848 resultados para Risk management tools


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Irrigators face the risk of not having enough water to meet their crops’ demand. There are different mechanisms to cope with this risk, including water markets (option contracts) or insurance. A farmer will purchase them when the expected utility change derived from the tool is positive. This paper presents a theoretical assessment of the farmer’s expected utility under two different option contracts, a drought insurance and a combination of an option contract and the insurance. We analyze the conditions that determine farmer’s reference for one instrument or the other and perform a numerical application that is relevant for a Spanish region.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the present paper, risk-management problems where farmers manage risk both through production decisions and through the use of market-based and informal risk-management mechanisms are considered. It is shown that many of these problems share a common structure, and that a unified and informative treatment of a broad spectrum of risk-management tools is possible within a cost-minimisation framework, under minimal conditions on their objective functions. Fundamental results are derived that apply regardless of the producer's preference towards risks, using only the no-arbitrage condition that agricultural producers never forego any opportunity to lower costs without lowering returns.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Jakarta, Indonesia’s chronic housing shortage poses multiple challenges for contemporary policy-makers. While it may be in the city’s interest to increase the availability of housing, there is limited land to do so. Market pressures, in tandem with government’s desire for housing availability, demand consideration of even marginal lands, such as those within floodplains, for development. Increasingly, planning for a flood resilient Jakarta is complicated by a number of factors, including: the city is highly urbanized and land use data is limited; flood management is technically complex, creating potential barriers to engagement for both decision-makers and the public; inherent uncertainty exists throughout modelling efforts, central to management; and risk and liability for infrastructure investments is unclear. These obstacles require localized watershed-level participatory planning to address risks of flooding where possible and reduce the likelihood that informal settlements occur in areas of extreme risk. This paper presents a preliminary scoping study for determination of an effective participatory planning method to encourage more resilient development. First, the scoping study provides background relevant to the challenges faced in planning for contemporary Jakarta. Second, the study examines the current use of decision-support tools, such as Geographic Information Systems (GIS), in planning for Jakarta. Existing capacity in the use of GIS allows for consideration of the use of an emerging method of community consultation - Multi-Criteria Decision-Making (MCDM) support systems infused with geospatial information - to aid in engagement with the public and improve decision-making outcomes. While these methods have been used in Australia to promote stakeholder engagement in urban intensification, the planned research will be an early introduction of the method to Indonesia. As a consequence of this intervention, it is expected that planning activities will result in a more resilient city, capable of engaging with disaster risk management in a more effective manner.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Appropriate disposition of emergency department (ED) patients with chest pain is dependent on clinical evaluation of risk. A number of chest pain risk stratification tools have been proposed. The aim of this study was to compare the predictive performance for major adverse cardiac events (MACE) using risk assessment tools from the National Heart Foundation of Australia (HFA), the Goldman risk score and the Thrombolysis in Myocardial Infarction risk score (TIMI RS). Methods: This prospective observational study evaluated ED patients aged ≥30 years with non-traumatic chest pain for which no definitive non-ischemic cause was found. Data collected included demographic and clinical information, investigation findings and occurrence of MACE by 30 days. The outcome of interest was the comparative predictive performance of the risk tools for MACE at 30 days, as analyzed by receiver operator curves (ROC). Results: Two hundred eighty-one patients were studied; the rate of MACE was 14.1%. Area under the curve (AUC) of the HFA, TIMI RS and Goldman tools for the endpoint of MACE was 0.54, 0.71 and 0.67, respectively, with the difference between the tools in predictive ability for MACE being highly significant [chi2 (3) = 67.21, N = 276, p < 0.0001]. Conclusion: The TIMI RS and Goldman tools performed better than the HFA in this undifferentiated ED chest pain population, but selection of cutoffs balancing sensitivity and specificity was problematic. There is an urgent need for validated risk stratification tools specific for the ED chest pain population.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aim: Decision-making in weed management involves consideration of limited budgets, long time horizons, conflicting priorities, and as a result, trade-offs. Economics provides tools that allow these issues to be addressed and is thus integral to management of the risks posed by weeds. One of the critical issues in weed risk management during the early stages of an invasion concerns feasibility of eradication. We briefly review how economics may be used in weed risk management, concentrating on this management strategy. Location: Australia. Methods: A range of innovative studies that investigate aspects of weed risk management are reviewed. We show how these could be applied to newly invading weeds, focussing on methods for investigating eradication feasibility. In particular, eradication feasibility is analysed in terms of cost and duration of an eradication programme, using a simulation model based on field-derived parameter values for chromolaena, Chromolaena odorata. Results: The duration of an eradication programme can be reduced by investing in progressively higher amounts of search effort per hectare, but increasing search area will become relatively more expensive as search effort increases. When variation in survey and control success is taken into account, increasing search effort also reduces uncertainty around the required duration of the eradication programme. Main conclusions: Economics is integral to the management of the risks posed by weeds. Decision analysis, based on economic principles, is now commonly used to tackle key issues that confront weed managers. For eradication feasibility, duration and cost of a weed eradication programme are critical components; the dimensions of both factors can usefully be estimated through simulation. © 2013 John Wiley & Sons Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book provides you with all fundamental concepts, guidelines and tools to ensure core business information is identified, protected and used effectively, written in a language that is clear and easy to understand for non-technical ...