980 resultados para Road construction
Resumo:
This paper presents the historical and contextual background of road construction by state and local government in Queensland. It also highlights some key events that have shaped stakeholder participation in road infrastructure planning and delivery in Queensland. This synthesis was developed from a review of publications, organisational documents and interviews. To set the scene, the factors that shaped road delivery will be discussed.
Resumo:
This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
Conceptually, the management of safety at roadworks can be seen in a three level framework. At the regulatory level, roadworks operate at the interface between the work environment, governed by workplace health and safety regulations, and the road environment, which is subject to road traffic regulations and practices. At the organizational level, national, state and local governments plan and purchase road construction and maintenance which are then delivered in-house or tendered out to large construction companies who often subcontract multiple smaller companies to supply services and labor. At the operational level, roadworks are difficult to isolate from the general public, hindering effective occupational health and safety controls. This study, from the State of Queensland, Australia, examines how well this tripartite framework functions. It includes reviews of organizational policy and procedures documents; interviews with 24 subject matter experts from various road construction and maintenance organizations, and on-site interviews with 66 road construction personnel. The study identified several factors influencing the translation of safety policies into practice including the cost of safety measures in the context of competitive tendering, lack of firm evidence of the effectiveness of safety measures, and pressures to minimize disruption to the travelling public.
Resumo:
In the coming decades the design, construction and maintenance of roads will face a range of new issues and as such will require a number of new approaches. In particular, road authorities will be required to consider and respond to a range of issues related to climate change, and associated extreme weather events, such as the extensive flooding in January 2011 in Queensland, Australia Figure 1). Coupled with diminishing access to road construction supplies (such as aggregate), water scarcity, and the potential for increases in oil and electricity prices, this range of challenges bear little resemblance to those previously faced. In Australia, state and federal authorities face further pressures given the variety of needs resulting from the country's geographical and population diversity, expansive road networks, road freight requirements and relatively small population base.
Resumo:
The practice of road construction and maintenance is inherently lean and efficient; a result of the economic benefits that are gained by minimizing wasted resources. In this age of conservation and environmental management, the inbuilt sustainability of existing road construction practices is being developed and extended to produce variety of environmentally sustainable options. A new concept of a “sustainable road” has emerged through both academia and industry, and is defined to be a road that is: - constructed to reduce environmental impacts; - designed to optimise the alignment (vertical and horizontal including considerations of ecological constraints and operational use by vehicles); - resilient to future environmental and economic pressures (e.g. climate change and resource scarcity); - adaptable to changing uses including increased travel volumes, greater demand for public and active (cycling and walking) transport, and; - able to harvest the energy to power itself.
Resumo:
L’obiettivo del progetto è stato quello di realizzare ed analizzare aggregati artificiali creati attraverso geopolimerizzazione e macro-incapsulazione di paraffina in aggregati leggeri espansi, discutendo i loro possibili impieghi nelle pavimentazioni stradali. Dopo un'accurata calibrazione delle miscele geopolimeriche, sono stati realizzati degli aggregati artificiali, in seguito caratterizzati in accordo con la norma UNI EN 10343, con l'intento di sostituire materiali stradali vergini. Contemporaneamente, sono stati prodotti aggregati leggeri impregnati di paraffina (PCM), in grado di cambiare fase una volta raggiunti all'incirca i 3 °C, e successivamente rivestiti da due strati di resina poliestere e polvere di granito, denominati PLA: sfruttandone le proprietà termiche, si è valutato il loro possibile utilizzo come soluzione anti-icing. L’ultima fase della ricerca è stata incentrata nella realizzazione di aggregati geopolimerici espansi e molto porosi che potessero contenere una elevata quantità di PCM, sostituendo l'argilla espansa utilizzata nella produzione degli PLA.
Resumo:
A project to show whether a Warranty or Non-Warranty option would end up cheaper in twenty years.
Resumo:
Mode of access: Internet.
Resumo:
"Report no. 1610 GOI 18/71."
Resumo:
Cover title.
Resumo:
"March 1999."
Resumo:
Several roads in Iceland with bio-oil modified surface dressings exhibited severe distresses such as bleeding, binder drain down, and eventually as surface dressing sticking to tires. Samples from six road sections were evaluated in the laboratory to determine the causes of the failure. Binders with and without bio-oil, rapeseed oil and fish oil, were evaluated through a comprehensive rheological and chemical characterization. Both oils, exhibited solubility issues with the bitumen; consequently, the oils covered the aggregates, preventing bonding between binder and stones. It appears that fish oil worked a little better than rapeseed oil for binder modification.