130 resultados para Retrofit
Resumo:
Tese de Doutoramento em Engenharia Civil.
Resumo:
In 2011, the National Energy Retrofit Programme will build upon existing energy saving programmes in both the domestic and non-domestic sectors. This consultation focused on key design considerations. IPH agree with the commitment to deliver a National Energy Retrofit Programme as a sustainable means of securing energy savings and reducing energy poverty and the nations carbon footprint. The IPH response highlighted the significant benefit to health and would support the use of Health Impact Assessment
Resumo:
This report is formatted to independently present four individual investigations related to similar web gap fatigue problems. Multiple steel girder bridges commonly exhibit fatigue cracking due to out-of-plane displacement of the web near the diaphragm connections. This fatigue-prone web gap area is typically located in negative moment regions of the girders where the diaphragm stiffener is not attached to the top flange. In the past, the Iowa Department of Transportation has attempted to stop fatigue crack propagation in these steel girder bridges by drilling holes at the crack tips. Other nondestructive retrofits have been tried; in a particular case on a two-girder bridge with floor beams, angles were bolted between the stiffener and top flange. The bolted angle retrofit has failed in the past and may not be a viable solution for diaphragm bridges. The drilled hole retrofit is often only a temporary solution, so a more permanent and effective retrofit is required. A new field retrofit has been developed that involves loosening the bolts in the connection between the diaphragm and the girders. Research on the retrofit has been initiated; however, no long-term studies of the effects of bolt loosening have been performed. The intent of this research is to study the short-term effects of the bolt loosening retrofit on I-beam and channel diaphragm bridges. The research also addressed the development of a continuous remote monitoring system to investigate the bolt loosening retrofit on an X-type diaphragm bridge over a number of months, ensuring that the measured strain and displacement reductions are not affected by time and continuous traffic loading on the bridge. The testing for the first three investigations is based on instrumentation of web gaps in a negative moment region on Iowa Department of Transportation bridges with I-beam, channel, and X-type diaphragms. One bridge of each type was instrumented with strain gages and deflection transducers. Field tests, using loaded trucks of known weight and configuration, were conducted on the bridges with the bolts in the tight condition and after implementing the bolt loosening retrofit to measure the effects of loosening the diaphragm bolts. Long-term data were also collected on the X-diaphragm bridge by a data acquisition system that collected the data continuously under ambient truck loading. The collected data were retrievable by an off-site modem connection to the remote data acquisition system. The data collection features and ruggedness of this system for remote bridge monitoring make it viable as a pilot system for future monitoring projects in Iowa. Results indicate that loosening the diaphragm bolts reduces strain and out-of-plane displacement in the web gap, and that the reduction is not affected over time by traffic or environmental loading on the bridge. Reducing the strain in the web gap allows the bridge to support more cycles of loading before experiencing fatigue, thus increase the service life of the bridge. Two-girder floor beam bridges may also exhibit fatigue cracking in girder webs.
Resumo:
This report (which is part of the EPSRC Retrofit 2050 project) sets out three contrasting long term (2050) visions for retrofit city-regional futures, developed through an in-depth participatory backcasting and foresight process. These contextual scenarios are intended as a tool which can be adapted and used by a wide variety of stakeholders and organisations to stimulate discussion and inform future policy and long-term planning.
Resumo:
Cities are responsible for up to 70% of global carbon emissions and 75% of global energy consumption. By 2050 it is estimated that 70% of the world's population will live in cities. The critical challenge for contemporary urbanism, therefore, is to understand how to develop the knowledge, capacity and capability for public agencies, the private sector and multiple users in city-regions (i.e. the city and its wider hinterland) to re-engineer systemically their built environment and urban infrastructure in response to climate change and resource constraints. To inform transitions to urban sustainability, key stakeholders' perceptions were sought though a participatory backcasting and scenario foresight process in order to illuminate challenging but realistic socio-technical scenarios for the systemic retrofit of core UK city-regions. The challenge of conceptualizing complex urban transitions is explored across multiple socio-technical ‘regimes’ (housing, non-domestic buildings, urban infrastructure), scales (building, neighbourhood, city-region), and domains (energy, water, use of resources) within a participatory process. The development of three archetypal ‘guiding visions’ of retrofit city-regional futures developed through this process are discussed, along with the contribution that such foresight processes might play in ‘opening up’ the governance and strategic navigation of urban sustainability.
Resumo:
Purpose – Progress in retrofitting the UK's commercial properties continues to be slow and fragmented. New research from the UK and USA suggests that radical changes are needed to drive large-scale retrofitting, and that new and innovative models of financing can create new opportunities. The purpose of this paper is to offer insights into the terminology of retrofit and the changes in UK policy and practice that are needed to scale up activity in the sector. Design/methodology/approach – The paper reviews and synthesises key published research into commercial property retrofitting in the UK and USA and also draws on policy and practice from the EU and Australia. Findings – The paper provides a definition of “retrofit”, and compares and contrasts this with “refurbishment” and “renovation” in an international context. The paper summarises key findings from recent research and suggests that there are a number of policy and practice measures which need to be implemented in the UK for commercial retrofitting to succeed at scale. These include improved funding vehicles for retrofit; better transparency in actual energy performance; and consistency in measurement, verification and assessment standards. Practical implications – Policy and practice in the UK needs to change if large-scale commercial property retrofit is to be rolled out successfully. This requires mandatory legislation underpinned by incentives and penalties for non-compliance. Originality/value – This paper synthesises recent research to provide a set of policy and practice recommendations which draw on international experience, and can assist on implementation in the UK.