874 resultados para Project 2005-033-C : Business Drivers for BIM


Relevância:

100.00% 100.00%

Publicador:

Resumo:

his report describes in detail a project aimed at providing a better understanding of the business drivers and barriers to the adoption of Building Information Modelling (BIM) in the Architecture Engineering and Construction (AEC) and facility management (FM) industry sectors. The objectives of the project were to investigate the nature of economic, process and industry constraints to BIM adoption and then - if possible - to identify business strategies, and cost/benefit models that may support adoption of BIM in AEC/FM industry. The research was based on case studies from the property, construction and facility management sectors as well as other industries and interviews with business leaders and users of advanced applications of CAD in the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. the current documentation of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model an integrated building database could be created, that would support asset & facility management functions (see Sydney Opera House FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the Houses existing conventions and standards to the new model based environment can be related to three key factors: SOH Facilities Portfolio the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM). The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: The re-usability of building information for FM purposes BIM as an Integrated information model for facility management Extendibility of the BIM to cope with business specific requirements Commercial facility management software using standardised building information models The ability to add (organisation specific) intelligence to the model A roadmap for SOH to adopt BIM for FM The project has established that BIM building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC open building exchange standard specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user lock in to proprietary solutions, third party software can be the best of breed to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the Houses existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data provided by several of SOHs current consultants show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Digital Modelling Report incorporates the previous research completed for the FM Exemplar Project utilising the Sydney Opera House as a case study. The research has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House do not have digital models of its structure, there is an opportunity to investigate the application of Digital Facility Modelling using standardised Building Information Models (BIM). The digital modelling research project has examined the potential of standardised building information models to develop a digital facility model supporting facilities management (FM). The focus of this investigation was on the following areas: The re-usability of standardised building information models (BIM) for FM purposes. The potential of BIM as an information framework acting as integrator for various FM data sources. The extendibility and flexibility of the BIM to cope with business specific data and requirements. Commercial FM software using standardised building information models. The ability to add (organisation-specific) intelligence to the model. A roadmap for Sydney Opera House to adopt BIM for FM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A scoping study' has recently been undertaken to determine the state-of-the-art of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The primary aim of this study was to determine the relationship between telomere length and age in a range of marine invertebrates including abalone (Haliotis spp) oysters (Saccostrea glomerata), spiny lobsters (Sagmariasus verreauxi formerly Jasus verreauxi and Jasus edwardsii) and school prawns (Metapenaeus macleayi). Additionally, this relationship was studied in a vertebrate organism using the freshwater fish Silver perch (Bidyanus bidyanus). Telomere length differences between tissues were also examined in some species such as Saccostrea glomerata, Sagmariasus verreauxi and Bidyanus bidyanus. In some cases cultured specimens of known age were used and this is quoted in the spreadsheets. For other wild-caught specimens where age was not known, size was used as a proxy for age. This may be a broad size class, or be determined by shell size or carapace length depending on the organism. Each spreadsheet contains raw data of telomere length estimates from Terminal Restriction Fragment Assays (TRF) for various individuals of each species including appropriate details such as age or size and tissue. Telomere length estimates are given in base pairs (bp). In most cases replicate experiments were conducted on groups of samples three times but on a small number of occasions only two replicate experiments were conducted. Further description of the samples can be found in final report of FRDC 2007/033. The arithmetic average for each individual (sample ID) across the two or three