928 resultados para Proposals
Resumo:
This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.
Resumo:
Hong Kong is a modern global city with a reputation for well-regulated financial markets, but for years, the government had been trying to enact laws on corporate rescue procedures with relatively little success. It is under the pretext of the Global Financial Crisis, the threat of a future economic meltdown gave the Hong Kong government the impetus to revisit this issue. This third attempt to codify statutory obligations on directors’ liability for insolvent trading has been criticised for either setting the standards too high or low for directors trading whilst insolvent. There is also some reservation given the beliefs and values of directors in Chinese family-owned and controlled companies. These companies would most likely trade out the difficult times. Nevertheless, this does not negate from the fact that the enactment of corporate rescue procedures in Hong Kong in 2010 is a momentous achievement for the Hong Kong government.
Resumo:
Much of the research on the delivery of advice by professionals such as physicians, health workers and counsellors, both on the telephone and in face to face interaction more generally, has focused on the theme of client resistance and the consequent need for professionals to adopt particular formats to assist in the uptake of the advice. In this paper we consider one setting, Kid’s Helpline, the national Australian counselling service for children and young people, where there is an institutional mandate not to give explicit advice in accordance with the values of self-direction and empowerment. The paper examines one practice, the use of script proposals by counsellors, which appears to offer a way of providing support which is consistent with these values. Script proposals entail the counsellors packaging their advice as something that the caller might say – at some future time – to a third party such as a friend, teacher, parent, or partner, and involve the counsellor adopting the speaking position of the caller in what appears as a rehearsal of a forthcoming strip of interaction. Although the core feature of a script proposal is the counsellor’s use of direct reported speech they appear to be delivered, not so much as exact words to be followed, but as the type of conversation that the client needs to have with the 3rd party. Script proposals, in short, provide models of what to say as well as alluding to how these could be emulated by the client. In their design script proposals invariably incorporate one or more of the most common rhetorical formats for maximising the persuasive force of an utterance such as a three part list or a contrastive pair. Script proposals, moreover, stand in a complex relation to the prior talk and one of their functions appears to be to summarise, respecify or expand upon the client’s own ideas or suggestions for problem solving that have emerged in these preceding sequences.
Resumo:
Objectives: To quantify randomness and cost when choosing health and medical research projects for funding. Design: Analysis of retrospective data from grant review panels. Setting: The National Health & Medical Research Council of Australia. Participants/Data: All panel members’ scores for grant proposals submitted in 2009. Main outcome measure: The proportion of grant proposals that were always, sometimes and never funded after accounting for random variability arising from variation in panel members’ scores; the cost-effectiveness of different size assessment panels. Results: 59% of 620 funded grants were sometimes not funded when random variability was accounted for. Only 9% of grant proposals were always funded, 61% were never funded and 29% were sometimes funded. The extra cost per grant effectively funded from the most effective system was $18,541. Conclusions: Allocating funding for scientific research in health and medicine is costly and somewhat random. There are many useful research questions to be addressed that could improve current processes.
Resumo:
The availability and use of online counseling approaches has increased rapidly over the last decade. While research has suggested a range of potential affordances and limitations of online counseling modalities, very few studies have offered detailed examinations of how counselors and clients manage asynchronous email counseling exchanges. In this paper we examine email exchanges involving clients and counselors through Kids Helpline, a national Australian counseling service that offers free online, email and telephone counseling for young people up to the age of 25. We employ tools from the traditions of ethnomethodology and conversation analysis to analyze the ways in which counselors from Kids Helpline request that their clients call them, and hence change the modality of their counseling relationship, from email to telephone counseling. This paper shows the counselors’ three multi-layered approaches in these emails as they negotiate the potentially delicate task of requesting and persuading a client to change the trajectory of their counseling relationship from text to talk without placing that relationship in jeopardy.
Resumo:
Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.
Resumo:
The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.
Resumo:
The draft report of the Industry Commission's charitable organisations inquiry introduces a new term for nonprofit organisations delivering human services. The new term is "community social welfare organisation" or "CSWO". The report recommends that tax deductibility of donations be extended such organisations. It then hints at making the definition of CSWO a standard criteria for state taxation exemptions. This paper examines the definition of the new term community social welfare organisation and charts its possible consequences if adopted by the federal government. The promise of tax deductibility status to previously shunned organisations is largely illusory. The Commission's aim of simplification through clarification of the definition is flawed and will not reduce the administration costs for the Australian Tax Office (ATO) or organisations.
Resumo:
Chapter 10 explains the functions and types of report and proposal documents commonly used in business and professional contexts.
Resumo:
Chapter 12 explains the structure and style of formal report and proposal documents.
