989 resultados para Project Complexity


Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the rapid development in technology over recent years, construction, in common with many areas of industry, has become increasingly complex. It would, therefore, seem to be important to develop and extend the understanding of complexity so that industry in general and in this case the construction industry can work with greater accuracy and efficiency to provide clients with a better service. This paper aims to generate a definition of complexity and a method for its measurement in order to assess its influence upon the accuracy of the quantity surveying profession in UK new build office construction. Quantitative data came from an analysis of twenty projects of varying size and value and qualitative data came from interviews with professional quantity surveyors. The findings highlight the difficulty in defining and measuring project complexity. The correlation between accuracy and complexity was not straightforward, being subjected to many extraneous variables, particularly the impact of project size. Further research is required to develop a better measure of complexity. This is in order to improve the response of quantity surveyors, so that an appropriate level of effort can be applied to individual projects, permitting greater accuracy and enabling better resource planning within the profession.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of “learning strategy”. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this paper is to address the methodological process of a teaching strategy for training project management complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of ―learning strategy‖. The strategy has two phases: firstly, the integration of the competences —technical, behavioral and contextual—in real projects; and secondly, the learning activity was oriented in upper level of knowledge, the evaluating the complexity for projects management in real situations. Both the competences in the learning strategy and the Project Complexity Evaluation are based on the ICB of IPMA. The learning strategy is applied in an international Postgraduate Program —Erasmus Mundus Master of Science— with the participation of five Universities of the European Union. This master program is fruit of a cooperative experience from one Educative Innovation Group of the UPM -GIE-Project-, two Research Groups of the UPM and the collaboration with other external agents to the university. Some reflections on the experience and the main success factors in the learning strategy were presented in the paper.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The growing need to patrol and survey large maritime and terrestrial areas increased the need to integrate external sensors on aircraft in order to accomplish those patrols at increasingly higher altitudes, longer range and not depending upon vehicle type. The main focus of this work is to elaborate a practical, simple, effective and efficient methodology for the aircraft modification procedure resulting from the integration of an Elec-tro-Optical/Infra-Red (EO/IR) turret through a support structure. The importance of the devel-opment of a good methodology relies on the correct management of project variables as time, available resources and project complexity. The key is to deliver a proper tool for a project de-sign team that will be used to create a solution that fulfils all technical, non-technical and certi-fication requirements present in this field of transportation. The created methodology is inde-pendent of two main inputs: sensor model and aircraft model definition, and therefore it is in-tended to deliver the results for different projects besides the one that was presented in this work as a case study. This particular case study presents the development of a structure support for FLIR STAR SAPHIRE III turret integration on the front lower fuselage bulkhead (radome) of the LOCKHEED MARTIN C-130 H. Development of the case study focuses on the study of local structural analysis through the use of Finite Element Method (FEM). Development of this Dissertation resulted in a cooperation between Faculty of Science and Technology - Universidade Nova de Lisboa and the company OGMA - Indústria Aeronáutica de Portugal

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Objectives: To analyze the relationship between pharmacotherapeutical complexity and compliance of therapeutic objectives in HIV+ patients on antiretroviral treatment and concomitant dyslipidemia therapy. Materials and methods: A retrospective observational study including HIV patients on stable antiretroviral treatment during the past 6 months, and dyslipidemia treatment between January and December, 2013. The complexity index was calculated with the tool developed by McDonald et al. Other variables analyzed were: age, gender, risk factor of HIV, smoking, alcoholism and drugs, psychiatric disorders, adherence to antiretroviral treatment and lipid lowering drugs, and clinical parameters (HIV viral load, CD4 count, plasma levels of total cholesterol, LDL, HDL, and triglycerides). In order to determine the predictive factors associated with the compliance of therapeutic objectives, univariate analysis was conducted through logistical regression, followed by a multivariate analysis. Results: The study included 89 patients; 56.8% of them met the therapeutic objectives for dyslipidemia. The complexity index was significantly higher (p = 0.02) in those patients who did not reach the objective values (median 51.8 vs. 38.9). Adherence to lipid lowering treatment was significantly associated with compliance of the therapeutic objectives established for dyslipidemia treatment. A 67.0% of patients met the objectives for their antiretroviral treatment; however, the complexity index was not significantly higher (p = 0.06) in those patients who did not meet said objectives. Conclusions: Pharmacotherapeutical complexity represents a key factor in terms of achieving health objectives in HIV+ patients on treatment for dyslipidemia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electrical activity is extremely broad and distinct, requiring by one hand, a deep knowledge on rules, regulations, materials, equipments, technical solutions and technologies and assistance in several areas, as electrical equipment, telecommunications, security and efficiency and rational use of energy, on the other hand, also requires other skills, depending on the specific projects to be implemented, being this knowledge a characteristic that belongs to the professionals with relevant experience, in terms of complexity and specific projects that were made.