replicate experiments is also given. Bidyanus bidyanus (SilverPerch) Two sheets are contained within. a) Comparison of telomere length between different tissues (heart, liver and muscle) within the three year old age class - two replicate experiments were conducted. b) Comparison of telomere length between fish of different but known ages (0.25, 1, 2, and 3 years old) in each of three tissues, heart, liver and muscle three replicate experiments were conducted per tissue. Haliotis spp (Abalone species) Three species were tested. H. asinina Telomere length was compared in two age classes-11 month and 18 month old abalone using muscle tissue from the foot. Within gel-variation was also estimated using a single sample run three times on one gel (replicate experiment). H. laevigata x H. rubra hybrids Telomere length was compared in three known age classes two, three and four years old using muscle tissue from the foot. H. rubra Telomere length was compared in a range of different sized abalone using muscle tissue from the foot. Shell size is also given for each abalone Saccostrea glomerata Three sheets are contained within the file. a) Samples came from Moreton Bay Queensland in 2007. Telomere length was compared in two tissues (gill and mantle) of oysters in three age groups (1, 3 and 4 years) b) Samples came from Moreton Bay Queensland in 2009. Telomere length was compared in three age classes using DNA from gill tissue only c) Samples came from Wallis Lake, New South Wales. Telomere length was estimated from whole body minus the shell from 1 year old oysters, gill tissue of 3 age classes (1.5 years, 3 and 4 years), mantle tissue of two age classes (3 and 4 years). Sagmariasus verreauxi (formerly Jasus verreauxi) Telomere length was estimated from abdomen tissue of puerulus, gill and muscle tissue of 3 year old, large and very large size classes of lobsters. Jasus edwardsii Telomere length was measured in two size classes of lobsters- adults of varying sizes using muscle tissue and puerulus using tissues from the abdomen minus the exoskeleton. Metapenaeus macleayi Telomere length was measured in three size classes of school prawns adults. Muscle tissue was used, minus the exoskeleton.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Sydney Opera House Facilities Management Exemplar Project (SOH FM Exemplar Project) aims to develop innovative research on facility management (FM) with the focus on asset maintenance. The project utilises the Sydney Opera House (SOH), one of most unique buildings in Australia, to research and create innovative FM strategies and models that will have a direct beneficial role for the Australian facilities management industry as well as the economy as a whole. The procurement, benchmarking and digitisation are crucial in improving the performance of FM. The procurement develops strategic plan and deployment framework enabling products, services, etc. meet objectives of performance, economic, environment, etc. Benchmarking is a technology used to compare practice and assess performance against the competitors recognised as industry leaders who achieve most successful activities in the field. Digitisation develops digitized FM modelling that facilitates the integration and automation of facility management. The project carries out the research on all the three areas as well as the relationship between them. It aims to develop an integrated approach for the improvement of FM performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper provides an overview of the Australian Governments Facilities Management (FM) Action Agenda as announced in 2004 as a key policy plank designed to facilitate growth of the FM industry. The resulting consultation with industry leaders has seen the criterion and release in April 2005 of the FM Action Agendas strategic plan entitled Managing the Built Environment. This framework, representing a collaboration between the Australian Government, public and private sector stakeholders and Facility Management Association of Australia (FMA Australia) and other allied bodies, sets out to achieve the vision of a more productive and sustainable built environment through improved innovation, education and standards. The 36 month implementation phase is now underway and will take a multi-pronged approach to enhancing the recognition of the FM industry and removing impediments to its growth with a 20 point action plan across the following platforms: Innovation Improved appreciation of facility life cycles, and greater understanding of the key drivers of workplace productivity, and the improved application of information technology. Education and Training Improved access to dedicated FM education and training opportunities and creation clear career pathways into the profession. Regulatory Reform Explore opportunities to harmonise cross jurisdictional regulatory compliance requirements that have an efficiency impact on FM. Sustainability Improved utilization of existing knowledge and the development of tools and opportunities to improve the environmental performance of facilities. Additional information is available at www.fma.com.au

