915 resultados para Risk Identification


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents an automated image‐based safety assessment method for earthmoving and surface mining activities. The literature review revealed the possible causes of accidents on earthmoving operations, investigated the spatial risk factors of these types of accident, and identified spatial data needs for automated safety assessment based on current safety regulations. Image‐based data collection devices and algorithms for safety assessment were then evaluated. Analysis methods and rules for monitoring safety violations were also discussed. The experimental results showed that the safety assessment method collected spatial data using stereo vision cameras, applied object identification and tracking algorithms, and finally utilized identified and tracked object information for safety decision making.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most of existing motorway traffic safety studies using disaggregate traffic flow data aim at developing models for identifying real-time traffic risks by comparing pre-crash and non-crash conditions. One of serious shortcomings in those studies is that non-crash conditions are arbitrarily selected and hence, not representative, i.e. selected non-crash data might not be the right data comparable with pre-crash data; the non-crash/pre-crash ratio is arbitrarily decided and neglects the abundance of non-crash over pre-crash conditions; etc. Here, we present a methodology for developing a real-time MotorwaY Traffic Risk Identification Model (MyTRIM) using individual vehicle data, meteorological data, and crash data. Non-crash data are clustered into groups called traffic regimes. Thereafter, pre-crash data are classified into regimes to match with relevant non-crash data. Among totally eight traffic regimes obtained, four highly risky regimes were identified; three regime-based Risk Identification Models (RIM) with sufficient pre-crash data were developed. MyTRIM memorizes the latest risk evolution identified by RIM to predict near future risks. Traffic practitioners can decide MyTRIM’s memory size based on the trade-off between detection and false alarm rates. Decreasing the memory size from 5 to 1 precipitates the increase of detection rate from 65.0% to 100.0% and of false alarm rate from 0.21% to 3.68%. Moreover, critical factors in differentiating pre-crash and non-crash conditions are recognized and usable for developing preventive measures. MyTRIM can be used by practitioners in real-time as an independent tool to make online decision or integrated with existing traffic management systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Accompanying microfiches (issued in pocket inside back cover) have title: NIOSH risk identification model.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Risk identification is one of the most challenging stages in the risk management process. Conventional risk management approaches provide little guidance and companies often rely on the knowledge of experts for risk identification. In this paper we demonstrate how risk indicators can be used to predict process delays via a method for configuring so-called Process Risk Indicators(PRIs). The method learns suitable configurations from past process behaviour recorded in event logs. To validate the approach we have implemented it as a plug-in of the ProM process mining framework and have conducted experiments using various data sets from a major insurance company.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Post-earthquake fire (PEF) is considered one of the most high risk and complicated problems affecting buildings in urban areas and can cause even more damage than the earthquake itself. However, most standards and codes ignore the implications of PEF and so buildings are not normally designed with PEF in mind. What is needed is for PEF factors to be routinely scrutinized and codified as part of the design process. A systematic application is presented as a means of mitigating the risk of PEF in urban buildings. This covers both existing buildings, in terms of retrofit solutions, and those yet to be designed, where a PEF factor is proposed. To ensure the mitigation strategy meets the defined criteria, a minimum time is defined – the safety guaranteed time target – where the safety of the inhabitants in a building is guaranteed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

