940 resultados para Railroad track settlement


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is the result of real-scale physical modeling study designed to simulate the load-deformation characteristics of railroad foundation systems that include the railroad ties, the ballast, and the sub-base layers of a railroad embankment. The study presents comparisons of the application of dynamic loads of 100kN on the rails, and the resulting deformations during a 500,000 cycle testing period for three rail support systems; wood, concrete and steel. The results show that the deformation curve has an exponential shape, with the larger portion of the deformation occurring during the first 50,000 load cycles followed by a tendency to stabilize between 100,000 to 500,000 cycles. These results indicate that the critical phase of deformations of a new railroad is within the first 50,000 cycles of loading, and after that, it slowly attenuates as it approaches a stable value. The paper also presents empirically derived formulations for the estimation of the deformations of the rail supports as a result of rail traffic.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper analyses the static and dynamic behavior of the railroad track model in laboratory. Measurements of stresses and strains on a large-scale railroad track apparatus were studied. The model includes: compacted soil, representing the final layers of platform, ballast layer, and ties (steel, wooden, and pre-stressed concrete). The soil and soil ballast interface were instrumented with pneumatic stress gauge. Settlement measurement device were positioned at the same levels as the load cells. Loads were applied by hydraulic actuators, statically and dynamically. After the prescribed number of load cycles, in pre-determined intervals, stresses and strains were measured. Observations indicate that stress and strain distributions, transmitted by wooden or steel ties, behave similarly. A more favorable behavior was observed with pre-stressed concrete mono block ties. Non-linear response was observed after a threshold numbers of cycles were surpassed, showing that the strain modulus increases with the numbers of cycles. © 2009 IOS Press.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increased railroad traffic volumes, speeds, and axle loads have created a need to better measure track quality. Previous research has indicated that the vertical track deflection provides a meaningful indicator of track integrity. The measured deflection can be related to the bending stresses in the rail as well as characterize the mechanical response of the track. This investigation summarizes the simulation, analysis and development of a measurement system at the University of Nebraska (UNL) to measure vertical track deflection in real-time from a car moving at revenue speeds. The UNL system operates continuously over long distances and in revenue service. Using a camera and two line lasers, the system establishes three points of the rail shape beneath the loaded wheels and over a distance of 10 ft. The resulting rail shape can then be related to the actual bending stress in the rail and estimate the track support through beam theory. Finite element simulations are used to characterize the track response as related to the UNL measurement system. The results of field tests using bondable resistance strain gages illustrate the system’s capability of approximating the actual rail bending stresses under load.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The traditional ballast track structures are still being used in high speed railways lines with success, however technical problems or performance features have led to non-ballast track solution in some cases. A considerable maintenance work is needed for ballasted tracks due to the track deterioration. Therefore it is very important to understand the mechanism of track deterioration and to predict the track settlement or track irregularity growth rate in order to reduce track maintenance costs and enable new track structures to be designed. The objective of this work is to develop the most adequate and efficient models for calculation of dynamic traffic load effects on railways track infrastructure, and then evaluate the dynamic effect on the ballast track settlement, using a ballast track settlement prediction model, which consists of the vehicle/track dynamic model previously selected and a track settlement law. The calculations are based on dynamic finite element models with direct time integration, contact between wheel and rail and interaction with railway cars. A initial irregularity profile is used in the prediction model. The track settlement law is considered to be a function of number of loading cycles and the magnitude of the loading, which represents the long-term behavior of ballast settlement. The results obtained include the track irregularity growth and the contact force in the final interaction of numerical simulation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"April 1991."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The U.S. railroad companies spend billions of dollars every year on railroad track maintenance in order to ensure safety and operational efficiency of their railroad networks. Besides maintenance costs, other costs such as train accident costs, train and shipment delay costs and rolling stock maintenance costs are also closely related to track maintenance activities. Optimizing the track maintenance process on the extensive railroad networks is a very complex problem with major cost implications. Currently, the decision making process for track maintenance planning is largely manual and primarily relies on the knowledge and judgment of experts. There is considerable potential to improve the process by using operations research techniques to develop solutions to the optimization problems on track maintenance. In this dissertation study, we propose a range of mathematical models and solution algorithms for three network-level scheduling problems on track maintenance: track inspection scheduling problem (TISP), production team scheduling problem (PTSP) and job-to-project