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book provides you with all the fundamental concepts, guidelines and tools to ensure core business information is identified, protected and used effectively, and written in a language that is clear and easy to understand for non ...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considerable variability in survival rate after an acute myocardial infarction exists and accurate risk stratification is of significant importance. The American College of Cardiology and the American Heart Association has recommended early risk stratification using several clinical risk scoring instruments to identify high risk patients. The aim of this paper is to identify secondary cardiovascular risk scoring instruments that could be utilized at the time of intervention for acute coronary syndromes and compare their psychometric properties as they were developed. A search using Medline, Cumulative Index to Nursing and Allied Health Literature and the Psychology and Behavioral Sciences Collection data-bases identified studies published between January 1990 and January 2010 used to measure risk after intervention for acute coronary syndrome. Four validated secondary risk prediction scoring instruments were identified for comparison.Secondary risk prediction scoring instruments for the acute coronary syndrome patient population are evidence based, valid and reliable. Use of the instruments by cardiac focused clinicians will aid in the determination of treatment strategies, and estimation of short and long term events and mortality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Individuals continually confront a discrepancy between ever expanding and changing wants and the means that they have at their disposal, time, and income, to satisfy them. One of the consequences is the need to make constrained choices between alternatives that have uncertain outcomes. Risk is a different concept from uncertainty. Individual optimal risk management means reducing, eliminating, or fully bearing risk, after conducting a “cost-benefit” analysis. In practice, however, cognitive biases mean that many decisions are not economically rational, necessitating paternalistic government and judicial interventions. Systemic, or whole financial system collapse risk is, optimally managed using well-designed macroprudential regulatory tools. The source of this type of risk is the inherent dynamics of the financial system over the course of the business cycle, interacting with credit market negative externalities, often as in the case of the GFC, spawned by government regulatory failure

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the UK, urban river basins are particularly vulnerable to flash floods due to short and intense rainfall. This paper presents potential flood resilience approaches for the highly urbanised Wortley Beck river basin, south west of the Leeds city centre. The reach of Wortley Beck is approximately 6km long with contributing catchment area of 30km2 that drain into the River Aire. Lower Wortley has experienced regular flooding over the last few years from a range of sources, including Wortley Beck and surface and ground water, that affects properties both upstream and downstream of Farnley Lake as well as Wortley Ring Road. This has serious implications for society, the environment and economy activity in the City of Leeds. The first stage of the study involves systematically incorporating Wortley Beck’s land scape features on an Arc-GIS platform to identify existing green features in the region. This process also enables the exploration of potential blue green features: green spaces, green roofs, water retention ponds and swales at appropriate locations and connect them with existing green corridors to maximize their productivity. The next stage is involved in developing a detailed 2D urban flood inundation model for the Wortley Beck region using the CityCat model. CityCat is capable to model the effects of permeable/impermeable ground surfaces and buildings/roofs to generate flood depth and velocity maps at 1m caused by design storm events. The final stage of the study is involved in simulation of range of rainfall and flood event scenarios through CityCat model with different blue green features. Installation of other hard engineering individual property protection measures through water butts and flood walls are also incorporated in the CityCat model. This enables an integrated sustainable flood resilience strategy for this region.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Metals price risk management is a key issue related to financial risk in metal markets because of uncertainty of commodity price fluctuation, exchange rate, interest rate changes and huge price risk either to metals’ producers or consumers. Thus, it has been taken into account by all participants in metal markets including metals’ producers, consumers, merchants, banks, investment funds, speculators, traders and so on. Managing price risk provides stable income for both metals’ producers and consumers, so it increases the chance that a firm will invest in attractive projects. The purpose of this research is to evaluate risk management strategies in the copper market. The main tools and strategies of price risk management are hedging and other derivatives such as futures contracts, swaps and options contracts. Hedging is a transaction designed to reduce or eliminate price risk. Derivatives are financial instruments, whose returns are derived from other financial instruments and they are commonly used for managing financial risks. Although derivatives have been around in some form for centuries, their growth has accelerated rapidly during the last 20 years. Nowadays, they are widely used by financial institutions, corporations, professional