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The productivity of a fisheries resource can be quantified from estimates of recruitment, individual growth and natural and fisheries-related mortality, assuming the spatial extent of the resource has been quantified and there is minimal immigration or emigration. The sustainability of a fisheries resource is facilitated by management controls such as minimum and maximum size limits and total allowable catch. Minimum size limits are often set to allow individuals the opportunity to reproduce at least once before the chance of capture. Total allowable catches are a proportion of the population biomass, which is estimated based on known reproduction, recruitment, mortality and growth rates. In some fisheries, however, management actions are put in place without quantification of the resource through the stock assessment process. This occurs because species-specific information, for example individual growth, may not be available. In these circumstances, management actions need to be precautionary to protect against future resource collapse, but this often means that the resource is lightly exploited. Consequently, the productivity of the resource is not fully realised. Australias most valuable fisheries are invertebrate fisheries (Australian Department of Agriculture Fisheries and Forestry, 2008). For example, Australian fisheries (i.e. excluding aquaculture) production of crustaceans (largely prawns, rock lobster and crab) was 41,000 tonnes in 2006/7, worth $778 million. Production from mollusc (largely abalone, scallops, oysters and squid) fisheries was 39,000 tonnes, worth $502 million. Together, in 2006/7 crustacean and mollusc fisheries represented 58% of the total value of Australian wild fisheries production. Sustainable management of Australias invertebrate fisheries is frustrated by the lack of data on species-specific growth rates. This project investigated a new method to estimate age, and hence individual growth rates, in invertebrate fisheries species. The principle behind the new aging method was that telomeres (i.e. DNA end-caps of chromosomes) get shorter as an individual gets older. We studied commercial crustacean and molluscan species. A vertebrate fish species (silver perch, Bidyanus bidyanus) was used as a control to standardise our work against the literature. We found a clear relationship between telomere length and shell size for temperate abalone (Haliotis rubra). Further research is recommended before the method can be implemented to assist management of wildharvested abalone populations. Age needs to be substituted for shell size in the relationship and it needs to be studied for abalone from several regions. This project showed that telomere length declined with increasing age in Sydney rock oysters (Saccostrea glomerata) and was affected by regional variation. A relationship was not apparent between telomere length and age (or size as a surrogate for age) for crustacean species (school prawns, Metapenaeus macleayi; eastern rock lobster, Sagmariasus verreauxi; southern rock lobster, Jasus edwardsii; and spanner crabs, Ranina ranina). For school prawns, there was no difference between telomere length in males and females. Further research is recommended, however, as telomeric DNA from crustaceans was difficult to analyse using the terminal restriction fragment (TRF) assay. Telomere lengths of spanner crabs and lobsters were at the upper limit of resolution of the assay used and results were affected by degradation and possible contamination of telomeric DNA. It is possible that telomere length is an indicator of remaining lifespan in molluscan and crustacean individuals, as suggested for some vertebrate species (e.g. Monaghan, 2010). Among abalone of similar shell size and among lobster pueruli, there was evidence of individuals having significantly longer or shorter telomeres than the group average. At a population level, this may be a surrogate for estimates of future natural mortality, which may have usefulness in the management of those populations. The method used to assay telomere length (terminal restriction fragment assay) performed adequately for most species, but it was too expensive and time-consuming to be considered a useful tool for gathering information for fisheries management. Research on alternative methods is strongly recommended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Suite plus de deux annes de recherches, le projet de lAmerican Bar Association (ABA) concernant la juridiction du cyberespace, Achieving Legal and Business Order in Cyberspace: A Report on Global Jurisdiction Issues Created by the Internet, a t publi dans ldition du mois daot 2000 de la revue juridique The Business Lawyer. Ce rapport poursuivait deux objectifs distincts: Tout dabord, effectuer une analyse globale des complexits potentielles entourant les conflits juridictionnels dcoulant du commerce en ligne. Ensuite, laborer une liste exhaustive des solutions pouvant tre utilises pour rsoudre de tels conflits. Le prsent article se veut un rsum concis et accessible des trois grandes sections du Cyberspace Jurisdiction Report: (1) les solutions proposes aux problmes juridictionnels dcoulant des conflits rsultant du commerce lectronique; (2) afin dappuyer les solutions proposes: lutilisation dexemples doccasions o la technologie a dj, par le pass, caus la mtamorphose de certains paradigmes juridictionnels; et (3) afin dappuyer les solutions proposes: lutilisation dun contexte doctrinal."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Il lavoro tratta lapplicazione di un progetto di Certificazione del Sistema di Gestione della Qualit di uninnovativa linea di Business nel settore delle macchine per il confezionamento delle bevande. Questo lavoro stato preparato durante un periodo di Stage della durata di sei mesi effettuato presso SACMI IMOLA S.C. (Imola, BOLOGNA) a seguito della necessit, riscontrata dal management, di allineare il sistema gestione qualit della nuova linea di business alla normativa ISO 9001:2008, come per le altre linee di business dellazienda. Tutto questo mediante limplementazione di un sistema di Business Process Management (BPM) e di tutti i sistemi informatici ad esso collegati. La tesi si struttura in tre parti. Nella prima parte, attraverso unindagine della letteratura di riferimento, si sono indagati levoluzione storica, la struttura attuale e i possibili scenari evolutivi inerenti il concetto di qualit, il sistema gestione qualit e la normativa di riferimento. La seconda parte dedicata allapprofondimento delle tematiche del BPM, i cui principi hanno guidato lintervento effettuato. La ricerca stata condotta allo scopo di evidenziare le radici e gli elementi innovativi che contraddistinguono questo approccio di management, descrivere gli aspetti che ne hanno determinato la diffusione e levoluzione ed evidenziare, inoltre, il collegamento tra lapproccio per processi che sta alla base di questa filosofia di management e lo stesso approccio previsto nella normativa ISO 9001:2008 e, pi specificatamente nella cosiddetta Vision 2000. Tale sezione si conclude con la formalizzazione delle metodologia e degli strumenti effettivamente utilizzati per la gestione del progetto. La terza ed ultima parte del lavoro consiste nella descrizione del caso. Vengono presentate le varie fasi dellimplementazione del progetto, dallanalisi dellattuale situazione alla costruzione dellinfrastruttura informatica per lattuazione del BPM ottenuta attraverso lapplicazione dei criteri di progettazione trattati dalla letteratura di riferimento, passando per la mappatura dei processi attualmente in vigore e per lanalisi delle performance del processo attuale, misurate attraverso indicatori sviluppati ad hoc. Il lavoro arricchito dallanalisi di uninnovativa metodologia per la creazione di un sistema di gestione integrato delle certificazioni (ISO 9001, ISO 14001, OHSAS 18001) fondato sullinfrastruttura informatica creata.