951 resultados para Port Hamilton


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bill of Landing (copy) for packaged goods received at Port Hamilton, Oct. 14, 1839.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bill of landing (copy) for tea chest and boxes received at Port Hamilton, Sept. 14, 1840.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article deals with the encounters between a traditional Korean rural and island population and western military forces when the British navy occupied Geomundo, an archipelago known to them as Port Hamilton, for 22 months between 1885 and 1887. The paper first outlines the sometimes painful process of East Asian countries being opened up to trade and outside influences in the 19th century, a process sometimes urged upon them by naval weapons in this era of gunboat diplomacy. This provides the setting for the Port Hamilton Affair itself when in preparation for possible war with Russia, a British naval squadron steamed into Port Hamilton and took it without reference to the local people or their national government. After brief reference to the political consequences of this action, the focus is then on what the records from the occupation and earlier investigations by the British, who had long coveted the islands’ strategic harbour, reveal about the life of the islanders. The article considers both their traditional life, from a time rather before western travel accounts were written about the Korean mainland, and how the islanders fared under the British.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Survey map of the Second Welland Canal created by the Welland Canal Company showing the areas in and around Port Colborne. Identified structures associated with the Canal include Lighthouse, Pier Light, Old Lock House, Collector's Office, Harbour Master's House, Canal Boundary, Back Ditch, Reserved Back Ditch, Basin, Light-Keeper's House and Ferry Recess. The surveyors' measurements and notes can be seen in red and black ink and pencil. Local area landmarks and businesses are also identified and include Gordon's Woodyard, Welland Rail Road, Welland Railway Elevator and Proposed Elevator, W.R.R. Flour Shed, Roman Catholic Church, School House, Sandhills, Lake Erie, and the High Water Mark. Streets running parallel to Canal include King St., West St., East St., Queen St., Hamilton St., and the Road Allowance are labelled. Streets running perpendicular to Canal include Kent St., Victoria St., Adelaide St., SugarLoaf St., George St., Alexandrina St., William St., Fort Erie St., Lake Rd., and New Road to Dutch Settlement are also labelled. Property owners and leasers as well as buildings on lots are also idenitified and noted as follows: Adams estate, J. Towhig, J.C. Kerr, Mrs. Hill, S. Cooke, Mrs. Yocum, W.T. Cooke, P. Wintermute, J. Shickluna, William Cooke, J. McChesney, John Beatty, W. Robertson, John Gordon, T. Armstrong, John Harper, George Keefer, Estate of James Black, Thomas Park, N. Higgins, S. Hopkins, and L.G. Cartier. Map of the Village of Port Colborne. Being Lot No. 27 and part of Lot No. 28 in the 1st Con. Township of HUMBERSTONE. Scale 2 Chs. per Inch. land shaded in RED Owned by DEPT. Do. Do. BLUE Sold to the COUNTY of WELLAND

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Letter which S.D. Woodruff writes to William Hamilton Merritt about the length of the railway from Port Dalhousie to the Great Western Railway. He says that the distance is 6 miles. From Port Dalhousie to St. Catharines there will 4 miles of rail required for a single track, Mar. 13, 1854.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Letter to S.D. Woodruff from William Hamilton Merritt at the Legislative Assembly in Quebec. Mr. Merritt asks who has investments in the town and he says “we will get the road through to Port Colborne in due time (3 pages, handwritten), Apr. 19, 1855.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Letter from William Hamilton Merritt to S.D. Woodruff asking to see the report, n.d.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Davidis Hamiltoni ... Tractatus de febre miliari ..., p. [39]-176, con port. propia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An alternative approach to port decoupling and matching of arrays with tightly coupled elements is proposed. The method is based on the inherent decoupling effect obtained by feeding the orthogonal eigenmodes of the array. For this purpose, a modal feed network is connected to the array. The decoupled external ports of the feed network may then be matched independently by using conventional matching circuits. Such a system may be used in digital beam forming applications with good signal-to-noise performance. The theory is applicable to arrays with an arbitrary number of elements, but implementation is only practical for smaller arrays. The principle is illustrated by means of two examples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hamilton (2001) makes a number of comments on our paper (Harding and Pagan, 2002b). The objectives of this rejoinder are, firstly, to note the areas in which we agree; secondly, to define with greater clarity the areas in which we disagree; and, thirdly, to point to other papers, including a longer version of this response, where we have dealt with some of the issues that he raises. The core of our debate with him is whether one should use an algorithm with a specified set of rules for determining the turning points in economic activity or whether one should use a parametric model that features latent states. Hamilton begins his criticism by stating that there is a philosophical distinction between the two methods for dating cycles and concludes that the method we use “leaves vague and intuitive exactly what this algorithm is intended to measure”. Nothing is further from the truth. When seeking ways to decide on whether a turning point has occurred it is always useful to ask the question, what is a recession? Common usage suggests that it is a decline in the level of economic activity that lasts for some time. For this reason it has become standard to describe a recession as a decline in GDP that lasts for more than two quarters. Finding periods in which quarterly GDP declined for two periods is exactly what our approach does. What is vague about this?

