954 resultados para Preventive maintenance of buildings


Relevância:

100.00% 100.00%

Publicador:

Resumo:

For leased equipment, the lessor carries out the maintenance of the equipment. Usually, the contract of lease specifies the penalty for equipment failures and for repairs not being carried out within specified time limits. This implies that optimal preventive maintenance policies must take these penalty costs into account and properly traded against the cost of preventive maintenance actions. The costs associated with failures are high as unplanned corrective maintenance actions are costly and the resulting penalties due to lease contract terms being violated. The paper develops a model to determine the optimal parameters of a preventive maintenance policy that takes into account all these costs to minimize the total expected cost to the lessor for new item lease. The parameters of the policy are (i) the number of preventive maintenance actions to be carried out over the lease period, (ii) the time instants for such actions, and (iii) the level of action. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Relatório de Estágio para obtenção do grau de Mestre em Engenharia Civil

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In real-world environments it is usually difficult to specify the quality of a preventive maintenance (PM) action precisely. This uncertainty makes it problematic to optimise maintenance policy.-This problem is tackled in this paper by assuming that the-quality of a PM action is a random variable following a probability distribution. Two frequently studied PM models, a failure rate PM model and an age reduction PM model, are investigated. The optimal PM policies are presented and optimised. Numerical examples are also given.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to provide information on wear debris on oil and vibration analysis as predictive maintenance techniques in reducer. Design/methodology/approach - The estate of a reducer is verified by analyzing the vibration and oil conditions of a test rig under well-designed conditions utilizing some predictive variables. Findings - According to the vibration and oil analysis it is found out what it was happening into the reducer without disassembling it. Practical implications - This paper demonstrates the use of oil debris analysis and vibration analysis as a technique that enhances preventive maintenance practices. The paper helps practitioners to utilize these techniques more effectively. Originality/value - This paper gives information about two predictive maintenance techniques with a test rig. © Emerald Group Publishing Limited.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"August 2000."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"15 August 1991."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"9 May 1975."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"10 July 1984."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"14 March 1980"--P. [1].