Resumo:
Objective: To estimate the time spent by the researchers for preparing grant proposals, and to examine whether spending more time increase the chances of success. Design: Observational study. Setting: The National Health and Medical Research Council (NHMRC) of Australia. Participants: Researchers who submitted one or more NHMRC Project Grant proposals in March 2012. Main outcome measures: Total researcher time spent preparing proposals; funding success as predicted by the time spent. Results: The NHMRC received 3727 proposals of which 3570 were reviewed and 731 (21%) were funded. Among our 285 participants who submitted 632 proposals, 21% were successful. Preparing a new proposal took an average of 38 working days of researcher time and a resubmitted proposal took 28 working days, an overall average of 34 days per proposal. An estimated 550 working years of researchers' time (95% CI 513 to 589) was spent preparing the 3727 proposals, which translates into annual salary costs of AU$66 million. More time spent preparing a proposal did not increase the chances of success for the lead researcher (prevalence ratio (PR) of success for 10 day increase=0.91, 95% credible interval 0.78 to 1.04) or other researchers (PR=0.89, 95% CI 0.67 to 1.17). Conclusions: Considerable time is spent preparing NHMRC Project Grant proposals. As success rates are historically 20–25%, much of this time has no immediate benefit to either the researcher or society, and there are large opportunity costs in lost research output. The application process could be shortened so that only information relevant for peer review, not administration, is collected. This would have little impact on the quality of peer review and the time saved could be reinvested into research.
Resumo:
Business Process Management has substantially matured over the last two decades. The techniques, methods and systems available to scope, model, analyze, implement, execute, monitor and even mine a process have been scientifically researched and can be in most cases deployed in practice. In fact, many of these BPM capabilities are nowadays a commodity. However, an opportunity-rich environment and rapidly emerging digital disruptions require new BPM capabilities. In light of this context, this paper proposes three future research and development directions for BPM academics and professionals. First, Ambidextrous BPM demands the shift of focus from exploitative to explorative BPM. Second, Value-driven BPM postulates a stronger focus on the desired outcomes as opposed to the available BPM methods. Third, Customer Process Management suggests complementing the dominating internal view of BPM with a stronger, design-inspired view on the process experiences of external stakeholders.
Resumo:
Background Despite the widely recognised importance of sustainable health care systems, health services research remains generally underfunded in Australia. The Australian Centre for Health Services Innovation (AusHSI) is funding health services research in the state of Queensland. AusHSI has developed a streamlined protocol for applying and awarding funding using a short proposal and accelerated peer review. Method An observational study of proposals for four health services research funding rounds from May 2012 to November 2013. A short proposal of less than 1,200 words was submitted using a secure web-based portal. The primary outcome measures are: time spent preparing proposals; a simplified scoring of grant proposals (reject, revise or accept for interview) by a scientific review committee; and progressing from submission to funding outcomes within eight weeks. Proposals outside of health services research were deemed ineligible. Results There were 228 eligible proposals across 4 funding rounds: from 29% to 79% were shortlisted and 9% to 32% were accepted for interview. Success rates increased from 6% (in 2012) to 16% (in 2013) of eligible proposals. Applicants were notified of the outcomes within two weeks from the interview; which was a maximum of eight weeks after the submission deadline. Applicants spent 7 days on average preparing their proposal. Applicants with a ranking of reject or revise received written feedback and suggested improvements for their proposals, and resubmissions composed one third of the 2013 rounds. Conclusions The AusHSI funding scheme is a streamlined application process that has simplified the process of allocating health services research funding for both applicants and peer reviewers. The AusHSI process has minimised the time from submission to notification of funding outcomes.
Resumo:
Integrating renewable energy into public space is becoming more common as a climate change solution. However, this approach is often guided by the environmental pillar of sustainability, with less focus on the economic and social pillars. The purpose of this paper is to examine this issue in the speculative renewable energy propositions for Freshkills Park in New York City submitted for the 2012 Land Art Generator Initiative (LAGI) competition. This paper first proposes an optimal electricity distribution (OED) framework in and around public spaces based on relevant ecology and energy theory (Odum’s fourth and fifth law of thermodynamics). This framework addresses social engagement related to public interaction, and economic engagement related to the estimated quantity of electricity produced, in conjunction with environmental engagement related to the embodied energy required to construct the renewable energy infrastructure. Next, the study uses the OED framework to analyse the top twenty-five projects submitted for the LAGI 2012 competition. The findings reveal an electricity distribution imbalance and suggest a lack of in-depth understanding about sustainable electricity distribution within public space design. The paper concludes with suggestions for future research.