890 resultados para Project Management, Risk Management, Risk Management Plan in Portuguese Navy
Resumo:
Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.
Resumo:
This thesis presents SEELF (Sustainable EEL fishery) Index, a methodology for evaluation of European eel (Anguilla anguilla) for the implementation of an effective Eel Management Plan, as defined by EU Regulation No.1100/2007. SEELF uses internal and external indices, age and blood parameters, and selects suitable specimen for restocking; it is also a reliable tool for eel stock management. In fact, SEELF Index, was developed in two versions: SEELF A, to be used in field operations (catch&release, eel status monitoring) and SEELF B to be used for quality control (food production) and research (eel status monitoring). Health status was evaluated also by biomarker analysis (ChE), and data were compared with age of eel. Age determination was performed with otolith reading and fish scale reading and a calibration between the two methods was possible. The study area was the Comacchio lagoon, a brackish coastal lagoon in Italy, well known as an example of suitable environment for eel fishery, where the capability to use the local natural resources has long been a key factor for a successful fishery management. Comacchio lagoon is proposed as an area where an effective EMP can be performed, in agreement with the main features (management of basins, reduction of mortality due to predators,etc.) highlighted for designation of European Restocking Area (ERA). The ERA is a new concept, proposed as a pillar of a new strategy on eel management and conservation. Furthermore, the features of ERAs can be useful in the framework of European Scale Eel Management Plan (ESEMP), proposed as a European scale implementation of EMP, providing a more effectiveness of conservation measures for eel management.
Resumo:
The goal of this paper is to show the results of an on-going experience on teaching project management to grade students by following a development scheme of management related competencies on an individual basis. In order to achieve that goal, the students are organized in teams that must solve a problem and manage the development of a feasible solution to satisfy the needs of a client. The innovative component advocated in this paper is the formal introduction of negotiating and virtual team management aspects, as different teams from different universities at different locations and comprising students with different backgrounds must collaborate and compete amongst them. The different learning aspects are identified and the improvement levels are reflected in a rubric that has been designed ad hoc for this experience. Finally, the effort frameworks for the student and instructor have been established according to the requirements of the Bologna paradigms. This experience is developed through a software-based support system allowing blended learning for the theoretical and individual?s work aspects, blogs, wikis, etc., as well as project management tools based on WWW that allow the monitoring of not only the expected deliverables and the achievement of the goals but also the progress made on learning as established in the defined rubric
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of “learning strategy”. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper
Resumo:
The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of ―learning strategy‖. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper.
Resumo:
The exercise of management and leadership are key aspects to achieve objectives, goals and relationships in the current knowledge society marked by increasingly competitive environments in which cognitive factors, creativity, knowledge and information determine the success of organizations. Both concepts have been historically associated with the male domain because of the underrepresentation of women in managerial positions. However, the increasing participation of women in the workplace has led to the development of an extensive literature on the possible existence of differences between the styles of male and female leadership, although it has not been addressed from the analysis of competences associated with each sex. Through a participatory process the abilities and skills related to women managers are analyzed and the differences in leadership styles. The results indicate that women particularly value the skills associated with human relationships, and that female leadership style tends to be transformational.
Resumo:
Are you ready for a tender project? – Analysis of organisational project management maturity in the Austrian- Hungarian border region. Since the 1990s the European Union has paid more and more attention to subsidising cross-border development. It is understandable that different funding from proposal sources is particularly important for the border area, especially to those of utmost importance that support co-operation and rural development. Therefore, they could become a driving force for development. The authors’ research analyses the organisational project management maturity of the projects implemented in the frame of the Austria-Hungary Cross-border Cooperation Programme 2007-2013 (AT-HU). Analysing this kind of organisation is an important issue, since the new call for proposals are open in 2016 and the results of this study may provide a self-evaluation opportunity to organisations that need to know if they are ready or mature enough for a new tender project. The aim of this study was twofold. First of all, those indicators that could be used to analyse the project management maturity of implementing organisations in the AT-HU programme were identified. Based on the empirical research these are the project experience accumulated by the organisation, the internal processes operating at the institution and the professional background. Secondly, factors that can affect this project management maturity were explored and we determined five influencing area: the organisational structure, culture, project managers motivation and the typical and important competences.
Resumo:
Purpose: The aim of this paper is to analyse the development of environmental management practices by Portuguese local entities and their determining factors. Design/methodology/approach: The data were collected by sending a postal questionnaire. In order to measure the degree of development of environmental management practices an index of environmental management practices (EMPI) was developed, which reflects the extent to which a set of 16 environmental management practices have been implemented by the entities included in the sample. Four variables are considered in this study as possible factors that drive the development of environmental management practices by local entities, namely type of entity, size, proactive environmental strategy and Local Agenda 21 Findings: Results indicate the degree of development of environmental management practices in Portuguese local entities is low. Additionally, entity size, the adoption of proactive environmental strategies and the implementation of Local Agenda 21 are explaining factors of the degree of development of such practices. Originality/value: This study adds to the international research on environmental management in public sector by providing empirical data from a country, Portugal, where empirical evidence is still relatively limited.
Resumo:
Purpose – The purpose of this paper is to analyse the development of environmental management practices by Portuguese local entities and their determining factors. Design/methodology/approach – The data were collected by sending a postal questionnaire. In order to measure the degree of development of environmental management practices, an index of environmental management practices (EMPI) was developed, which reflects the extent to which a set of 16 environmental management practices have been implemented by the entities included in the sample. In total, four variables are considered in this study as possible factors that drive the development of environmental management practices by local entities: type of entity; size; proactive environmental strategy; and Local Agenda 21. Findings – Results indicate the degree of development of environmental management practices in Portuguese local entities is low. Additionally, entity size, the adoption of proactive environmental strategies and the implementation of Local Agenda 21 are explaining factors of the degree of development of such practices. Originality/value – The paper adds to the international research on environmental management in the public sector by providing empirical data from a country, Portugal, where empirical evidence is still relatively limited.
