centrifugal pump. Results using CFD will be used to illustrate the superiority of our design concept in terms of preventing thrombus formation and hemolysis.