941 resultados para NEC Contract


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper introduces the Corporate Culture Change Cycle: a continuous innovation methodology for transforming the psychological contract in an organisational context. The eight step process is based on the action learning model. The purpose of this methodology is to benchmark the psychological contract against eight changing values of the employment relationship as a basis for facilitating a process of aligning the changing needs of employer and employee. Both the Corporate Culture Change Cycle and the New Employment Relationship Model have been validated in several organisational settings and subsequently refined. This continuous innovation methodology addresses gaps in the psychological contract, change management and continuous innovation research literatures. The approach therefore should be of interest to researchers in these fields of study and from a practical perspective for managers wishing to transform their workplace cultures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The transformation of China's urban landscape has witnessed a boom in cultural adaptation, namely the adaptation of a Western idea, the creative cluster. This chapter examines the formatting of hundreds of creative clusters-art centres, animation bases, cultural zones, and incubators. The cluster has important implications for how we understand China going forward into the second decade of the 21st century. The cluster phenomenon has resulted in to a substantive remaking of the social contract, between officials, entrepreneurs, local residents, academics-and most significantly cultural producers. However, these processes of adaption are mostly driven by real estate developers working in partnership with local government officials. Cut and paste design is the fast road to completion. In this sense, the description 'creative' may well be redundant.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is the purpose of this article to examine the means curently available to judges to achieve a workable balance between providing appropriate consumer protection to signatories of standard form contractors while still retaining adequate respect for the sanctity of contract, and, based on this analysis, to determine whether a significantly greater scope of contract (re)construction is likely to become the norm in most common law jurisdictions in the coming decades.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.