616 resultados para PPP


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public Private Partnership (PPP) is a well established methodology for procuring public works projects. By incorporating the private sector’s expertise, efficiency, innovation, business sense, risk sharing, financing etc. into public works projects, the quality of public services and facilities can be uplifted. Like many jurisdictions, Hong Kong is also keen to take aboard this methodology which is so familiar but yet so distant. Although they have been one of the first jurisdictions to utilise the private sector in public works projects, their comfortable financial reserves has meant that there has been no urge to push the movement until recently. PPP has become increasingly popular amongst governments. The Hong Kong Special Administrative Region (HKSAR) government is no exception. Some of the more active works departments have commissioned studies to investigate the best ways to deliver these projects, others have even trialed the method themselves. The efficiency Unit of the HKSAR government has also become an active arm in conducting research in this area. Although so, the information that is currently available is still very broad. Building from their works there is a need to develop a best practice framework for implementing PPP projects in Hong Kong by incorporating international experiences. To develop a best practice framework will require thorough investigation into the benefits, difficulties and critical success factor of PPP. PPP should also be compared with other procurement methods. In order to do so it is important to clearly understand the local situation by an analysis of projects conducted to date. Lessons learnt can further be derived from other countries and incorporated to those derived locally. Finally the best conditions in terms of project nature, complexity, types, and scales for adopting PPP should be derived. The aim and objectives of this study were achieved via a comprehensive literature review, in-depth case analyses, interview survey with experts from both Hong Kong and overseas, and finally a large scale data collection was conducted via a questionnaire survey with PPP practitioners. These findings were further triangulated before they were used as the basis to form the best practice framework presented in this thesis. The framework was then further validated by PPP experts to ensure it is comprehensive, objective, reliable and practical. This study has presented a methodology that can be adopted for future studies. It has also updated our knowledge on the development trends of PPP as well as opened up the experiences of other jurisdictions. The findings have shown that the local industry is familiar with “what” should be done in PPP projects but they are unsure of “how” these goals can be achieved. This framework has allowed this further knowledge to be delivered to PPP practitioners. As a result, the development of this framework can help to resolve the current economic crisis by encouraging more developments and business opportunities for the private sector. In addition, the correct projects can be delivered by PPP, the advantages of PPP can be maximised, and the general public can benefit from the private sector’s participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose : The Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) is an international leading commercial hub particularly in Asia. In order to keep up its reputation a number of large public works projects have been considered. Public Private Partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The findings presented in this paper will specifically consider whether PPPs should be used to procure public works projects in Hong Kong by studying the attractive and negative factors for adopting PPP. Design/methodology/approach : As part of this study a questionnaire survey was conducted with industrial practitioners. The respondents were requested to rank the importance of fifteen attractive factors and thirteen negative factors for adopting PPP. Findings : The results found that in general the top attractive factors ranked by respondents from Hong Kong were efficiency related, these included (1) ‘Provide an integrated solution (for public infrastructure / services)’; (2) ‘Facilitate creative and innovative approaches’; and (3) ‘Solve the problem of public sector budget restraint’. It was found that Australian respondents also shared similar findings to those in Hong Kong, but the United Kingdom respondents showed a higher priority to those economic driven attractive factors. Also, the ranking of the attractive and negative factors for adopting PPP showed that on average the attractive factors were scored higher than the negative factors. Originality/value : The results of this research have enabled a comparison of the attractive and negative factors for adopting PPP between three administrative systems. These findings have confirmed that PPP is a suitable means to procure large public projects which are believed to be useful and interesting to PPP researchers and practitioners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PPP is a general term covering all contracted relationships between the public and private sectors to produce a public asset or to deliver a public service. Its major advantage lies in utilising resources from the private sector to alleviate some of the financial burdens of the government. The Asian financial turmoil in the late 1990s has imposed enormous pressure on the budget of the Hong Kong Special Administrative Region (HKSAR) Government. With a continuous outcry for better public services due to the rapid development of Hong Kong, alternative financing models need to be sought to ensure sustainability. Hong Kong has the advantage of being the international gateway to Mainland China, and with this benefit has attracted overseas enterprises to base their offices in Hong Kong for the Asian market. Obviously the private sector has much to contribute. The HKSAR Government has realised the benefits of using PPP in Hong Kong as well as the success achieved overseas. But a more thorough research is needed to develop the most suitable practice of PPP in terms of project nature, project complexity, project type and project scale under which PPP is most appropriate for Hong Kong. This paper provides an initial report of a research project being funded by the Research Grants Council (RGC) of the HKSAR. The project aims to evaluate the benefits and risks of PPP adopted in Australia and the United Kingdom, and from these previous experiences to develop a best practice framework for implementing PPP in Hong Kong. It firstly reports on the status of PPP development trend and the hands-on experiences which have been drawn in these countries. Qualitative and quantitative research methods applied in conducting the research are discussed. The likely impacts of the study are highlighted. It is believed that the construction industry and the government would benefit a lot as a result of this study, and further procurement and project financing options would be opened up for delivering better future public service.