With the smartphone revolution, consumer-focused mobile medical applications (apps) have flooded the market without restriction. We searched the market for commercially available apps on all mobile platforms that could provide automated risk analysis of the most serious skin cancer, melanoma. We tested 5 relevant apps against 15 images of previously excised skin lesions and compared the apps' risk grades to the known histopathologic diagnosis of the lesions. Two of the apps did not identify any of the melanomas. The remaining 3 apps obtained 80% sensitivity for melanoma risk identification; specificities for the 5 apps ranged from 20%-100%. Each app provided its own grading and recommendation scale and included a disclaimer recommending regular dermatologist evaluation regardless of the analysis outcome. The results indicate that autonomous lesion analysis is not yet ready for use as a triage tool. More concerning is the lack of restrictions and regulations for these applications.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Twentieth century public health initiatives have been crucially informed by perceptions and constructions of risk. Notions of risk identification, assessment and mitigation have guided political and institutional actions even before these concepts became an explicit part of the language of public administration and policy making. Past analyses investigating the link between risk perceptions and public health are relatively rare, and where researchers have investigated this nexus, it has typically been assumed that the collective identification of health risks has led to progressive improvements in public health activities.
Risk and the Politics of Public Health addresses this gap by presenting a detailed critical historical analysis of the evolution of risk thinking within medical and health related discourses. Grouped around the four core themes of 'immigration', 'race', 'armed conflict' and 'detention and prevention' this book highlights the innovative capacity of risk related concepts as well as their vulnerability to the dysfunctional effects of dominant social ideologies. Risk and the Politics of Public Health is an essential reference for those who seek to understand the interplay of concepts of risk and public health throughout history as well as those who wish to gain a critical understanding of the social dynamics which have underpinned, and continue to underpin, this complex interaction.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Risk management (RM) comprises of risk identification, risk analysis, response planning, monitoring and action planning tasks that are carried out throughout the life cycle of a project in order to ensure that project objectives are met. Although the methodological aspects of RM are well-defined, the philosophical background is rather vague. In this paper, a learning-based approach is proposed. In order to implement this approach in practice, a tool has been developed to facilitate construction of a lessons learned database that contains risk-related information and risk assessment throughout the life cycle of a project. The tool is tested on a real construction project. The case study findings demonstrate that it can be used for storing as well as updating risk-related information and finally, carrying out a post-project appraisal. The major weaknesses of the tool are identified as, subjectivity of the risk rating process and unwillingness of people to enter information about reasons of failure.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

BACKGROUND: This paper describes the study protocol, the recruitment, and base-line data for evaluating the success of randomisation of the PRO-AGE (PRevention in Older people-Assessment in GEneralists' practices) project. METHODS/DESIGN: A group of general practitioners (GPs) in London (U.K.), Hamburg (Germany) and Solothurn (Switzerland) were trained in risk identification, health promotion, and prevention in older people. Their non-disabled older patients were invited to participate in a randomised controlled study. Participants allocated to the intervention group were offered the Health Risk Appraisal for Older Persons (HRA-O) instrument with a site-specific method for reinforcement (London: physician reminders in electronic medical record; Hamburg: one group session or two preventive home visits; Solothurn: six-monthly preventive home visits over a two-year period). Participants allocated to the control group received usual care. At each site, an additional group of GPs did not receive the training, and their eligible patients were invited to participate in a concurrent comparison group. Primary outcomes are self-reported health behaviour and preventative care use at one-year follow-up. In Solothurn, an additional follow-up was conducted at two years. The number of older persons agreeing to participate (% of eligible persons) in the randomised controlled study was 2503 (66.0%) in London, 2580 (53.6%) in Hamburg, and 2284 (67.5%) in Solothurn. Base-line findings confirm that randomisation of participants was successful, with comparable characteristics between intervention and control groups. The number of persons (% of eligible) enrolled in the concurrent comparison group was 636 (48.8%) in London, 746 (35.7%) in Hamburg, and 1171 (63.0%) in Solothurn. DISCUSSION: PRO-AGE is the first large-scale randomised controlled trial of health risk appraisal for older people in Europe. Its results will inform about the effects of implementing HRA-O with different methods of reinforcement.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Several parties (stakeholders) are involved in a construction project. The conventional Risk Management Process (RMP) manages risks from a single party perspective, which does not give adequate consideration to the needs of others. The objective of multi-party risk management is to assist decision-makers in managing risk systematically and most efficiently in a multi-party environment. Multi-party Risk Management Processes (MRMP) consist of risk identification, structuring, analysis and developing responses from all party perspectives. The MRMP has been applied to a cement plant construction project in Thailand to demonstrate its effectiveness.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper assesses the status of pre-disaster risk management in the case of Turkey. By focusing on the period following the catastrophic August 17, 1999 earthquake, the study benefits from USAID’s Disaster Risk Management Benchmarking Tool (DRMBT). In line with the benchmarking tool, the paper covers key developments in the four components of pre-disaster risk management, namely: risk identification, risk mitigation, risk transfer and disaster preparedness. In the end, it will present three major conclusions: (i) Although post-1999 Turkey has made some important progress in the pre-disaster phase of DRM, particularly with the enactment of obligatory earthquake insurance and tightened standards for building construction, the country is far away from substantial levels of success in DRM. (ii) In recent years, local governments have had been given more authority in the realm of DRM, however, Turkey’s approach to DRM is still predominantly centralized at the expense of successful DRM practices at the local level. (iii) While the devastating 1999 earthquake has resulted in advances in the pre-disaster components of DRM; progress has been mostly in the realm of earthquakes. Turkey’s other major disasters (landslides, floods, wild fires i.e.) also require similar attention by local and central authorities.