1000 resultados para Open-pit mines


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Creating Lakes from Open Pit Mines: Processes and Considerations, Emphasis on Northern Environments. This document summarizes the literature of mining pit lakes (through 2007), with a particular focus on issues that are likely to be of special relevance to the creation and management of pit lakes in northern climates. Pit lakes are simply waterbodies formed by filling the open pit left upon the completion of mining operations with water. Like natural lakes, mining pit lakes display a huge diversity in each of these subject areas. However, pit lakes are young and therefore are typically in a non-equilibrium state with respect to their rate of filling, water quality, and biology. Separate sections deal with different aspects of pit lakes, including their morphometry, geology, hydrogeology, geochemistry, and biology. Depending on the type and location of the mine, there may be opportunities to enhance the recreational or ecological benefits of a given pit lake, for example, by re-landscaping and re-vegetating the shoreline, by adding engineered habitat for aquatic life, and maintaining water quality. The creation of a pit lake may be a regulatory requirement to mitigate environmental impacts from mining operations, and/or be included as part of a closure and reclamation plan. Based on published case studies of pit lakes, large-scale bio-engineering projects have had mixed success. A common consensus is that manipulation of pit lake chemistry is difficult, expensive, and takes many years to achieve remediation goals. For this reason, it is prudent to take steps throughout mine operation to reduce the likelihood of future water quality problems upon closure. Also, it makes sense to engineer the lake in such a way that it will achieve its maximal end-use potential, whether it be permanent and safe storage of mine waste, habitat for aquatic life, recreation, or water supply.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, mining dynamics is defined as the relationship between the mining rate and movement of mining operations conducted on the benches of a surface mine. This relationship describes the intensity of the pit development in space, in order to meet ore demand at the mill over time. Meeting the mill ore demand is a key factor in optimizing production scheduling in surface mines. Displacement velocity of mining operations within cutbacks, or independent pit units, is introduced in the context of long-term mine planning. Displacement velocity allows the place and time of transition of the mining operations from one independent pit unit to another to be determined as the condition for meeting the mill ore demand. An application using data from Mt Keith Nickel Operations in Western Australia is used to elaborate on the methods presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investment in mining projects, like most business investment, is susceptible to risk and uncertainty. The ability to effectively identify, assess and manage risk may enable strategic investments to be sheltered and operations to perform closer to their potential. In mining, geological uncertainty is seen as the major contributor to not meeting project expectations. The need to assess and manage geological risk for project valuation and decision-making translates to the need to assess and manage risk in any pertinent parameter of open pit design and production scheduling. This is achieved by taking geological uncertainty into account in the mine optimisation process. This thesis develops methods that enable geological uncertainty to be effectively modelled and the resulting risk in long-term production scheduling to be quantified and managed. One of the main accomplishments of this thesis is the development of a new, risk-based method for the optimisation of long-term production scheduling. In addition to maximising economic returns, the new method minimises the risk of deviating from production forecasts, given the understanding of the orebody. This ability represents a major advance in the risk management of open pit mining.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Orebody modelling, support effects and the estimation of recoverable reserves are key parts of open pit optimization studies. A case study is presented on the estimation of recoverable reserves using an implementation of indicator kriging where metal quantity is used to select cutoffs, and support corrections founded on a conditional simulation approach. Mining selectivity is explored in the subsequent optimization study to compare results from indicator kriging of grade estimates on a regular size blocks and indicator kriging estimates on small size blocks. The use of indicator kriging models adjusted for a given selectivity and the use of grade proportions in each block for the optimization study, provide a presentation of the expected ore recovery for a predefined level of selectivity. The case study shows that indicator kriging estimation with full accounting of block grade distributions generates substantially better results in the pit optimization study. In addition, the adverse effects of small blocks and over-smoothing on optimization results are illustrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Along with material characteristics and geometry, the climate in which a mine is located can have a dramatic effect on the appropriate options for rehabilitation. The paper outlines the setting, mining, milling and waste disposal at Kidston Gold Mine's open pit operations in the semi-arid climate of North Queensland, Australia, before focusing on the engineering aspects of the rehabilitation of Kidston. The mine took a holistic and proactive approach to rehabilitation, and was prepared to demonstrate a number of innovative approaches, which are described in the paper. Engineering issues that had to be addressed included the geotechnical stability and deformation of waste rock dumps, including a 240 m high in-pit dump: the construction and performance monitoring of a “store and release” cover over potentially acid forming mineralised waste rock; erosion from the side slopes of the waste rock dumps; the in-pit co-disposal of waste rock and thickened tailings; the geotechnical stability of the tailings dam wall; the potential for erosion of bare tailings; the water balance of the tailings dam; direct revegetation of the tailings; and the pit hydrology. The rehabilitation of the mine represents an important benchmark in mine site rehabilitation best practice, from which lessons applicable worldwide can be shared.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All activities of an organization involve risks that should be managed. The risk management process aids decision making by taking account of uncertainty and the possibility of future events or circumstances (intended or unintended) and their effects on agreed objectives. With that idea, new ISO Standard has been drawn up. ISO 31010 has been recently issued which provides a structured process that identifies how objectives may be affected, and analyses the risk in term of consequences and their probabilities before deciding on whether further treatment is required. In this lecture, that ISO Standard has been adapted to Open Pit Blasting Operations, focusing in Environmental effects which can be managed properly. Technique used is Fault Tree Analysis (FTA), which is applied in all possible scenarios, providing to Blasting Professionals the tools to identify, analyze and manage environmental effects in blasting operations. Also this lecture can help to minimize each effect, studying each case. This paper also can be useful to Project Managers and Occupational Health and Safety Departments (OH&S) because blasting operations can be evaluated and compared one to each other to determine the risks that should be managed in different case studies. The environmental effects studied are: ground vibrations, flyrock and air overpressure (airblast). Sometimes, blasting operations are carried out near populated areas where environmental effects may impose several limitations on the use of explosives. In those cases, where these factors approach certain limits, National Standards and Regulations have to be applied.