969 resultados para Public construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Title Varies: Construction Materials; Construction Materials & Public Construction Summary

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Korea has increasingly adopted design-build for public construction projects in the last few years. There is a much greater awareness of the need to change a system based on ‘Value for Money’ which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process as the bid awarding system is being changed from one based on lowest price, to one based on best value over the life-cycle. Key criteria like whole life cost, service life planning and design quality are important through the key stages of evaluation process. The model uses a systematic and holistic approach which enables a public sector to make better decisions in design-builder selection, which will deliver whole life benefits, based on long term cost-effectiveness and whole life.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Työssä esitetään kriteeristö tehostamaan energiatehokkuuden toteutumista kaupungin julkisissa rakennushankkeissa. Kriteeristön tarkoituksena on edistää julkisen uudisrakennushankkeen energiatehokkuutta, ottaen huomioon hankkeen kokonaistaloudellisuus. Energiatehokkuutta ja kokonaistaloudellisuutta kunnallisessa rakentamisessa stimuloivat mm. kansainvälisten ja kansallisten sopimusten energiansäästötavoitteet, sekä kuntien tiukka budjettitilanne. Jotta kokonaistaloudellisuustavoitteet täyttyisivät, työssä käytettiin hyväksi elinkaariajattelutapaa. Työssä selvitettiin kirjallisuuden ja ammattilaisten haastattelujen tarjoaman tiedon pohjalta, mitkä näkökohdat vaikuttavat julkisen palvelurakennuksen energiatehokkuuteen sen elinkaaren eri vaiheissa. Hankitun tiedon avulla luotiin kaupungin rakennusinvestointien hankinnasta vastaavien tahojen käyttöön tarkoitettu kriteeristö, joka auttaa tunnistamaan ja valitsemaan energiatehokkuuden ja kokonaistaloudellisuuden kannalta parhaimmat hankkeen toteutustavat. Jatkotoimenpiteenä työssä laadittua kriteeristöä tullaan kehittämään edelleen case-kohteista saatavien kokemusten perusteella. Tutkimus osoitti, että uudisrakentamisen energiataloudellisuuden lisäksi on panostettava energiataloudelliseen korjausrakentamiseen, koska olemassa oleva rakennuskanta muodostaa merkittävän osan kaupungin energiankulutuksesta.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O objetivo do presente trabalho é investigar qual procedimento de contratação publica–se o procedimento tradicional regido pela Lei nº 8.666/93, na modalidade concorrência, ou o mais recente Regime Diferenciado de Contratações instituído pela Lei nº 12.462/11 – é mais econômico e célere para a contratação de obras públicas. Para tanto, foi realizada uma análise teórico-comparativa dessas duas modalidades de contratação e um estudo empírico comparativo das licitações dos contratos de restauração e manutenção de rodovia (CREMA) realizadas pelo Departamento Nacional de Infraestrutura de Transporte que foram licitados pelo RDC ou na modalidade concorrência da Lei nº 8.666/93.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In Brazil the theme quality in public construction has been widely discussed in the early 1990s, with the creation of the Brazilian Program of Quality and Productivity for the Habitat (PBQP-H) which is strongly influenced by the wave of studies on issues of quality in the world, such as the ISO 9000. Over the years, other approaches have emerged and been consolidated, evolving from market and customer´s needs. An example is the Six Sigma methodology. This study aims to examine the Six Sigma, ISO 9000 and PBQP-H methodologies, noting the common elements, differences, gaps and how the methods are complementary, so that with the ongoing work, proposed initiatives can be developed to improve the quality that enables its application in public construction. Still aiming to optimize the deployment of the proposed initiatives, it was performed an analysis of ISO 9001 and PBPQ-H certifications in Brazil and in the state of Rio Grande do Norte, with respect to the construction industry and a case study to identify the factors that influence the adoption of initiatives to improve quality, and check if the selected construction company is prepared to implement the proposed initiatives. This research is characterized as exploratory and applied, with literature review and a case study. The data collection instrument was a questionnaire and the statistical analysis used a multidimensional scaling method. The conclusion is that the methodologies are compatible and complementary, and their integration could potentialize the goals set. It was identified that the state of Rio Grande do Norte has a few number of certifications in construction. Nine initiatives are proposed for implementation at construction companies. In the case study it was found that the studied company would be able to implement the suggestions proposed and the requirement for certification by clients and funding institutions influence the adoption of quality improvement initiatives. This result confirms the literature which states that top management support is crucial for the successful implementation of quality methodologies

