917 resultados para Project 2006-034-C : Procurement method Toolkit


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The decision as to which procurement system to adopt is a complex and challenging task for clients of construction projects. Despite a plethora of tools and techniques available for selecting a procurement method, clients are still uncertain about what method to adopt for a given construction project to achieve success. This paper examines ‘how and why’ procurement methods are selected by public sector clients in Queensland (QLD) and Western Australia (WA). Findings from workshops with senior managers in procurement selection revealed that traditional lump sum methods (TLS) are preferred even though alternative forms could be better suited for a given project. Participants of the workshops agreed that alternative procurement forms should be considered for projects but an embedded culture of uncertainty avoidance meant the selection of TLS methods. It was perceived that only a limited number of contractors operating in the marketplace have the resources and experience to deliver projects using the non-traditional methods.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective. The aim of this paper is to report the clinical practice changes resulting from strategies to standardise diabetic foot clinical management in three diverse ambulatory service sites in Queensland, Australia. Methods. Multifaceted strategies were implemented in 2008, including: multidisciplinary teams, clinical pathways, clinical training, clinical indicators, and telehealth support. Prior to the intervention, none of the aforementioned strategies were used, except one site had a basic multidisciplinary team. A retrospective audit of consecutive patient records from July 2006 to June 2007 determined baseline clinical activity (n = 101).Aclinical pathway teleform was implemented as a clinical activity analyser in 2008 (n = 327) and followed up in 2009 (n = 406). Pre- and post-implementation data were analysed using Chi-square tests with a significance level set at P < 0.05. Results. There was an improvement in surveillance of the high risk population of 34% in 2008 and 19% in 2009, and treating according to risk of 15% in 2009 (P < 0.05). The documentation of all best-practice clinical activities performed improved 13–66% (P < 0.03). Conclusion. These findings support the use of multifaceted strategies to standardise practice and improve diabetic foot complications management in diverse ambulatory services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background Diabetic foot complications are recognised as the most common reason for diabetic related hospitalisation and lower extremity amputations. Multi-faceted strategies to reduce diabetic foot hospitalisation and amputation rates have been successful. However, most diabetic foot ulcers are managed in ambulatory settings where data availability is poor and studies limited. The project aimed to develop and evaluate strategies to improve the management of diabetic foot complications in three diverse ambulatory settings and measure the subsequent impact on ospitalisation and amputation. Methods Multifaceted strategies were implemented in 2008, including: multi-disciplinary teams, clinical pathways and training, clinical indicators, telehealth support and surveys. A retrospective audit of consecutive patient records from July 2006 – June 2007 determined baseline clinical indicators (n = 101). A clinical pathway teleform was implemented as a clinical record and clinical indicator analyser in all sites in 2008 (n = 327) and followed up in 2009 (n = 406). Results Prior to the intervention, clinical pathways were not used and multi-disciplinary teams were limited. There was an absolute improvement in treating according to risk of 15% in 2009 and surveillance of the high risk population of 34% and 19% in 2008 and 2009 respectively (p < 0.001). Improvements of 13 – 66% (p < 0.001) were recorded in 2008 for individual clinical activities to a performance > 92% in perfusion, ulcer depth, infection assessment and management, offloading and education. Hospitalisation impacts recorded reductions of up to 64% in amputation rates / 100,000 population (p < 0.001) and 24% average length of stay (p < 0.001) Conclusion These findings support the use of multi-faceted strategies in diverse ambulatory services to standardise practice, improve diabetic foot complications management and positively impact on hospitalisation outcomes. As of October 2010, these strategies had been rolled out to over 25 ambulatory sites, representing 66% of Queensland Health districts, managing 1,820 patients and 13,380 occasions of service, including 543 healed ulcer patients. It is expected that this number will rise dramatically as an incentive payment for the use of the teleform is expanded.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper introduces the underlying principles and the general features of a meta-method (MAP method) developed as part of and used in various research, education and professional development programmes at ESC Lille. This method aims at providing effective and efficient structure and process for acting and learning in various complex, uncertain and ambiguous managerial situations (projects, programmes, portfolios). The paper is developed around three main parts. First, I suggest revisiting the dominant vision of the project management knowledge field, based on the assumptions they are not addressing adequately current business and management contexts and situations, and that competencies in management of entrepreneurial activities are the sources of creation of value for organisations. Then, grounded on the former developments, I introduce the underlying concepts supporting MAP method seen as a ‘convention generator’ and how this meta method inextricably links learning and practice in addressing managerial situations. Finally, I briefly describe an example of application, illustrating with a case study how the method integrates Project Management Governance, and give few examples of use in Management Education and Professional Development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper introduces the underlying principles and the general features of a meta-method (MAP method – Management & Analysis of Projects) developed as part of and used in various research, education and professional development programmes at ESC Lille. This method aims at providing effective and efficient structure and process for acting and learning in various complex, uncertain and ambiguous managerial situations (projects, programmes, portfolios). The paper is organized in three parts. In a first part, I propose to revisit the dominant vision of the project management knowledge field, based on the assumptions they are not addressing adequately current business and management contexts and situations, and that competencies in management of entrepreneurial activities are the sources of creation of value for organisations. Then, grounded on the new suggested perspective, the second part presents the underlying concepts supporting MAP method seen as a ‘convention generator' and how this meta-method inextricably links learning and practice in addressing managerial situations. The third part describes example of application, illustrating with a brief case study how the method integrates Project Management Governance, and gives few examples of use in Management Education and Professional Development.