870 resultados para Post Disaster Road Recovery Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

between mid 2010 and early 2011, Queensland road related infrastructures were devastated by flood and cyclone related natural disasters. Responding to these recent events and in preparing for more regular and intense climate-change induced events in future, the Queensland Government is now reviewing how post-disaster road infrastructure recovery projects are planned and delivered. In particular, there is awareness that rebuilding such infrastructure need sustainable strategies across economic, environmental and social dimensions. A comprehensive sustainability assessment framework for pre and post disaster situations can minimize negative impact on our communities, economy and environment. This research is underway to develop a comprehensive sustainability element frame work for post disaster management in road infrastructures in Queensland, Australia. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of natural disasters. This research can contribute to strategic planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes in Queensland. Within this context, this paper provides an overview of the qualitative mixed-method research approach involving literature reviews and case studies to explore and evaluate a number of sustainability elements with a view to develop operational strategies for disaster recovery road projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Between mid 2010 and early 2013, Queensland road related infrastructures were devastated by flood and cyclone related natural disasters. Responding to these recent events and in preparing for more regular and intense climate-change induced events in future, the Queensland Government is now reviewing how post-disaster road infrastructure recovery projects are planned and delivered. In particular, there is awareness that rebuilding such infrastructure need sustainable strategies across economic, environmental and social dimensions. A comprehensive sustainability assessment framework for pre and post disaster situations can minimize negative impact on our communities, economy and environment. This research is underway to develop a comprehensive sustainability element frame work for post disaster management in road infrastructures in Queensland, Australia. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of natural disasters. This research can contribute to strategic planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes in Queensland. Within this context, this paper provides an overview of the qualitative mixed-method research approach involving literature reviews and case studies to explore and evaluate a number of sustainability elements with a view to develop operational strategies for disaster recovery road projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Post-disaster housing reconstruction projects face several challenges. Resources and material supplies are often scarce; several and different types of organizations are involved, while projects must be completed as quickly as possible to foster recovery. Within this context, the chapter aims to increase the understanding of relief supply chain design in reconstruction. In addition, the chapter is introducing a community based and beneficiary perspective to relief supply chains by evaluating the implications of local components for supply chain design in reconstruction. This is achieved through the means of secondary data analysis based on the evaluation reports of two major housing reconstruction projects that took place in Europe the last decade. A comparative analysis of the organizational designs of these projects highlights the ways in which users can be involved. The performance of reconstruction supply chains seems to depend to a large extent on the way beneficiaries are integrated in supply chain design impacting positively on the effectiveness of reconstruction supply chains.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The extant literature suggests that community participation is an important ingredient for the successful delivery of post-disaster housing reconstruction projects. Even though policy-makers, international funding bodies and non-governmental organisations broadly appreciate the value of community participation, post-disaster reconstruction practices systematically fail to follow, or align with, existing policy statements. Research into past experiences has led many authors to argue that post-disaster reconstruction is the least successful physically visible arena of international cooperation. Why is the principle of community participation not evident in the veracity of reconstructions already carried out on the ground? This paper discusses and develops the concepts of, and challenges to, community participation and the subsequent negative and positive effects on post-disaster reconstruction projects outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The extant literature suggests that community participation is an important ingredient for the successful delivery of post-disaster housing reconstruction projects. Even though policy-makers, international funding bodies and non-governmental organisations broadly appreciate the value of community participation, post-disaster reconstruction practices systematically fail to follow, or align with, existing policy statements. Research into past experiences has led many authors to argue that post-disaster reconstruction is the least successful physically visible arena of international cooperation. Why is the principle of community participation not evident in the veracity of reconstructions already carried out on the ground? This paper discusses and develops the concepts of, and challenges to, community participation and the subsequent negative and positive effects on post-disaster reconstruction projects outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As natural disasters continue to escalate in frequency and magnitude, NGOs are faced with numerous barriers as they attempt to implement post-disaster reconstruction (PDR) projects. In many cases, a lack of competency in key areas leads to a reduction in overall project success. This paper utilizes the competency-based framework of von Meding et al. (2010) as the starting point of its inquiry. In this context, a leading NGO responsible for the implementation of reconstruction and rehabilitation in Sri Lanka following the Asian Tsunami has been investigated in depth using a causal mapping interview procedure with key project staff. The combined barriers within this organization’s PDR operations have been identified and measured and solutions articulated. The study found that within this organization key objectives were to achieve the ‘build back better’ mantra and to effectively plan interventions in advance. The primary barriers to successful reconstruction were identified as the high turnover rate of humanitarian staff and a poor level of communication and co-operation between agencies. An essential strategy employed to combat these barriers is the consideration of staff capabilities, which links us back to competence-based theory. The results are highly valuable in the context of an ongoing wider research study on competence within humanitarian organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When a community already torn by an event such as a prolonged war, is then hit by a natural disaster, the negative impact of this subsequent disaster in the longer term can be extremely devastating. Natural disasters further damage already destabilised and demoralised communities, making it much harder for them to be resilient and recover. Communities often face enormous challenges during the immediate