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dentre os diversos segmentos do Setor da Construção Civil, um dos principais é o de obras por empreitada global, que são aquelas contratadas por preço certo e total. As obras públicas, que têm como finalidade atender a uma utilidade pública e cujos contratos são regidos pela Lei 8.666/93, são geralmente contratadas sob esse regime de execução. O artigo 58 desta Lei determina que deva ser mantido o equilíbrio econômicofinanceiro dos contratos celebrados com o Poder Público. A fundamentação teórica trata dos conceitos de obras públicas, dos principais aspectos da Lei 8.666/93, de análise econômico-financeira e de análise de riscos. Este trabalho apresenta também uma sistemática e uma simulação numérica para formação de preços para obras empreitadas de Construção Civil. O objetivo geral deste trabalho é a criação de parâmetros para o estabelecimento de margens de proteção para a dilatação do prazo e respectivos encaixes de preços, visando, como determina a Lei 8.666/93, a manutenção do equilíbrio original. Com base na análise dos resultados de 63 obras, verifica-se a manutenção do equilíbrio econômico-financeiro, comparando-se a taxa de retorno restrita esperada pelas empresas no momento das licitações com a realmente alcançada na operação. A partir dos desvios detectados nas taxas de retorno nesses dois momentos, cria-se, pelo processo de simulação e análise de sensibilidade, parâmetros para cobertura dos referidos riscos. No momento da licitação, a taxa de retorno restrita média das obras analisadas é de 9,45% ao mês. No segundo momento, essa taxa cai para em média para 5,16% ao mês. Isto representa, em média, uma variação de 45,39%. A taxa média de atratividade das obras públicas analisadas está dentro do intervalo de 6% a 13% ao mês. Como parâmetro de cobertura de riscos quanto aos desvios de prazo e encaixe do preço, tem-se o intervalo de 1,5% a 11,5% do preço. Portanto, entre as obras analisadas, não existe o equilíbrio econômico-financeiro.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este trabalho faz uma reflexão sobre a coordenação de projetos na indústria da construção de edifícios, identifica as etapas do processo de projeto, aponta a participação da equipe de projeto, durante as atividades de coordenação, apresenta a atuação do coordenador de projetos e sistematiza os procedimentos de controle e retroalimentação. Para desenvolver a pesquisa, foram realizados estudos bibliográficos sobre a Gestão e Coordenação de Projetos, no desenvolvimento do processo de projeto na construção civil. Também foram feitos estudos de campo, envolvendo 10 empresas de construção civil na área urbana da cidade de Belém-PA, com atuação nos mercados de incorporação e/ou construção de obras privadas ou públicas, visando propor diretrizes da gestão de projetos, integrada ao processo de desenvolvimento e coordenação dos mesmos. Como resultado, vimos que 100% das empresas pesquisadas afirmou que o planejamento técnico do projeto é dividido por etapas, conforme apresentação de fluxogramas distintos. 77,77% das empresas em questão respondeu que realiza a coordenação de projetos através de reuniões com as equipes responsáveis. Também 100% das empresas aponta como funções do coordenador de projetos a compatibilização entre os projetos e a manutenção do fluxo de informações entre os projetistas. Em 88,88% das empresas, foi possível observar que a retroalimentação do projeto acontece através do controle por meio de check list e planilhas. Por fim, são desenvolvidas e apresentadas diretrizes para aplicação da coordenação de projeto, como forma de melhorar o desempenho do desenvolvimento do processo de projeto e a execução dos edifícios, com a valorização do projeto e conseqüente economia de recursos, tempo e dinheiro, evitando erros, desperdício e trabalho nos empreendimentos.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La movilización de los pobres urbanos en el marco de las organizaciones piqueteras del conurbano bonaerense ha sido materia de un doble enfoque. Una mirada de perfil etnográfico, que profundiza en las tramas asociativas que entretejen organizaciones y vecinos empobrecidos; y una mirada sociológica, que se concentra en las condiciones y las formas de construcción de las organizaciones. Sin embargo, menos atención se ha prestado ala construcción pública e interactiva de los eventos de protesta social que involucran a las organizaciones piqueteras de esta área urbana. Situándonos en este hueco nos proponemos avanzar en una exploración preliminar de algunas dimensiones de esa construcción pública en el caso de la denominada 'Masacre del 26 de Junio en Avellaneda'. Tomando estos eventos como manifestación, es decir : 'intervenciones corporales y discursivas de contenido político (en el sentido amplio del término) en el espacio público recurriendo a los instrumentos de la movilización callejera', nos interesa tanto reconstruir un relato de lo que ocurrió en ese entonces como hacer una descripción y análisis de lo que diversos actores involucrados sostuvieron que 'debía pensarse' de aquello que ocurrió

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La movilización de los pobres urbanos en el marco de las organizaciones piqueteras del conurbano bonaerense ha sido materia de un doble enfoque. Una mirada de perfil etnográfico, que profundiza en las tramas asociativas que entretejen organizaciones y vecinos empobrecidos; y una mirada sociológica, que se concentra en las condiciones y las formas de construcción de las organizaciones. Sin embargo, menos atención se ha prestado ala construcción pública e interactiva de los eventos de protesta social que involucran a las organizaciones piqueteras de esta área urbana. Situándonos en este hueco nos proponemos avanzar en una exploración preliminar de algunas dimensiones de esa construcción pública en el caso de la denominada 'Masacre del 26 de Junio en Avellaneda'. Tomando estos eventos como manifestación, es decir : 'intervenciones corporales y discursivas de contenido político (en el sentido amplio del término) en el espacio público recurriendo a los instrumentos de la movilización callejera', nos interesa tanto reconstruir un relato de lo que ocurrió en ese entonces como hacer una descripción y análisis de lo que diversos actores involucrados sostuvieron que 'debía pensarse' de aquello que ocurrió

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La movilización de los pobres urbanos en el marco de las organizaciones piqueteras del conurbano bonaerense ha sido materia de un doble enfoque. Una mirada de perfil etnográfico, que profundiza en las tramas asociativas que entretejen organizaciones y vecinos empobrecidos; y una mirada sociológica, que se concentra en las condiciones y las formas de construcción de las organizaciones. Sin embargo, menos atención se ha prestado ala construcción pública e interactiva de los eventos de protesta social que involucran a las organizaciones piqueteras de esta área urbana. Situándonos en este hueco nos proponemos avanzar en una exploración preliminar de algunas dimensiones de esa construcción pública en el caso de la denominada 'Masacre del 26 de Junio en Avellaneda'. Tomando estos eventos como manifestación, es decir : 'intervenciones corporales y discursivas de contenido político (en el sentido amplio del término) en el espacio público recurriendo a los instrumentos de la movilización callejera', nos interesa tanto reconstruir un relato de lo que ocurrió en ese entonces como hacer una descripción y análisis de lo que diversos actores involucrados sostuvieron que 'debía pensarse' de aquello que ocurrió

Relevância:

60.00% 60.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.