clustering problem (JTPCP). TISP involves a set of inspection teams which travel over the railroad network to identify track defects. It is a large-scale routing and scheduling problem where thousands of tasks are to be scheduled subject to many difficult side constraints such as periodicity constraints and discrete working time constraints. A vehicle routing problem formulation was proposed for TISP, and a customized heuristic algorithm was developed to solve the model. The algorithm iteratively applies a constructive heuristic and a local search algorithm in an incremental scheduling horizon framework. The proposed model and algorithm have been adopted by a Class I railroad in its decision making process. Real-world case studies show the proposed approach outperforms the manual approach in short-term scheduling and can be used to conduct long-term what-if analyses to yield managerial insights. PTSP schedules capital track maintenance projects, which are the largest track maintenance activities and account for the majority of railroad capital spending. A time-space network model was proposed to formulate PTSP. More than ten types of side constraints were considered in the model, including very complex constraints such as mutual exclusion constraints and consecution constraints. A multiple neighborhood search algorithm, including a decomposition and restriction search and a block-interchange search, was developed to solve the model. Various performance enhancement techniques, such as data reduction, augmented cost function and subproblem prioritization, were developed to improve the algorithm. The proposed approach has been adopted by a Class I railroad for two years. Our numerical results show the model solutions are able to satisfy all hard constraints and most soft constraints. Compared with the existing manual procedure, the proposed approach is able to bring significant cost savings and operational efficiency improvement. JTPCP is an intermediate problem between TISP and PTSP. It focuses on clustering thousands of capital track maintenance jobs (based on the defects identified in track inspection) into projects so that the projects can be scheduled in PTSP. A vehicle routing problem based model and a multiple-step heuristic algorithm were developed to solve this problem. Various side constraints such as mutual exclusion constraints and rounding constraints were considered. The proposed approach has been applied in practice and has shown good performance in both solution quality and efficiency.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Notes or an essay from Dorothy Rungeling's time in horsemanship classes in the 1940s. The notes/essay is three pages in length and is focused on the "head and neck" of a horse. She mentions the "schooling" of a horse, much like people. The horse must be taught the way to use his head and neck in the judging ring. She focuses on the horses use of it's neck and head for balance much like we use our arms, for example, "Did you ever try walking the rails on a railroad track or try walking on any narrow board? You would automatically put your arms out if you felt unbalanced. Your arms would be your balancer and the horse's head and neck are his".

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A prestressed concrete monoblock railroad tie was designed to attend the characteristics of a Brazilian railroad track with 1,600 mm gauge and 320 kN axle load. Concrete ties specimens were manufactured without and with steel fibers in a volume fraction of 60 kg/m3 (0.76 % by volume), and three different initial prestress forces. Static and fatigue tests were carried out on the ties. Static tests showed that steel fibers increase the first crack and ultimate bending moments, increase significantly the slip force of the prestressing tendons, reduce crack width, add higher ductility to the ties and decrease the stress in the prestressing tendons. Under dynamic loading the steel fibers decreased the stress in the prestressing tendons by about 50%, which improved significantly the fatigue strength of the tie. A tie without fibers failed after only 150,000 cycles. However, a similar tie, with fibers, resisted 3,000,000 cycles without suffering fatigue failure.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La vía tradicional sobre balasto sigue siendo una selección para las líneas de alta velocidad a pesar de los problemas técnicos y la prestación del funcionamiento. El problema de la vía sobre balasto es el proceso continuo del deterioro de éste debido a las cargas asociadas al tráfico ferroviario. En consecuencia es imprescindible un mantenimiento continuado para mantener un alineamiento adecuado de la vía. Por eso se surge la necesidad de comprender mejor el mecanismo involucrado en el deterioro de la vía y los factores claves que rigen su progresión a lo largo de ciclos de carga con el fin de reducir los costos del mantenimiento de la vía y mejorar el diseño de las nuevas vías. La presente tesis intenta por un lado desarrollar los modelos más adecuados y eficientes del vehículo y de la vía para los cálculos de los efectos dinámicos debido al tráfico de ferrocarril sobre la infraestructura de la vía sobre balasto, y por otro evaluar estos efectos dinámicos sobre el deterioro de la vía sobre balasto a largo plazo, empleando un adecuado modelo de predicción del deterioro de la misma. Se incluye en el trabajo una recopilación del estado del arte en lo referente a la dinámica de la vía, a la modelización del vehículo, de la vía y de la interacción entre ambos. También se hace un repaso al deterioro de la vía y los factores que influyen en su proceso. Para la primera línea de investigación de esta tesis, se han desarrollado los diferentes modelos del vehículo y de la vía y la modelización de la interacción entre ambos para los cálculos dinámicos en dos y tres dimensiones. En la interacción vehículo-vía, se ha empleado la formulación de contacto nodo-superficie para establecer la identificación de las superficies en contacto y el método de los multiplicadores de Lagrange para imponer las restricciones de contacto. El modelo de interacción se ha contrastado