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: The quality of stormwater runoff from ports is significant as it can be an important source of pollution to the marine environment. This is also a significant issue for the Port of Brisbane as it is located in an area of high environmental values. Therefore, it is imperative to develop an in-depth understanding of stormwater runoff quality to ensure that appropriate strategies are in place for quality improvement. ---------------- The Port currently has a network of stormwater sample collection points where event based samples together with grab samples are tested for a range of water quality parameters. Whilst this information provides a ‘snapshot’ of the pollutants being washed from the catchment/s, it does not allow for a quantifiable assessment of total contaminant loads being discharged to the waters of Moreton Bay. It also does not represent pollutant build-up and wash-off from the different land uses across a broader range of rainfall events which might be expected. As such, it is difficult to relate stormwater quality to different pollutant sources within the Port environment. ----------------- Consequently, this would make the source tracking of pollutants to receiving waters extremely difficult and in turn the ability to implement appropriate mitigation measures. Also, without this detailed understanding, the efficacy of the various stormwater quality mitigation measures implemented cannot be determined with certainty. --------------- Current knowledge on port stormwater runoff quality Currently, little knowledge exists with regards to the pollutant generation capacity specific to port land uses as these do not necessarily compare well with conventional urban industrial or commercial land use due to the specific nature of port activities such as inter-modal operations and cargo management. Furthermore, traffic characteristics in a port area are different to a conventional urban area. Consequently, as data inputs based on an industrial and commercial land uses for modelling purposes is questionable. ------------------ A comprehensive review of published research failed to locate any investigations undertaken with regards to pollutant build-up and wash-off for port specific land uses. Furthermore, there is very limited information made available by various ports worldwide about the pollution generation potential of their facilities. Published work in this area has essentially focussed on the water quality or environmental values in the receiving waters such as the downstream bay or estuary. ----------------- The Project: The research project is an outcome of the collaborative Partnership between the Port of Brisbane Corporation (POBC) and Queensland University of Technology (QUT). A key feature of this Partnership is the undertaking of ‘cutting edge’ research to strengthen the environmental custodianship of the Port area. This project aims to develop a port specific stormwater quality model to allow informed decision making in relation to stormwater quality improvement in the context of the increased growth of the Port. --------------- Stage 1 of the research project focussed on the assessment of pollutant build-up and wash-off using rainfall simulation from the current Port of Brisbane facilities with the longer-term objective of contributing to the development of ecological risk mitigation strategies for future expansion scenarios. Investigation of complex processes such as pollutant wash-off using naturally occurring rainfall events has inherent difficulties. These can be overcome using simulated rainfall for the investigations. ----------------- The deliverables for Stage 1 included the following: * Pollutant build-up and wash-off profiles for six primary land uses within the Port of Brisbane to be used for water quality model development. * Recommendations with regards to future stormwater quality monitoring and pollution mitigation measures. The outcomes are expected to deliver the following benefits to the Port of Brisbane: * The availability of Port specific pollutant build-up and wash-off data will enable the implementation of customised stormwater pollution mitigation strategies. * The water quality data collected would form the baseline data for a Port specific water quality model for mitigation and predictive purposes. * To be at the cutting-edge in terms of water quality management and environmental best practice in the context of port infrastructure. ---------------- Conclusions: The important conclusions from the study are: * It confirmed that the Port environment is unique in terms of pollutant characteristics and is not comparable to typical urban land uses. * For most pollutant types, the Port land uses exhibited lower pollutant concentrations when compared to typical urban land uses. * The pollutant characteristics varied across the different land uses and were not consistent in terms of the land use. Hence, the implementation of stereotypical structural water quality improvement devices could be of limited value. * The <150m particle size range was predominant in suspended solids for pollutant build-up as well as wash-off. Therefore, if suspended solids are targeted as the surrogate parameter for water quality improvement, this specific particle size range needs to be removed. ------------------- Recommendations: Based on the study results the following preliminary recommendations are made: * Due to the appreciable variation in pollutant characteristics for different port land uses, any water quality monitoring stations should preferably be located such that source areas can be easily identified. * The study results having identified significant pollutants for the different land uses should enable the development of a more customised water quality monitoring and testing regime targeting the critical pollutants. * A ‘one size fits all’ approach may not be appropriate for the different port land uses due to the varying pollutant characteristics. As such, pollution mitigation will need to be specifically tailored to suit the specific land use. * Any structural measures implemented for pollution mitigation to be effective should have the capability to remove suspended solids of size <150m. * Based on the results presented and the particularly the fact that the Port land uses cannot be compared to conventional urban land uses in relation to pollutant generation, consideration