recovery and the subsequent long term reconstruction periods, mainly due to the lack of a viable community involvement process. In post-war settings, affected communities, including those internally displaced, are often conceived as being completely disabled and are hardly ever consulted when reconstruction projects are being instigated. This lack of community involvement often leads to poor project planning, decreased community support, and an unsustainable completed project. The impact of war, coupled with the tensions created by the uninhabitable and poor housing provision, often hinders the affected residents from integrating permanently into their home communities. This paper outlines a number of fundamental factors that act as barriers to community participation related to natural disasters in post-war settings. The paper is based on a statistical analysis of, and findings from, a questionnaire survey administered in early 2012 in Afghanistan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cyclone Yasi struck the Cassowary Coast of Northern Queensland, Australia, in the early hours of February 3, 2011, destroying many homes and property, including the destruction of the Cardwell and district historical society’s premises. With their own homes flattened, many residents were forced to live in mobile accommodation, with extended family, or leave the area altogether. The historical society members seemed, however, particularly devastated by their flattened foreshore museum and loss of their precious collection of material. A call for assistance was made through the Oral History Association of Australia’s Queensland branch (OHAA Qld), which along with a Queensland University of Technology (QUT) research team sponsored a trip to best plan how they could start to pick up the pieces to rebuild the museum. This chapter highlights the need for communities to gather, preserve and present their own stories, in a way that is sustainable and meaningful to them – whether that be because of a disaster, or as they go about life in their contemporary communities – the key being that good advice, professional support and embedded evaluation practices at crucial moments along the way can be critically important.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In a post-disaster environment, housing reconstruction projects frequently face enormous difficulties due to the various, often apparently ill-considered, internal and external factors. Non-Governmental Organisations (NGOs) operating in post-disaster settings such as in Afghanistan continue to face blame over the failure of reconstruction projects, and worse, they are sometimes even viewed as being corrupt entities. While it is not always possible for NGOs to eliminate or reduce the impact of factors that are outside their control, they certainly can increase the chances of project success by placing considerable emphasis on working more effectively with the affected communities. To achieve maximum community participation in reconstruction projects , this research develops a specific logical framework to guide the process of community participation in post-disaster housing reconstruction in Afghanistan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During post-disaster recovery, an infrastructure system may be subject to a number of disturbances originating from several other interdependent infrastructures. These disturbances might result in a series of system failures, thereby having immediate impact on societal living conditions. The inability to detect signs of disturbance from one infrastructure during recovery might cause significant disruptive effects on other infrastructure via the interconnection that exist among them. In such circumstances, it clearly appears that critical infrastructures' interdependencies affect the recovery of each individual infrastructure, as well as those of other interdependent infrastructure systems. This is why infrastructure resilience needs to be improved in function of those interdependencies, particularly during the recovery period to avoid the occurrence of a ‘disaster of disaster’ scenario. Viewed from this perspective, resilience is achieved through an inter-organisational collaboration between the different organisations involved in the reconstruction of interdependent infrastructure systems. This paper suggests that to some extent, the existing degree of interconnectedness between these infrastructure systems can also be found in their resilience ability during post-disaster recovery. For instance, without a resilient energy system, a large-scale power outage could affect simultaneously all the interdependent infrastructures after a disaster. Thus, breaking down the silos of resilience would be the first step in minimizing the risks of disaster failures from one infrastructure to cascade or escalate to other interconnected systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The importance of developing effective disaster management strategies has significantly grown as the world continues to be confronted with unprecedented disastrous events. Factors such as climate instability, recent urbanization along with rapid population growth in many cities around the world have unwittingly exacerbated the risks of potential disasters, leaving a large number of people and infrastructure exposed to new forms of threats from natural disasters such as flooding, cyclones, and earthquakes. With disasters on the rise, effective recovery planning of the built environment is becoming imperative as it is not only closely related to the well-being and essential functioning of society, but it also requires significant financial commitment. In the built environment context, post-disaster reconstruction focuses essentially on the repair and reconstruction of physical infrastructures. The reconstruction and rehabilitation efforts are generally performed in the form of collaborative partnerships that involve multiple organisations, enabling the restoration of interdependencies that exist between infrastructure systems such as energy, water (including wastewater), transport, and telecommunication systems. These interdependencies are major determinants of vulnerabilities and risks encountered by critical infrastructures and therefore have significant implications for post-disaster recovery. When disrupted by natural disasters, such interdependencies have the potential to promote the propagation of failures between critical infrastructures at various levels, and thus can have dire consequences on reconstruction activities. This paper outlines the results of a pilot study on how elements of infrastructure interdependencies have the potential to impede the post-disaster recovery effort. Using a set of unstructured interview questionnaires, plausible arguments provided by seven respondents revealed that during post-disaster recovery, critical infrastructures are mutually dependent on each other’s uninterrupted availability, both physically and through a host of information and communication technologies. Major disruption to their physical and cyber interdependencies could lead to cascading failures, which could delay the recovery effort. Thus, the existing interrelationship between critical infrastructures requires that the entire interconnected network be considered when managing reconstruction activities during the post-disaster recovery period.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thèse numérisée par la Direction des bibliothèques de l'Université de Montréal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Un document accompagne la thèse et est disponible pour consultation au Centre de conservation des bibliothèques de l'Université de Montréal (http://www.bib.umontreal.ca/conservation/).