con los casos reportados en la literatura. Teniendo en cuenta el contacto no lineal entre rueda-carril y los perfiles de irregularidades distribuidas de la vía, se han evaluado y comparado los efectos dinámicos sobre el sistema vehículo-vía en la interacción de ambos, para distintas velocidades de circulación del vehículo, en los aspectos como la vibración del vehículo, fuerza de contacto, fuerza transmitida en los railpads, la vibración del carril. También se hace un estudio de la influencia de las propiedades de los componentes de la vía en la respuesta dinámica del sistema vehículo-vía. Se ha desarrollado el modelo del asiento de la vía que consiste en la implementación del modelo de acumulación de Bochum y del modelo de hipoplasticidad en la subrutina del usuario \UMAT" del programa ABAQUS. La implementación numérica ha sido comprobado al comparar los resultados de las simulaciones numéricas con los reportados en la literatura. Se ha evaluado la calidad geométrica de la vía sobre balasto de los tramos de estudio con datos reales de la auscultación proporcionados por ADIF (2012). Se ha propuesto una metodología de simulación, empleando el modelo de asiento, para reproducir el deterioro de la geometría de la vía. Se usan los perfiles de la nivelación longitudinal de la auscultación como perfiles de irregularidades iniciales de la vía en las simulaciones numéricas. También se evalúa la influencia de la velocidad de circulación sobre el deterioro de la vía. The traditional ballast track structures are still being used in high speed railways lines with success, however technical problems or performance features have led to ballast track solution in some cases. The considerable maintenance work is needed for ballasted tracks due to the track deterioration. Therefore it is very important to understand the mechanism of track deterioration and to predict the track settlement or track irregularity growth rate in order to reduce track maintenance costs and enable new track structures to be designed. This thesis attempts to develop the most adequate and efficient models for calculation of dynamic track load effects on railways track infrastructure, and to evaluate these dynamic effects on the track settlement, using a track settlement prediction model, which consists of the vehicle/track dynamic model previously selected and a track settlement law. A revision of the state of the knowledge regarding the track dynamics, the modelling of the vehicle, the track and the interaction between them is included. An overview related to the track deterioration and the factors influencing the track settlement is also done. For the first research of this thesis, the different models of vehicle, track and the modelling of the interaction between both have been developed. In the vehicle-track interaction, the node-surface contact formulation to establish the identification of the surfaces in contact and the Lagrange multipliers method to enforce contact constraint are used. The interaction model has been verified by contrast with some benchmarks reported in the literature. Considering the nonlinear contact between wheel-rail and the track irregularities, the dynamic effects on the vehicle-track system have been evaluated and compared, for different speeds of the vehicle, in aspects as vehicle vibration, contact force, force transmitted in railpads, rail vibration. A study of the influence of the properties of the track components on the the dynamic response of the vehicle-track system has been done. The track settlement model is developed that consist of the Bochum accumulation model and the hipoplasticity model in the user subroutine \UMAT" of the program ABAQUS. The numerical implementation has been verified by comparing the numerical results with those reported in the literature. The geometric quality of the ballast track has been evaluated with real data of auscultation provided by ADIF (2012). The simulation methodology has been proposed, using the settlement model for the ballast material, to reproduce the deterioration of the track geometry. The profiles of the longitudinal level of the auscultation is used as initial profiles of the track irregularities in the numerical simulation. The influence of the running speed on the track deterioration is also investigated.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil - Área de Especialização em Vias de Comunicações e Transportes

Relevância:

40.00% 40.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Just as the railroad tracks guide trains toward their destination, Iowa’s railroads play a vital role in keeping our state’s economic health and growth “on track” for the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In April 1991 the Iowa Department of Transportation, the CNW Transportation Company, the SOO Line, and local agencies and business in the Mason City/Clear Lake area initiated an Operation Lifesaver program to attempt to increase public awareness of safety issues and safe behavior at railroad-highway grade crossings. This document reports an initial study of data on traffic characteristics at a selected set of grade crossings in Cerro Gordo County taken before and after the safety program. Twenty-two crossings were studied. The 13 crossings at which collisions were reported for the five years prior to the study were included in the sample of sites. Two field observations were made at each study crossing before the Operation Lifesaver campaign was in full swing, and two observations were made after the conclusion of the main effort of the campaign. The summary of each data set is contained in a companion volume. The research shows that Operation Lifesaver altered drivers' behavior in the following ways: (1) reduced approach speeds and crossing speeds at crossings with low speed limits, (2) reduced the percent of drivers approaching the crossing at speeds in excess of the posted speed limit, and (3) increased alertness of drivers to railroad crossing hazards as evidenced by more drivers looking for a clear track. Thus, Operation Lifesaver enhanced safety in street and highway traffic operations in the vicinity of railroad-highway grade crossings.