978 resultados para Project objectives


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The quality of environmental decisions should be gauged according to managers' objectives. Management objectives generally seek to maximize quantifiable measures of system benefit, for instance population growth rate. Reaching these goals often requires a certain degree of learning about the system. Learning can occur by using management action in combination with a monitoring system. Furthermore, actions can be chosen strategically to obtain specific kinds of information. Formal decision making tools can choose actions to favor such learning in two ways: implicitly via the optimization algorithm that is used when there is a management objective (for instance, when using adaptive management), or explicitly by quantifying knowledge and using it as the fundamental project objective, an approach new to conservation.This paper outlines three conservation project objectives - a pure management objective, a pure learning objective, and an objective that is a weighted mixture of these two. We use eight optimization algorithms to choose actions that meet project objectives and illustrate them in a simulated conservation project. The algorithms provide a taxonomy of decision making tools in conservation management when there is uncertainty surrounding competing models of system function. The algorithms build upon each other such that their differences are highlighted and practitioners may see where their decision making tools can be improved. © 2010 Elsevier Ltd.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Water service providers (WSPs) in the UK have statutory obligations to supply drinking water to all customers that complies with increasingly stringent water quality regulations and minimum flow and pressure criteria. At the same time, the industry is required by regulators and investors to demonstrate increasing operational efficiency and to meet a wide range of performance criteria that are expected to improve year-on-year. Most WSPs have an ideal for improving the operation of their water supply systems based on increased knowledge and understanding of their assets and a shift to proactive management followed by steadily increasing degrees of system monitoring, automation and optimisation. The fundamental mission is, however, to ensure security of supply, with no interruptions and water quality of the highest standard at the tap. Unfortunately, advanced technologies required to fully understand, manage and automate water supply system operation either do not yet exist, are only partially evolved, or have not yet been reliably proven for live water distribution systems. It is this deficiency that the project NEPTUNE seeks to address by carrying out research into 3 main areas; these are: data and knowledge management; pressure management (including energy management); and the associated complex decision support systems on which to base interventions. The 3-year project started in April of 2007 and has already resulted in a number of research findings under the three main research priority areas (RPA). The paper summarises in greater detail the overall project objectives, the RPA activities and the areas of research innovation that are being undertaken in this major, UK collaborative study. Copyright 2009 ASCE.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Risk management (RM) comprises of risk identification, risk analysis, response planning, monitoring and action planning tasks that are carried out throughout the life cycle of a project in order to ensure that project objectives are met. Although the methodological aspects of RM are well-defined, the philosophical background is rather vague. In this paper, a learning-based approach is proposed. In order to implement this approach in practice, a tool has been developed to facilitate construction of a lessons learned database that contains risk-related information and risk assessment throughout the life cycle of a project. The tool is tested on a real construction project. The case study findings demonstrate that it can be used for storing as well as updating risk-related information and finally, carrying out a post-project appraisal. The major weaknesses of the tool are identified as, subjectivity of the risk rating process and unwillingness of people to enter information about reasons of failure.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Despite its huge potential in risk analysis, the Dempster–Shafer Theory of Evidence (DST) has not received enough attention in construction management. This paper presents a DST-based approach for structuring personal experience and professional judgment when assessing construction project risk. DST was innovatively used to tackle the problem of lacking sufficient information through enabling analysts to provide incomplete assessments. Risk cost is used as a common scale for measuring risk impact on the various project objectives, and the Evidential Reasoning algorithm is suggested as a novel alternative for aggregating individual assessments. A spreadsheet-based decision support system (DSS) was devised to facilitate the proposed approach. Four case studies were conducted to examine the approach's viability. Senior managers in four British construction companies tried the DSS and gave very promising feedback. The paper concludes that the proposed methodology may contribute to bridging the gap between theory and practice of construction risk assessment.