Resumo:
A gestão de projetos tem vindo a ser considerada uma arma competitiva para as organizações, a qual possibilita níveis de eficiência, qualidade e respetivo valor acrescentado sobre o produto ou serviço disponibilizado. A aplicação de conhecimentos e práticas nesta área permite um rigoroso controlo das principais componentes de um projeto, mesmo que essas componentes sejam consideradas variáveis incertas, devido a serem caracterizadas pela sua imprevisibilidade de ocorrência e pela sua influência sobre os objetivos do projeto. Deste modo, a gestão do risco viabiliza um tratamento destas variáveis que condicionam o sucesso do projeto, classificadas como riscos, daí a importância desta gestão ser efetuada de uma forma adequada e o mais completa possível. A Marinha Portuguesa adaptou a doutrina de gestão de projetos às suas atividades, edificando a Capacidade de Gestão de Projetos. Esta capacidade permitiu compilar a informação e as técnicas reconhecidas pela doutrina que, se julgaram indispensáveis para o cumprimento das atividades. Todavia, a doutrina tem vindo a ser atualizada permitindo, cada vez mais, condições de sucesso garantido através da aplicação de conhecimentos e procedimentos válidos em todas as áreas de conhecimento da gestão de projetos. Neste sentido, a presente investigação tem como objetivo principal, o estudo de uma das áreas mais delicadas da gestão de projetos, a gestão do risco, possibilitando a atualização e otimização desta área do conhecimento, adaptada à Marinha Portuguesa, através da conceção de um modelo do Plano de Gestão do Risco. Este documento trata e revela o modo como será executada a gestão do risco por meio de estratégias e técnicas devidamente selecionadas, garantindo o sucesso dos projetos e respetivo valor acrescentado para a organização.
Resumo:
Currently, there are many instances where public sector organizations and government entities collapse and are unable to provide the required services to the public. Such organizations do not have effective mechanisms of control or any specific department which manages projects occurring in the organization. However, this study suggests the incorporation of the Project Management Office (PMO) in public sector organizations for the purpose of managing project management. There are other relevant roles of the PMO discussed in this study. The study is contextualized with respect to Corporate Governance, Risk Management, and Compliance (GRC) and the study shows how PMO can benefit or compliment GRC and provide overall better standards of practice for public sector organizations. The study uses a mixed methodology for data collection and the findings contribute to the body of knowledge regarding PMO's and GRC.
Resumo:
This paper investigates the relationship of the project management in Private Finance Initiative (PFI) and sustainability. A live PFI project is selected as a case study, where contract review and monitoring on project management are carried out to evaluate the sustainability of project management. The PFI procurement shows great advantages in increased contractual responsibilities of the contractor in sustainable construction, and also in practicing sustainability in project management. Six main sustainable attributes of the project management are selected to evaluate the sustainability of project management in the PFI project. The project management process in the case study is closely monitored in order to verify how the PFI project promotes sustainability in practice. The project management in the different stages of the PFI project, including tendering, design, construction and operation, contributes to the six sustainable attributes in different ways. The project management in PFI project paid more attention in sustainable development during its whole process. As the private sector is responsible to the whole life of the building project, the project manager has to consider the long-term benefits during the management process. The government should take advantages of PFI project management in practicing sustainability therefore to promote sustainable development of the national infrastructure services.
Resumo:
This work presents an educational formal initiative aimed to monitor the acquisition and strengthening of competences by students that are being taught in project management subject. Groups of students belonging to three universities, embracing different knowledge areas such as engineering, biology, etc., were selected to run the experience. All of them had nevertheless a common and basic starting point: inexperience in project management field. In this scenario, we propose a new theoretical and practical approach oriented to reinforce problem-solving and related competences in a project management subject context. For this purpose, a Project-Based Learning (PjBL) initiative has been specifically designed and developed. The main idea is to bring a real world engineering project management case into the classroom, where students must face up to a completely new learning approach –groups in different locations, collaborative mode and unspecific solution, supported by a powerful internet platform:.project.net (http://www.Project.net). Other relevant aspects such as project climate, knowledge increasing, have also been monitored during the course. Results show and overall improvement in key competences. The obtained information will be used in two ways: to feed the students back about personal opportunities for improvement in specific competences, and to fine-tune the experience for further initiatives.
Resumo:
This project supported the planning and conduct of a two-day Iowa Department of Transportation–hosted peer exchange for state agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research Program–sponsored project R10, Project Management Strategies for Complex Projects. Presentations were made by participating states, and several opportunities were provided for directed discussion. General themes emerging from the presentations and discussions were identified as follows: To implement improvements in project management processes, agency leadership needs to decide that a new approach to project management is worth pursuing and then dedicate resources to developing a project management plan. The change to formalized project management and five-dimensional project management (5DPM) requires a culture shift in agencies from segmented “silo” processes to collaborative, cooperative processes that make communication and collaboration high priorities. Agencies need trained project managers who are empowered to execute the project management plan, as well as properly trained functional staff. Project management can be centralized or decentralized with equal effect. After an agency’s project management plan and structure are developed, software tools and other resources should be implemented to support the plan and structure. All projects will benefit from enhanced project management, but the project management plan should specify appropriate approaches for several project levels as defined by factors in addition to dollar value. Project management should be included in an agency’s project development manual.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.