investors, and individuals. This project is focused on the over-the-counter (OTC) market and its products such as exotic options, particularly Asian options. The first part of the project is a description of basic derivatives and risk management strategies. In addition, this part discusses basic concepts of spot and futures (forward) markets, benefits and costs of risk management and risks and rewards of positions in the derivative markets. The second part considers valuations of commodity derivatives. In this part, the options pricing model DerivaGem is applied to Asian call and put options on London Metal Exchange (LME) copper because it is important to understand how Asian options are valued and to compare theoretical values of the options with their market observed values. Predicting future trends of copper prices is important and would be essential to manage market price risk successfully. Therefore, the third part is a discussion about econometric commodity models. Based on this literature review, the fourth part of the project reports the construction and testing of an econometric model designed to forecast the monthly average price of copper on the LME. More specifically, this part aims at showing how LME copper prices can be explained by means of a simultaneous equation structural model (two-stage least squares regression) connecting supply and demand variables. A simultaneous econometric model for the copper industry is built: {█(Q_t^D=e^((-5.0485))∙P_((t-1))^((-0.1868) )∙〖GDP〗_t^((1.7151) )∙e^((0.0158)∙〖IP〗_t ) @Q_t^S=e^((-3.0785))∙P_((t-1))^((0.5960))∙T_t^((0.1408))∙P_(OIL(t))^((-0.1559))∙〖USDI〗_t^((1.2432))∙〖LIBOR〗_((t-6))^((-0.0561))@Q_t^D=Q_t^S )┤ P_((t-1))^CU=e^((-2.5165))∙〖GDP〗_t^((2.1910))∙e^((0.0202)∙〖IP〗_t )∙T_t^((-0.1799))∙P_(OIL(t))^((0.1991))∙〖USDI〗_t^((-1.5881))∙〖LIBOR〗_((t-6))^((0.0717) Where, Q_t^D and Q_t^Sare world demand for and supply of copper at time t respectively. P(t-1) is the lagged price of copper, which is the focus of the analysis in this part. GDPt is world gross domestic product at time t, which represents aggregate economic activity. In addition, industrial production should be considered here, so the global industrial production growth that is noted as IPt is included in the model. Tt is the time variable, which is a useful proxy for technological change. A proxy variable for the cost of energy in producing copper is the price of oil at time t, which is noted as POIL(t ) . USDIt is the U.S. dollar index variable at time t, which is an important variable for explaining the copper supply and copper prices. At last, LIBOR(t-6) is the 6-month lagged 1-year London Inter bank offering rate of interest. Although, the model can be applicable for different base metals' industries, the omitted exogenous variables such as the price of substitute or a combined variable related to the price of substitutes have not been considered in this study. Based on this econometric model and using a Monte-Carlo simulation analysis, the probabilities that the monthly average copper prices in 2006 and 2007 will be greater than specific strike price of an option are defined. The final part evaluates risk management strategies including options strategies, metal swaps and simple options in relation to the simulation results. The basic options strategies such as bull spreads, bear spreads and butterfly spreads, which are created by using both call and put options in 2006 and 2007 are evaluated. Consequently, each risk management strategy in 2006 and 2007 is analyzed based on the day of data and the price prediction model. As a result, applications stemming from this project include valuing Asian options, developing a copper price prediction model, forecasting and planning, and decision making for price risk management in the copper market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Drought spells can impose severe impacts in most vulnerable farms. It is well known that uninsured exposure exacerbates income inequality in farming systems. However, high administrative costs of traditional insurance hinder small farmers? access to risk management tools. The existence of moral hazard and systemic risk prevents the implementation of traditional insurance programs to address drought risk in rural areas. Innovative technologies like satellite images are being used to derive vegetation index which are highly correlated with drought impacts. The implementation of this technology in agricultural insurance may help to overcome some of the limitations of traditional insurance. However, basis risk has been identified as one of the main problems that hinder the acceptance of index insurance. In this paper we focus on the analyses of basis risk under different contract options in the grazing lands of the Araucanía region. A vegetation index database is used to develop an actuarial insurance model and estimate risk premiums for moderate and severe drought coverage. Risk premium sharply increases with risk coverage. In contrast with previous findings in the literature, our results are not conclusive and show that lowering the coverage level does not necessarily imply a reduction in basis risk. Further analyses of the relation between contract design and basis risk is a promising area of research that may render an important social utility for most vulnerable farming systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are risky. A build-operate-transfer (BOT) project is recognised as one of the most risky project schemes. This scheme has been employed rather frequently in the past few decades, in both developed and developing countries. However, because of its risky nature, there have been failures as well as successes. Risk analysis in an appropriate way is desirable in implementing BOT projects. There are various tools and techniques applicable to risk analysis. The application of these risk analysis tools and techniques (RATTs) to BOT projects depends on an understanding of the contents and contexts of BOT projects, together with a thorough understanding of RATTs. This paper studies key points in their applications through reviews of relevant literatures and discusses the application of RATTs to BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants, i.e. government, lenders and project companies. Discussion is also made with regard to political risks, which are very important in BOT projects. A flow chart has been introduced to select an appropriate tool for risk management in BOT projects. This study contributes to the establishment of a framework for systematic risk management in BOT projects.