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The CDIO Initiative is an open innovative educational framework for engineering graduation degrees set in the context of Conceiving – Designing – Implementing – Operating real-world systems and products, which is embraced by a network of worldwide universities, the CDIO collaborators. A CDIO compliant engineering degree programme typically includes a capstone module on the final semester. Its purpose is to expose students to problems of a greater dimension and complexity than those faced throughout the degree programme as well as to put them in contact with the so-called real world, in opposition to the academic world. However, even in the CDIO context, there are barriers that separate engineering capstone students from the real world context of an engineering professional: (i) limited interaction with experts from diverse scientific areas; (ii) reduced cultural and scientific diversity within the teams; and (iii) lack of a project supportive framework to foster the complementary technical and non-technical skills required in an engineering professional. To address these shortcomings, we propose the adoption of the European Project Semester (EPS) framework, a one semester student centred international capstone programme offered by a group of European engineering schools (the EPS Providers) as part of their student exchange programme portfolio. The EPS package is organised around a central module – the EPS project – and a set of complementary supportive modules. Project proposals refer to open multidisciplinary real world problems and supervision becomes coaching. The students are organised in teams, grouping individuals from diverse academic backgrounds and nationalities, and each team is fully responsible for conducting its project. EPS complies with the CDIO directives on Design-Implement experiences and provides an integrated framework for undertaking capstone projects, which is focussed on multicultural and multidisciplinary teamwork, problem-solving, communication, creativity, leadership, entrepreneurship, ethical reasoning and global contextual analysis. As a result, we recommend the adoption of the EPS within CDIO capstone modules for the benefit of engineering students.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes the development of biologically inspired robots as the capstone project of the European Project Semester (EPS) framework. EPS is a one semester student centred international programme offered by a group of European engineering schools (EPS Providers) as part of their student exchange programme portfolio. EPS is organized around a central module (the EPS project) and a set of complementary supportive modules. Project proposals refer to open multidisciplinary real world problems. Its purpose is to expose students to problems of a greater dimension and complexity than those faced throughout the degree programme as well as to put them in contact with the socalled real world, in opposition to the academic world. Students are organized in teams, grouping individuals from diverse academic backgrounds and nationalities, and each team is fully responsible for conducting its project. EPS provides an integrated framework for undertaking capstone projects, which is focused on multicultural and multidisciplinary teamwork, communication, problem-solving, creativity, leadership, entrepreneurship, ethical reasoning and global contextual analysis. The design and development of biologically inspired robots allows the students to fulfil the previously described requirements and objectives and, as a result, we recommend the adoption of these projects within the EPS project capstone module for the benefit of engineering students.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis applied real options analysis to the valuation of an offshore oil exploration project, taking into consideration the several options typically faced by the management team of these projects. The real options process is developed under technical and price uncertainties, where it is considered that the mean reversion stochastic process is more adequate to describe the movement of oil price throught time. The valuation is realized to two case scenarios, being the first a simplified approach to develop the intuition of the used concepts, and the later a more complete cases that is resolved using both the binomial and trinomial processes to describe oil price movement. Real options methodology demonstrated to be capable of assessing and valuing the projects options, and of overcoming common capital budgeting methodologies flexibility limitation. The added value of the application of real options is evident, but so is the method's increased complexity, which adversely influence its widespread implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

AbstractIn addition to genetic changes affecting the function of gene products, changes in gene expression have been suggested to underlie many or even most of the phenotypic differences among mammals. However, detailed gene expression comparisons were, until recently, restricted to closely related species, owing to technological limitations. Thus, we took advantage of the latest technologies (RNA-Seq) to generate extensive qualitative and quantitative transcriptome data for a unique collection of somatic and germline tissues from representatives of all major mammalian lineages (placental mammals, marsupials and monotremes) and birds, the evolutionary outgroup.In the first major project of my thesis, we performed global comparative analyses of gene expression levels based on these data. Our analyses provided fundamental insights into the dynamics of transcriptome change during mammalian evolution (e.g., the rate of expression change across species, tissues and chromosomes) and allowed the exploration of the functional relevance and phenotypic implications of transcription changes at a genome-wide scale (e.g., we identified numerous potentially selectively driven expression switches).In a second project of my thesis, which was also based on the unique transcriptome data generated in the context of the first project we focused on the evolution of alternative splicing in mammals. Alternative splicing contributes to transcriptome complexity by generating several transcript isoforms from a single gene, which can, thus, perform various functions. To complete the global comparative analysis of gene expression changes, we explored patterns of alternative splicing evolution. This work uncovered several general and unexpected patterns of alternative splicing evolution (e.g., we