868 resultados para Project management score index


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates the role of cultural factors as possible partial explanation of the disparity in terms of project management deployment observed between various studied countries. The topic of culture has received increasing attention in the management literature in general during the last decades and in the project management literature in particular during the last few years. The globalization of businesses and worldwide Governmental/International organizations collaborations drives this interest in the national culture to increase more and more. Based on Hofstede national culture framework, the study hypothesizes and tests the impact of the culture and development of the country on the PM deployment. Seventy-four countries are selected to conduct a correlation and regression analysis between Hofstede’s national culture dimensions and the used PM deployment indicator. The results show the relations between various national culture dimensions and development indicator (GDP/Capita) on the project management deployment levels of the considered countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates the role of cultural factors as possible partial explanation of the disparity in terms of Project Management Deployment observed between various studied countries. The topic of culture has received increasing attention in the management literature in general during the last decades and in the Project Management literature in particular during the last few years. The globalization of businesses and worldwide Governmental / International organizations collaborations drives this interest in the national culture to increase more and more. Based on Hofstede national culture framework, the study hypothesizes and tests the impact of the culture and development of the country on the PM Deployment. 74 countries are selected to conduct a correlation and regression analysis between Hofstede’s national culture dimensions and the used PM Deployment indicator. The results show the relations between various national culture dimensions and development indicator (GDP/Capita) on the Project Management Deployment levels of the considered countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research inquires into the value of two common ‘management technologies’, namely ISO 9001 and project management. To avoid certain methodological problems, we study the value of these micro-level practices by inductively analysing macro-level data, specifically the intensity of project management and ISO 9001 certification (termed project management score and ISO 9001 score) in different countries against national measures of wealth and innovation. There is no correlation between ISO 9001 score and innovation, while high ISO 9001 scores are correlated with decreasing levels of wealth. The project management score is positively correlated with wealth and with innovation, though very high project management scores are negatively correlated with innovation. The study includes a cluster analysis which finds that, with one exception, countries tend to adopt either project management or ISO 9001 but not both. The analysis indicates that project management is more likely to be associated with high innovation and high wealth than ISO 9001.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aims of this theme are: •to identify and develop personal attributes that enable postgraduate students to manage a research project to the correct standard and to complete it on time; •to enable postgraduate students to plan and organise their research project in order to successfully reach their full potential in their chosen postgraduate degree; •to enable postgraduate students to apply appropriate time management skills to the planning of their research project; •to identify study skills and resource management strategies that can benefit postgraduate students to effectively organise and research their chosen field; •to develop team work skills within the postgraduate cohort studying the Project Management core theme.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The acquisition of technical, contextual and behavioral competences is a prerequisite for sustainable development and strengthening of rural communities. Territorial display of the status of these skills helps to design the necessary learning, so its inclusion in planning processes is useful for decision making. The article discusses the application of visual representation of competences in a rural development project with Aymara women communities in Peru. The results show an improvement of transparency and dialogue, resulting in a more successful project management and strengthening of social organization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of ―learning strategy‖. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facing the frequent failure of projects in rural areas with top-down approaches, there has been a promotion of participation of the local people in decisions that affect their territories (bottom-up approach) to promote sustainable regional development (Chambers, 1997; Lusthaus et al., 1999; Horton, 2004; Vazquez-Barquero, 2000). In fact participation was deemed necessary to ensure the success and sustainability of projects (UNDP, 2006; WRI, 2008; Davies, 2009). Hence, the progressive strengthening of the local population should be promoted so that they can acquire a range of skills and knowledge that allow them to manage resources properly and undertake productive activities in their territory (Contreras, 2000). These are intangibles and therefore difficult to measure. Hence, in this research a model of integration of intangibles in rural development projects management is proposed. The model designed supplements and enriches the conceptual framework ?Working with People? WWP (Cazorla et al, 2013).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The advancement of science and engineering projects is brewing major changes in the various phases of a project. These changes have produced more rigorous aspects of project management that tracks the research fronts of engineering and project management becomes key. However, research in engineering and project management in Spanish is hindered by access to information to enable the person concerned to ascertain the most recent and current research, limiting the exchange of information and strengthening research networks in this field interest with great implications in business, industry and scientific issues. Therefore, the article aims to present the state of the art of engineering research and project management in Spanish, using the analysis of scientific domains and network analysis of the research literature to identify and analyze relationships between authors and documents that establish the base and research fronts topic under study. The results also provide statistics on the contribution of international research in Spanish and scientific collaboration networks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study analyzes the manifestation of the dimensions of Entrepreneurial Orientation (EO) and Project Management Systems (PMS). We used a qualitative approach to conduct exploratory research through a study in literature and a pilot case in a software company. Data was collected from semi structured interviews, documents, and records on file, then triangulated and treated with content analysis. The model proposed for the relationship between the types of PMS (ad hoc, Classic PM, innovation, entrepreneurship/intrapreneurship) and the dimensions of EO (innovativeness, risk-taking, proactiveness, competitive aggressiveness, and autonomy), was partially corroborated by empirical studies. New studies are suggested to validate the applicability and setup of the model.