950 resultados para Pontoon-bridges, Military.


Relevância:

80.00% 80.00%

Publicador:

Resumo:

"War Department. Document no. 492. Office of the Chief of Engineers."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within both aesthetic and history fields, civil engineering occupies a privileged place among arts whose manifestations are based on drawing. In this work, Leonardo’s creativity concerned with civil bridges proyects, have been studied. Leonardo designed ten bridges: eight of them intended for military porposes and only two were purely planned for civil functionaly - “Ponte sul corno d’oro”, infolio 66, manuscript L; and “Ponte a due piani”, represented in the Manuscript B at the Institute of France, infolio 23. There can be no doubt about Leonardo’s intentions when he started on designing these two bridges: his genious for creativy focused on providing both singulary and functionaly to the structures: they should be admired and utilized at the same time, a monument for civil society to be used.The work presented here attemps to make an scientist-historical trip along these Leonardo’s bridges, highlighting their technical, geometrical and aesthetic characteristics, as well as emphasizing Leonardo’s human, scientist and artistic nature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Changes in the environment, including increased environmental complexity, require military supply units to employ a more adaptive strategy in order to enhance military agility. We extend the Lumpkin and Dess (1996) model and develop propositions that explore the interrelationships between/amongst entrepreneurial orientation (EO); opportunity recognition, evaluation and exploitation; environmental and organizational factors; and organizational performance. We propose that the innovativeness, proactiveness, and risk-taking dimensions of EO are of primary importance in identifying adaptive solutions and that these relationships are moderated by environmental factors. The autonomy and competitive aggressiveness dimensions of EO are important in implementing solutions as adaptive strategies, especially in a military context, and these relationships are moderated by organizational factors. This chapter extends existing theory developed primarily for the civilian sector to the military. Military organizations are more rigid hierarchical structures, and have different measures of performance. At an applied level, this research provides insights for military commanders that can potentially enhance agility and adaptability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Durability issues of reinforced concrete construction cost millions of dollars in repair or demolition. Identification of the causes of degradation and a prediction of service life based on experience, judgement and local knowledge has limitations in addressing all the associated issues. The objective of this CRC CI research project is to develop a tool that will assist in the interpretation of the symptoms of degradation of concrete structures, estimate residual capacity and recommend cost effective solutions. This report is a documentation of the research undertaken in connection with this project. The primary focus of this research is centred on the case studies provided by Queensland Department of Main Roads (QDMR) and Brisbane City Council (BCC). These organisations are endowed with the responsibility of managing a huge volume of bridge infrastructure in the state of Queensland, Australia. The main issue to be addressed in managing these structures is the deterioration of bridge stock leading to a reduction in service life. Other issues such as political backlash, public inconvenience, approach land acquisitions are crucial but are not within the scope of this project. It is to be noted that deterioration is accentuated by aggressive environments such as salt water, acidic or sodic soils. Carse, 2005, has noted that the road authorities need to invest their first dollars in understanding their local concretes and optimising the durability performance of structures and then look at potential remedial strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The effective management of bridge stock involves making decisions as to when to repair, remedy, or do nothing, taking into account the financial and service life implications. Such decisions require a reliable diagnosis as to the cause of distress and an understanding of the likely future degradation. Such diagnoses are based on a combination of visual inspections, laboratory tests on samples and expert opinions. In addition, the choice of appropriate laboratory tests requires an understanding of the degradation mechanisms involved. Under these circumstances, the use of expert systems or evaluation tools developed from “realtime” case studies provides a promising solution in the absence of expert knowledge. This paper addresses the issues in bridge infrastructure management in Queensland, Australia. Bridges affected by alkali silica reaction and chloride induced corrosion have been investigated and the results presented using a mind mapping tool. The analysis highights that several levels of rules are required to assess the mechanism causing distress. The systematic development of a rule based approach is presented. An example of this application to a case study bridge has been used to demonstrate that preliminary results are satisfactory.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are about 2500 bridges in Queensland, Australia. Majority of these structures require significant repairs around the halfway mark of their design life with probably 1% or less reaching a 100 year design life. (Carse, 2005). This is due to the fact that bridges constructed in aggressive environments such as the coastal regions experience accelerated deterioration. As a result, maintaining the service delivery of these assets has become one of the important issues for the Queensland Department of Main Roads (QDMR).