found that alternative splicing evolves extremely rapidly) as well as a large number of conserved alternative isoforms that may be crucial for the functioning of mammalian organs.Finally, the third and final project of my PhD consisted in analyzing in detail the unique functional and evolutionary properties of the testis by exploring the extent of its transcriptome complexity. This organ was previously shown to evolve rapidly both at the phenotypic and molecular level, apparently because of the specific pressures that act on this organ and are associated with its reproductive function. Moreover, my analyses of the amniote tissue transcriptome data described above, revealed strikingly widespread transcriptional activity of both functional and nonfunctional genomic elements in the testis compared to the other organs. To elucidate the cellular source and mechanisms underlying this promiscuous transcription in the testis, we generated deep coverage RNA-Seq data for all major testis cell types as well as epigenetic data (DNA and histone methylation) using the mouse as model system. The integration of these complete dataset revealed that meiotic and especially post-meiotic germ cells are the major contributors to the widespread functional and nonfunctional transcriptome complexity of the testis, and that this "promiscuous" spermatogenic transcription is resulting, at least partially, from an overall transcriptionally permissive chromatin state. We hypothesize that this particular open state of the chromatin results from the extensive chromatin remodeling that occurs during spermatogenesis which ultimately leads to the replacement of histones by protamines in the mature spermatozoa. Our results have important functional and evolutionary implications (e.g., regarding new gene birth and testicular gene expression evolution).Generally, these three large-scale projects of my thesis provide complete and massive datasets that constitute valuables resources for further functional and evolutionary analyses of mammalian genomes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Climate change affects the rate of insect invasions as well as the abundance, distribution and impacts of such invasions on a global scale. Among the principal analytical approaches to predicting and understanding future impacts of biological invasions are Species Distribution Models (SDMs), typically in the form of correlative Ecological Niche Models (ENMs). An underlying assumption of ENMs is that species-environment relationships remain preserved during extrapolations in space and time, although this is widely criticised. The semi-mechanistic modelling platform, CLIMEX, employs a top-down approach using species ecophysiological traits and is able to avoid some of the issues of extrapolation, making it highly applicable to investigating biological invasions in the context of climate change. The tephritid fruit flies (Diptera: Tephritidae) comprise some of the most successful invasive species and serious economic pests around the world. Here we project 12 tephritid species CLIMEX models into future climate scenarios to examine overall patterns of climate suitability and forecast potential distributional changes for this group. We further compare the aggregate response of the group against species-specific responses. We then consider additional drivers of biological invasions to examine how invasion potential is influenced by climate, fruit production and trade indices. Considering the group of tephritid species examined here, climate change is predicted to decrease global climate suitability and to shift the cumulative distribution poleward. However, when examining species-level patterns, the predominant directionality of range shifts for 11 of the 12 species is eastward. Most notably, management will need to consider regional changes in fruit fly species invasion potential where high fruit production, trade indices and predicted distributions of these flies overlap.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The importance of Information Technology (IT) in the business environment is continuously growing. This stimulates the increase of size, complexity and number of IT projects and raises the need for IT Project Portfolio Management (IT PPM). While being actively discussed for the last few decades, IT PPM has a short history of practical implementation. This creates inconsistency in the views of different authors and provides an opportunity for additional research. As a first step, this research explores the existing studies and brings together the views of different authors on IT PPM. As a result, a high-level IT PPM Process Cycle and a set of Key Success Factors for IT PPM are proposed. IT PPM Process Cycle gives an overview of the main elements of IT PPM process, while the set of Key Success Factors provides a number of factors that should be considered during the implementation. As a second step, both theoretical deliverables are empirically tested by a case study and a survey conducted in a big multinational company. The case study is used to analyze process framework of the studied company towards the developed IT PPM Process Cycle. Subsequently, a survey was conducted among subject matter experts of the same company to evaluate the importance and relevance of the proposed Key Success Factors. Finally, this thesis concludes with findings made during the case study and provides an empirically tested selection of factors to be taken into account. These two deliverables can be used by both academics and practitioners to close the gaps in existing literature and assist in IT PPM implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project evolved out of a search for ways to conduct research on “others” in a way that does not exploit, stigmatize or misrepresent their experience. This thesis is an ethnographic study in leisure research and youth work and an experiment in running a photovoice project. Photovoice is a participatory visual method that embodies the emancipatory ideal of empowering others through self-representation. The literature on photovoice lacks a comprehensive discussion on the complexity of power and representation. Postmodern theorists have proposed that participatory methods are not benign and that initiatives are acts of power in themselves that produce effects (Cook & Kothari, 2001). A Foucauldian analysis of power is used to deconstruct the researcher’s practice and reflect on why and how youth are “engaged”. This project seeks to embrace the principle of working “with” others, but also work from a postmodern perspective that acknowledges power and representation as ongoing problems.