891 resultados para Opera Conducting


Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper refers to issues related to the harmonic language of Claudio Monteverdi, its harmonic procedures and resulting melodic movements, its use as a dramaturgical resource and its potential allegorical meanings, based on theories and classifications of modes of the sixteenth and seventeenth centuries. At first, it approaches the matter of the multiple names and meanings of the modes and their potential allegorical references according to different authors. Secondly, it presents the analysis of two examples from his operas that deal with the representation of the death of Euridice and Clorinda (Orfeo & Il combattimento de Tancredi e Clorinda, respectively), correlating their harmonic procedures to the corresponding dramaturgical situations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper refers to issues related to the harmonic language of Claudio Monteverdi, its harmonic procedures and resulting melodic movements, its use as a dramaturgical resource and its potential allegorical meanings, based on theories and classifications of modes of the sixteenth and seventeenth centuries. At first, it approaches the matter of the multiple names and meanings of the modes and their potential allegorical references according to different authors. Secondly, it presents the analysis of two examples from his operas that deal with the representation of the death of Euridice and Clorinda (Orfeo & Il combattimento de Tancredi e Clorinda, respectively), correlating their harmonic procedures to the corresponding dramaturgical situations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research investigated the potential of folk opera as a tool for HIV and AIDS education in Papua New Guinea. It began with an investigation on the indigenous performativities and theatricalities of Papua New Guineans, conducting an audit of eight selected performance traditions in Papua New Guinea. These traditions were analysed, and five cultural forms and twenty performance elements were drawn out for further exploration. These elements were fused and combined with theatre techniques from western theatre traditions, through a script development process involving Australians, Papua New Guineans and international collaborators. The resulting folk opera, entitled Kumul, demonstrates what Murphy (2010) has termed story force, picture force, and feeling force, in the service of a story designed to educate Papua New Guinean audiences about HIV and the need to adopt safer sexual practices. Kumul is the story of a young man faced with decisions on whether or not to engage in risky sexual behaviours. Kumul's narrative is carefully framed within selected Papua New Guinean beliefs drawn from the audit to deliver HIV and AIDS messages using symbolic and metaphoric communication techniques without offending people. The folk opera Kumul was trialled in two communities in Papua New Guinea: a village community and an urban settlement area. Kumul is recognisable to Papua New Guinean audiences because it reflects their lifestyle and a worldview, which connects them to their beliefs and spirituality, and the larger cosmological order. Feedback from audience members indicated that the performance facilitated HIV and AIDS communication, increased people's awareness of HIV and AIDS, and encouraged behaviour change. Tellingly, in one performance venue, forty people queued for Voluntary Testing and Counseling immediately after the performance. Twenty of these people were tested on that night and the other twenty were tested the following day. Many of the volunteers were young men – a demographic historically difficult to engage in HIV testing. This encouraging result indicates that the Kumul folk opera form of applied theatre could be useful for facilitating communication and education regarding sexual health and safer sexual behaviours in Papua New Guinea. Feedback from participants, audience members and other research stakeholders suggests that the form might also be adapted to address other social and development issues, particularly in the areas of health and social justice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Sydney Opera House Facilities Management Exemplar Project (SOH FM Exemplar Project) aims to develop innovative research on facility management (FM) with the focus on asset maintenance. The project utilises the Sydney Opera House (SOH), one of most unique buildings in Australia, to research and create innovative FM strategies and models that will have a direct beneficial role for the Australian facilities management industry as well as the economy as a whole. The procurement, benchmarking and digitisation are crucial in improving the performance of FM. The procurement develops strategic plan and deployment framework enabling products, services, etc. meet objectives of performance, economic, environment, etc. Benchmarking is a technology used to compare practice and assess performance against the competitors recognised as industry leaders who achieve most successful activities in the field. Digitisation develops digitized FM modelling that facilitates the integration and automation of facility management. The project carries out the research on all the three areas as well as the relationship between them. It aims to develop an integrated approach for the improvement of FM performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper outlines information and advice on how a practitioner can formally pursue research pertaining to herbal or complementary medicine. It recommends five practical steps: get advice and acquire skills, find out what other people have done already, consider what research you want to do, decide on a design and finalise a detailed research plan. Enrolling in a postgraduate research degree program is recommended as a way to acquire basic research skills and obtain support for an initial project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The effects of sintering on several properties of FTO and ITO substates used in DSC have been investigated. FTO & ITO substrates were prepared with a range of sizes and aspect ratios - emulated laboratory style test cells through to prototype modules. Time and temperature of the sintering profiles were varied and sheet resistance and flatness measured. Electrical properties of the substrates were then further characterized by electrochemical impedance spectroscopy, and module sized devices were assembled and thickness variations over the device area were determined and related to performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most statistical methods use hypothesis testing. Analysis of variance, regression, discrete choice models, contingency tables, and other analysis methods commonly used in transportation research share hypothesis testing as the means of making inferences about the population of interest. Despite the fact that hypothesis testing has been a cornerstone of empirical research for many years, various aspects of hypothesis tests commonly are incorrectly applied, misinterpreted, and ignored—by novices and expert researchers alike. On initial glance, hypothesis testing appears straightforward: develop the null and alternative hypotheses, compute the test statistic to compare to a standard distribution, estimate the probability of rejecting the null hypothesis, and then make claims about the importance of the finding. This is an oversimplification of the process of hypothesis testing. Hypothesis testing as applied in empirical research is examined here. The reader is assumed to have a basic knowledge of the role of hypothesis testing in various statistical methods. Through the use of an example, the mechanics of hypothesis testing is first reviewed. Then, five precautions surrounding the use and interpretation of hypothesis tests are developed; examples of each are provided to demonstrate how errors are made, and solutions are identified so similar errors can be avoided. Remedies are provided for common errors, and conclusions are drawn on how to use the results of this paper to improve the conduct of empirical research in transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper raises some questions about teaching and teacher education in the social sciences in response to the decision to implement a national curriculum in Australia. In particular, it contends that the decision to focus on discipline-specific knowledge in the social sciences will not necessarily meet the hopes of the Melbourne Declaration and deliver a 21st century curriculum that prepares students for the future. In doing so, it suggests that social educators need to engage with the broader discourse and political context shaping the push for curriculum reform in Australia and makes reference to the marginalisation of civics and citizenship education in the latest draft of the Australian curriculum: History.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Anna Hirsch and Clare Dixon (2008, 190) state that creative writers’ ‘obsession with storytelling…might serve as an interdisciplinary tool for evaluating oral histories.’ This paper enters a dialogue with Hirsch and Dixon’s statement by documenting an interview methodology for a practice-led PhD project, The Artful Life Story: Oral History and Fiction, which investigates the fictionalising of oral history. ----- ----- Alistair Thomson (2007, 62) notes the interdisciplinary nature of oral history scholarship from the 1980s onwards. As a result, oral histories are being used and understood in a variety of arts-based settings. In such contexts, oral histories are not valued so much for their factual content but as sources that are at once dynamic, emotionally authentic and open to a multiplicity of interpretations. How can creative writers design and conduct interviews that reflect this emphasis? ----- ----- The paper briefly maps the growing trend of using oral histories in fiction and ethnographic novels, in order to establish the need to design interviews for arts-based contexts. I describe how I initially designed the interviews to suit the aims of my practice. Once in the field, however, I found that my original methods did not account for my experiences. I conclude with the resulting reflection and understanding that emerged from these problematic encounters, focusing on the technique of steered monologue (Scagliola 2010), sometimes referred to as the Biographic Narrative Interpretative Method (Wengraf 2001, Jones 2006).