541 resultados para Montagem do proteassoma


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Comunicação - FAAC

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Música - IA

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we present the an experimental setup to check the Heisenberg uncertainty principle. The description of the experimental setup and of the theoretical foundations is aimed at promoting the familiarization of the students with the involved concepts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEIS

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing concerns about the health and safety is significantly changing the costeffective management of labor, also becoming an important tool in the pursuit of quality. In this context the present work makes a studyin a steel mill, to determine an action plan with the goal of reducing the risk of injury during handling and setting up bearings in a workshop of rolling mill rolls. The study is structured through the Method of Analysis and Troubleshooting, and quality tools. The definition of the action plan has brought lowcost measures that seek to solve the problem, eliminating the possibility of fatality or inability to employees

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Whereas the assembly torque calculation has great importance on efficiency and life of bolts, the objective of this study was to analyze the combined stresses during assembly, the friction coefficient, compare the rupture torque results with the indicated torques by standards and to present a new torque method without the stress combination (shear stress and normal stresses). For this study were carried eighteen tests with different diameters and materials, this bolts were undergoing five ranges torque until the breaking torque. With the experimental rupture torque values for each test and with the bolt quality certificate was possible to calculate the friction coefficient so compared with the theory. Another comparison was the experimental rupture torque with assembly torque indicated by NBR-8800 and ASME-PCC. The main conclusion are related to combined stress, because for this factor can fail at the assembly time, so for in some cases must use the tensioning method, because in this method won't be present torsional stresses

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on the fierce competitiveness of manufacturing companies and the planning problems arising from the lack of flexibility and forecasting demand, companies are increasingly looking to reflect on the most appropriate methods to manage its manufacture. Today it is possible to obtain higher gains and lower costs through very efficient tools, this paper uses action-research to model and implement the physical layout of a manufacturing cell, with strong theoretical basement returned to Lean Production System and acting systematically in flexibility in mounting. Through observation and joint action of the observer and staff can report problems that occurred during the phases of planning and implementation of improvements. With the improvement of the physical arrangement in the assembly was possible to obtain significant gains by reducing the production cycle, the manpower required, spending of non-compliance and increasing productivity, final product quality and health in the workplace

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work was done a study to develop a model for definition of hours assembling planes, that were able to meet both the most complete plane, i.e. with the highest number of mounts but also that do not generate an idleness on the line when a plane less complex passing on the Assembly line. The proposed model has great advantages over the current model that the company has been using, as for example: leftover hand-to-hand for assembling airplanes only 10% than the current model raises and an expense to pay the human resource/time of only 6.7% compared with the current model at the company

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work deals with the sequencing of Multi-Mixed-Model Assembly Lines in a lean manufacturing environment, where an operational structure where several kanbans support several mixed-model assembly lines, so that all assembly lines can receive parts or sub-assemblies from all suppliers. To optimize this system, the sequencing seeks to minimize the distance between the real consumption and the constant ideal consumption of parts or subassemblies, thereby reducing the scaling of kanbans and intermediate stocks. To solve the sequencing problems, the method Clustering Search was applied along with the metaheuristics Variable Neighborhood Search, Simulation Annealing and Iterative Local Search. Instances from the literature and generated instances were tested, thus allowing comparing the methods to each other and with other methods presented in the literature. The performance of the Clustering Search with Iterated Local Search stands out by the quality and robustness of their solutions, and mainly for its efficiency, whereas it converges to better results at a lower computational cost