should be given to the development of a port specific water quality model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: The quality of stormwater runoff from ports is significant as it can be an important source of pollution to the marine environment. This is also a significant issue for the Port of Brisbane as it is located in an area of high environmental values. Therefore, it is imperative to develop an in-depth understanding of stormwater runoff quality to ensure that appropriate strategies are in place for quality improvement, where necessary. To this end, the Port of Brisbane Corporation aimed to develop a port specific stormwater model for the Fisherman Islands facility. The need has to be considered in the context of the proposed future developments of the Port area. ----------------- The Project: The research project is an outcome of the collaborative Partnership between the Port of Brisbane Corporation (POBC) and Queensland University of Technology (QUT). A key feature of this Partnership is that it seeks to undertake research to assist the Port in strengthening the environmental custodianship of the Port area through ‘cutting edge’ research and its translation into practical application. ------------------ The project was separated into two stages. The first stage developed a quantitative understanding of the generation potential of pollutant loads in the existing land uses. This knowledge was then used as input for the stormwater quality model developed in the subsequent stage. The aim is to expand this model across the yet to be developed port expansion area. This is in order to predict pollutant loads associated with stormwater flows from this area with the longer term objective of contributing to the development of ecological risk mitigation strategies for future expansion scenarios. ----------------- Study approach: Stage 1 of the overall study confirmed that Port land uses are unique in terms of the anthropogenic activities occurring on them. This uniqueness in land use results in distinctive stormwater quality characteristics different to other conventional urban land uses. Therefore, it was not scientifically valid to consider the Port as belonging to a single land use category or to consider as being similar to any typical urban land use. The approach adopted in this study was very different to conventional modelling studies where modelling parameters are developed using calibration. The field investigations undertaken in Stage 1 of the overall study helped to create fundamental knowledge on pollutant build-up and wash-off in different Port land uses. This knowledge was then used in computer modelling so that the specific characteristics of pollutant build-up and wash-off can be replicated. This meant that no calibration processes were involved due to the use of measured parameters for build-up and wash-off. ---------------- Conclusions: Stage 2 of the study was primarily undertaken using the SWMM stormwater quality model. It is a physically based model which replicates natural processes as closely as possible. The time step used and catchment variability considered was adequate to accommodate the temporal and spatial variability of input parameters and the parameters used in the modelling reflect the true nature of rainfall-runoff and pollutant processes to the best of currently available knowledge. In this study, the initial loss values adopted for the impervious surfaces are relatively high compared to values noted in research literature. However, given the scientifically valid approach used for the field investigations, it is appropriate to adopt the initial losses derived from this study for future modelling of Port land uses. The relatively high initial losses will reduce the runoff volume generated as well as the frequency of runoff events significantly. Apart from initial losses, most of the other parameters used in SWMM modelling are generic to most modelling studies. Development of parameters for MUSIC model source nodes was one of the primary objectives of this study. MUSIC, uses the mean and standard deviation of pollutant parameters based on a normal distribution. However, based on the values generated in this study, the variation of Event Mean Concentrations (EMCs) for Port land uses within the given investigation period does not fit a normal distribution. This is possibly due to the fact that only one specific location was considered, namely the Port of Brisbane unlike in the case of the MUSIC model where a range of areas with different geographic and climatic conditions were investigated. Consequently, the assumptions used in MUSIC are not totally applicable for the analysis of water quality in Port land uses. Therefore, in using the parameters included in this report for MUSIC modelling, it is important to note that it may result in under or over estimations of annual pollutant loads. It is recommended that the annual pollutant load values given in the report should be used as a guide to assess the accuracy of the modelling outcomes. A step by step guide for using the knowledge generated from this study for MUSIC modelling is given in Table 4.6. ------------------ Recommendations: The following recommendations are provided to further strengthen the cutting edge nature of the work undertaken: * It is important to further validate the approach recommended for stormwater quality modelling at the Port. Validation will require data collection in relation to rainfall, runoff and water quality from the selected Port land uses. Additionally, the recommended modelling approach could be applied to a soon-to-be-developed area to assess ‘before’ and ‘after’ scenarios. * In the modelling study, TSS was adopted as the surrogate parameter for other pollutants. This approach was based on other urban water quality research undertaken at QUT. The validity of this approach should be further assessed for Port land uses. * The adoption of TSS as a surrogate parameter for other pollutants and the confirmation that the <150 m particle size range was predominant in suspended solids for pollutant wash-off gives rise to a number of important considerations. The ability of the existing structural stormwater mitigation measures to remove the <150 m particle size range need to be assessed. The feasibility of introducing source control measures as opposed to end-of-pipe measures for stormwater quality improvement may also need to be considered.