978 resultados para Project Outcomes


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Implementing educational reform requires partnerships, and university-school collaborations in the form of investigative and experimental projects can aim to determine the practicalities of reform. However, there are funded projects that do not achieve intended outcomes. In the context of a new reform initiative in education, namely, science, technology, engineering and mathematics (STEM) education, this article explores the management of a government-funded project. In a university school partnership for STEM education, how can leadership be distributed for achieving project outcomes? Participants included university personnel from different STEM areas, school teachers and school executives. Data collected included observations, interviews, resource materials, and video and photographic images. Findings indicated that leadership roles were distributed and selfactivated by project partners according to their areas of expertise and proximal activeness to the project phases, that is: (1) establishing partnerships; (2) planning and collaboration; (3) project implementation; and (4) project evaluation and further initiatives. Leadership can be intentional and unintentional within project phases, and understanding how leadership can be distributed and selfactivated more purposefully may aid in generating more expedient project outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The principle aim of the research is to develop a framework that provides certainty for end-users and clients to achieve, from capital works projects, an outstanding or excellent outcome while creating additional wealth for all stakeholders and suppliers. If the framework were applied to all Australian capital works projects, there would be $10bn savings each year to the total economy.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Mismanagement of large-scale, complex projects has resulted in spectacular failures, cost overruns, time blowouts, and stakeholder dissatisfaction. We focus discussion on the interaction of key management and leadership attributes which facilitate leaders’ adaptive behaviors. These behaviors should in turn influence adaptive team member behavior, stakeholder engagement and successful project outcomes, outputs and impacts. An understanding of this type of management will benefit from a perspective based in managerial and organizational cognition. The research question we explore is whether successful leaders of large-scale complex projects have an internal process leading to a display of administrative, adaptive, and enabling behaviors that foster adaptive processes and enabling behaviors within their teams and with external stakeholders. At the core of the model we propose interactions of key attributes, namely cognitive flexibility, affect, and emotional intelligence. The result of these cognitive-affective attribute interactions is leadership leading to enhanced likelihood of complex project success.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.