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The +Contigo Project is a longitudinal research project based on a multilevel network intervention aimed at promoting mental health and well-being and preventing suicidal behaviors. Students participate in social skills training sessions on the stigma of mental disorders, adolescence, self-esteem, problem-solving skills, and wellbeing. Problem statement: To identify the qualitative impact of the +Contigo Project. Objectives: To identify the importance of the project for students, the problem situations which it helped to solve, and its impact on an individual level. Research methods: Content analysis (Bardin, 2009) with a posteriori categorical identification. Semi-structured interview guide with 5 questions. A convenience sample of 16 students, from three schools of one school cluster in the Center Region of Portugal, was used. The ethical aspects of parental consent, voluntary participation and data confidentiality were addressed. Findings: Fourteen categories emerged from the data analysis. The answers to Question 4 'How was this project important to you?' were particularly relevant. Students mentioned that it improved their self-esteem by increasing self-confidence and interpersonal skills, and that it increased their reflection and awareness on problems with which they learned how to cope during the sessions. Conclusions: All interviewees considered that the +Contigo project helped them to solve problems, improve their interpersonal skills and cope with the adolescence period. Students improved their self-esteem and self-knowledge, and were able to apply what they had learned in the sessions in their daily lives. We concluded that the project had a positive impact on the students' mental health.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The concept of constructability is to use construction knowledge and experience during all phases of a project, particularly in the earliest phases of planning and design. It facilitates project objectives before delivery stage, and decreases unnecessary costs during construction phase. Despite the extensive use, constructability concept fails to address many issues related to Operation and Maintenance (O&M) of construction projects. Extending constructability concept, to include the O&M issues, could lead to the projects that are not fitted for construction purposes only, but also fitted for use. This study reviews the literature of constructability implementation, its benefits and shortcomings during the infrastructure life cycle, as well as the delivery success factors of infrastructure projects. This contributes to the propose need of a model to improve the effectiveness and efficiency of infrastructure project by extending the concept of constructability to include O&M. Development of such a model can facilitate post-occupancy stakeholders’ participation in a constructability program. It will help infrastructure owners eliminate project reworks, and improve O&M effectiveness and efficiency.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

With the growing importance of sustainability assessment in the construction industry, many green building rating schemes have been adopted in the building sector of Australia. However, there is an abnormal delay in the similar adoption in the infrastructure sector. This prolonged delay in practice poses a challenge in mapping the project objectives with sustainability outcomes. Responding to the challenge of sustainable development in infrastructure, it is critical to create a set of decision indicators for sustainability in infrastructure, which to be used in conjunction with the emerging infrastructure sustainability assessment framework of the Australian Green Infrastructure Council. The various literature sources confirm the lack of correlation between sustainability and infrastructure. This theoretical missing link signifies the crucial validation of the interrelationship and interdependency in sustainability, decision making and infrastructure. This validation is vital for the development of decision indicators for sustainability in infrastructure. Admittedly, underpinned by the serious socio-environmental vulnerability, the traditional focus on economic emphasis in infrastructure development needs to be drifted towards the appropriate decisions for sustainability enhancing the positive social and environmental outcomes. Moreover, the research findings suggest sustainability being observed as powerful socio-political and influential socio-environmental driver in deciding the infrastructure needs and its development. These newly developed sustainability decision indicators create the impetus for change leading to sustainability in infrastructure by integrating the societal cares, environmental concerns into the holistic financial consideration. Radically, this development seeks to transform principles into actions for infrastructure sustainability. Lastly, the thesis concludes with knowledge contribution in five significant areas and future research opportunities. The consolidated research outcomes suggest that the development of decision indicators has demonstrated sustainability as a pivotal driver for decision making in infrastructure.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The concept of constructability integrates individual construction functions and experiences through suitable and timely inputs into early stages of project planning and design. It aims to ease construction processes for a more effective and efficient achievement of overall project objectives. Similarly, the concepts of operability and maintainability integrate the functions and experiences of Operation and Maintenance (O&M) into project planning and design. Various studies suggested that these concepts have been implemented in isolation of each other and thus preventing optimum result in delivering infrastructure projects. This paper explores the integration of these three concepts in order to maximize the benefits of their implementation. It reviews the literature to identify the main O&M concerns, and assesses their association with constructability principles. This provides a structure to develop an extended constructability model that includes O&M concerns. It is anticipated that an extended constructability model that include O&M considerations can lead to a more efficient and effective delivery of infrastructure projects.