853 resultados para Project 2002-035-C : Linking Best-Value Procurement Assessment to Outcome Performance Indicators


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – This study examines the nature of consumers’ perceptions of the value they derive from the everyday experiential consumption of mobile phones and how mobile marketing (m-marketing) can potentially enhance these value perceptions. Methodology – Q methodology is used to examine how consumers’ subjective perceptions and opinions are shared at a collective level. Forty participants undertook two Q sorts and the data was analysed using PQ-method. Findings – The first Q sort identified three profiles of perceived value: the Mobile Pragmatists, the Mobile Connectors and the Mobile Revellers. The second Q sort identified two profiles of perceived value of m-marketing: one emerging from the shared opinions of the Mobile Pragmatists and the Mobile Connectors, and the second from the Mobile Revellers. Implications/limitations – The findings show how consumers can be segmented based on their contextualised perceived value of consuming mobile phones and how the potential for m-marketing is perceived in ways that can enhance these value perceptions. Limitations relate to deriving statements for the Q sorts and the generalisability of the results. Practical implications – The findings highlight ways to tailor m-marketing strategies to complement consumers’ perceptions of the value offered through their mobile phones. Originality/value of paper – The study contributes to the literature through using Q methodology to examine two subjective areas of consumer behaviour, experiential consumption and consumer perceived value. Keywords mobile phones, mobile phone marketing, consumer perceived value, Q methodology, experiential consumption Classification Research paper

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Motorcycle trauma is a serious road safety issue in Queensland and throughout Australia. In 2009, Queensland Transport (later Transport and Main Roads or TMR) appointed CARRS-Q to provide a three-year program of Road Safety Research Services for Motorcycle Rider Safety. Funding for this research originated from the Motor Accident Insurance Commission. This program of research was undertaken to produce knowledge to assist TMR to improve motorcycle safety by further strengthening the licensing and training system to make learner riders safer by developing a pre-learner package (Deliverable 1), and by evaluating the Q-Ride CAP program to ensure that it is maximally effective and contributes to the best possible training for new riders (Deliverable 2), which is the focus of this report. Deliverable 3 of the program identified potential new licensing components that will reduce the incidence of risky riding and improve higher-order cognitive skills in new riders. This report provides a summary of Deliverables 2.1 through to 2.4.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Understanding the response of humid mid-latitude forests to changes in precipitation, temperature, nutrient cycling, and disturbance is critical to improving our predictive understanding of changes in the surface-subsurface energy balance due to climate change. Mechanistic understanding of the effects of long-term and transient moisture conditions are needed to quantify
linkages between changing redox conditions, microbial activity, and soil mineral and nutrient interactions on C cycling and greenhouse gas releases. To illuminate relationships between the soil chemistry, microbial communities and organic C we established transects across hydraulic and topographic gradients in a small watershed with transient moisture conditions. Valley bottoms tend to be more frequently saturated than ridge tops and side slopes which generally are only saturated when shallow storm flow zones are active. Fifty shallow (~36”) soil cores were collected during timeframes representative of low CO2, soil winter conditions and high CO2, soil summer conditions. Cores were subdivided into 240 samples based on pedology and analyses of the geochemical (moisture content, metals, pH, Fe species, N, C, CEC, AEC) and microbial (16S rRNA gene
amplification with Illumina MiSeq sequencing) characteristics were conducted and correlated to watershed terrain and hydrology. To associate microbial metabolic activity with greenhouse gas emissions we installed 17 soil gas probes, collected gas samples for 16 months and analyzed them for CO2 and other fixed and greenhouse gasses. Parallel to the experimental efforts our data is being used to support hydrobiogeochemical process modeling by coupling the Community Land Model (CLM) with a subsurface process model (PFLOTRAN) to simulate processes and interactions from the molecular to watershed scales. Including above ground processes (biogeophysics, hydrology, and vegetation dynamics), CLM provides mechanistic water, energy, and organic matter inputs to the surface/subsurface models, in which coupled biogeochemical reaction
networks are used to improve the representation of below-ground processes. Preliminary results suggest that inclusion of above ground processes from CLM greatly improves the prediction of moisture response and water cycle at the watershed scale.