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The development of toll roads in Indonesia started around 1978. Initially, the management and development of toll roads sat directly under the Government of Indonesia (GoI) being undertaken through PT JasaMarga, a state owned enterprise specifically established to provide toll roads. Due to the slow growth and low capability of toll roads to fulfil infrastructure needs in the first ten years of operation (only 2.688kms/year), GoI changed its strategy in 1989 to one of using private sector participation for roads delivery through a Public Private Partnership (PPP) scheme. In this latter period, PT JasaMarga had two roles, both as regulator on behalf of the private sector as well as being the operator. However, from 1989 to 2004 the growth rate of toll roads actually decreased further to 2.300kms/year. Facing this challenge of low growth rate of toll roads, in 2004GoI changed the toll road management system and the role of regulator was returned to the Government through the establishment of the Toll Road Regulatory Agency (BPJT). GoI also amended the institutional framework to strengthen the toll road management system. Despite the introduction of this new institutional framework, the growth of toll roads still showed insignificant change. This problem in toll road development has generated an urgent need for research into this issue. The aim of the research is to understand the performance of the new institutional framework in enhancing PPP procured toll road development. The methodology of the research was to undertake a questionnaire survey distributed to private sector respondents involved in toll road development. The results of this study show that there are several problems inherent in the institutional framework, but the most significant problem comes from the uncertainty of the function of the strategic executive body in the land expropriation process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Precise satellite orbit and clocks are essential for providing high accuracy real-time PPP (Precise Point Positioning) service. However, by treating the predicted orbits as fixed, the orbital errors may be partially assimilated by the estimated satellite clock and hence impact the positioning solutions. This paper presents the impact analysis of errors in radial and tangential orbital components on the estimation of satellite clocks and PPP through theoretical study and experimental evaluation. The relationship between the compensation of the orbital errors by the satellite clocks and the satellite-station geometry is discussed in details. Based on the satellite clocks estimated with regional station networks of different sizes (∼100, ∼300, ∼500 and ∼700 km in radius), results indicated that the orbital errors compensated by the satellite clock estimates reduce as the size of the network increases. An interesting regional PPP mode based on the broadcast ephemeris and the corresponding estimated satellite clocks is proposed and evaluated through the numerical study. The impact of orbital errors in the broadcast ephemeris has shown to be negligible for PPP users in a regional network of a radius of ∼300 km, with positioning RMS of about 1.4, 1.4 and 3.7 cm for east, north and up component in the post-mission kinematic mode, comparable with 1.3, 1.3 and 3.6 cm using the precise orbits and the corresponding estimated clocks. Compared with the DGPS and RTK positioning, only the estimated satellite clocks are needed to be disseminated to PPP users for this approach. It can significantly alleviate the communication burdens and therefore can be beneficial to the real time applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The application of the CNDO and PPP-CI methods to N,N-dimethyl dithiocarbamate, O-methyl dithiocarbonate (methyl xanthate) and methyl trithiocarbonate ions for the elucidation of electronic structure and electronic spectra is described. The CNDO/2 calculations have been used to obtain the one centre core integrals of the ionic compounds required in calculating the pi electronic spectra of these molecules using the PPP method. The calculated spectra are in good agreement with the experiment. The atomic charge densities determined for alkyl xanthate, dithiocarbamate and trithiocarbonate ions support the earlier qualitative predictions regarding electronic structure from spectroscopic and other studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The low-lying singlets and triplets of biphenyl are obtained exactly within the PPP model using the diagrammatic valence bond method. The energy gaps within the singlet manifold as well as the lowest singlet-triplet gap are found to be in good agreement with experimental results. The two weak absorptions between 4·1 and 4·2 eV reported experimentally are attributed to the two states lying below the optical gap that become weakly allowed on breaking electron-hole and inversion symmetries. The observed blue shift of the spectral lines, attributed to a change in dihedral angle, on going from crystalline to solution to vapour phase is also well reproduced within the PPP model. The bond orders show that the ground singlet state is benzenoidal while the dipole excited state as well as the lowest triplet state are quinonoidal and planar. Comparison with the experimental spin densities and the fine structure constants D and E in the triplet state point to slightly weaker correlations than assumed by the PPP model. The introduction of a 1-8 bond to mimic poly(paraphenylene)s gives an optical gap that is in good agreement with experiment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Symmetrized DMRG calculations on long oligomers of poly- para-phenylene (PPP) and poly-para-phenylene vinylene (PPV) systems within a `U-V' model have been carried out to obtain the one-photon, two-photon and singlet-triplet gaps in these systems. The extrapolated gaps (in eV) are 2.89, 3.76 and 2.72 in PPP and 3.01, 3.61 and 2.23 in PPV for the one- photon, two-photon and spin gaps respectively. By studying doped systems, we have obtained the exciton binding energies. The larger exciton binding energies, compared to strongly dimerized linear chains emphasizes the role of topology in these polymers. Bond orders, charge and spin correlations in the low-lying states bring out the similarities between the lowest one-photon, the lowest triplet and the lowest bipolaronic states in these systems. The two-photon state bond orders show evidence for strong localization of this excitation in both PPP and PPV systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tetracene is an important conjugated molecule for device applications. We have used the diagrammatic valence bond method to obtain the desired states, in a Hilbert space of about 450 million singlets and 902 million triplets. We have also studied the donor/acceptor (D/A)-substituted tetracenes with D and A groups placed symmetrically about the long axis of the molecule. In these cases, by exploiting a new symmetry, which is a combination of C-2 symmetry and electron-hole symmetry, we are able to obtain their low-lying states. In the case of substituted tetracene, we find that optically allowed one-photon excitation gaps reduce with increasing D/A strength, while the lowest singlet triplet gap is only wealdy affected. In all the systems we have studied, the excited singlet state, S-i, is at more than twice the energy of the lowest triplet state and the second triplet is very close to the S-1 state. Thus, donor-acceptor-substituted tetracene could be a good candidate in photovoltaic device application as it satisfies energy criteria for singlet fission. We have also obtained the model exact second harmonic generation (SHG) coefficients using the correction vector method, and we find that the SHG responses increase with the increase in D/A strength.