957 resultados para Misconduct in office


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Until relatively recently, the common law offence of misconduct in public office has been regarded as anachronistic. The offence was perceived to have been supplanted by specific statutory offences that could more appropriately deal with criminal conduct by public officials. However, there has been a revival of the offence with successful prosecutions occurring in Australia, England and Hong Kong. Many of these contemporary cases have involved police officers. Examination of these cases reveals that the circumstances in which misconduct in public office has been identified have been diverse, including the unauthorised disclosure of confidential information, the use of false search warrants and the sexual exploitation of vulnerable persons. In many instances, police officers were charged with other criminal offences in addition to charges relating to misconduct in public office. The matters prosecuted as misconduct in public office typically involved matters that were serious and/or could not be adequately prosecuted as other criminal offences or as breaches of police regulations governing conduct. Consequently, despite the proliferation of statutory criminal offences in the 20th century it appears that there continues to be a place for the offence of misconduct in public office. It criminalises misconduct by police officers that may not be adequately dealt with by other offences and recognises the public trust dimension of wrongdoing by these officials. However, a continuing and fundamental challenge is to determine the appropriate definition and scope of the offence.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The economic impact of research misconduct in medical research has been unexplored. While research misconduct in publicly funded medical research has increasingly been the object of discussion, public policy debate, government and institutional action, and scientific research, the costs of research misconduct have been unexamined. The author develops a model to estimate the per case cost of research misconduct, specifically the costs of fabrication, falsification, and plagiarism, in publicly funded medical research. Using the database of Research Misconduct Findings maintained by the Office of Research Integrity, Department of Health and Human Services, the model is used to estimate costs of research misconduct in public funded medical research among faculty during the period 2000-2005.^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

AIM To investigate the number of hypertensive patients, the optometrist is able to identify by routinely taking blood pressure (BP) measurements for patients in "at -risk" groups, and to sample patients' opinions regarding in -office BP measurement. Many of the optometrists in Saudi Arabia practice in optical stores. These stores are wide spread, easily accessible and seldom need appointments. The expanding role of the optometrist as a primary health care provider (PHCP) and the increasing global prevalence of hypertension, highlight the need for an integrated approach towards detecting and monitoring hypertension. METHODS Automated BP measurements were made twice (during the same session) at five selected optometry practices using a validated BP monitor (Omron M6) to assess the number of patients with high BP (HBP) - in at -risk groups -visiting the eye clinic routinely. Prior to data collection, practitioners underwent a two-day training workshop by a cardiologist on hypertension and how to obtain accurate BP readings. A protocol for BP measurement was distributed and retained in all participating clinics. The general attitude towards cardiovascular health of 480 patients aged 37.2 (依12.4)y and their opinion towards in-office BP measurement was assessed using a self -administered questionnaire. RESULTS A response rate of 83.6% was obtained for the survey. Ninety -three of the 443 patients (21.0% ) tested for BP in this study had HBP. Of these, (62 subjects) 67.7% were unaware of their HBP status. Thirty of the 105 subjects (28.6%) who had previously been diagnosed with HBP, still had HBP at the time of this study, and only 22 (73.3%) of these patients were on medication. Also, only 25% of the diagnosed hypertensive patients owned a BP monitor. CONCLUSION Taking BP measurements in optometry practices, we were able to identify one previously undiagnosed patient with HBP for every 8 adults tested. We also identified 30 of 105 previously diagnosed patients whose BP was poorly controlled, twenty-two of whom were on medication. The patients who participated in this study were positively disposed toward the routine measurement of BP by optometrists.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objectives This efficacy study assessed the added impact real time computer prompts had on a participatory approach to reduce occupational sedentary exposure and increase physical activity. Design Quasi-experimental. Methods 57 Australian office workers (mean [SD]; age = 47 [11] years; BMI = 28 [5] kg/m2; 46 men) generated a menu of 20 occupational ‘sit less and move more’ strategies through participatory workshops, and were then tasked with implementing strategies for five months (July–November 2014). During implementation, a sub-sample of workers (n = 24) used a chair sensor/software package (Sitting Pad) that gave real time prompts to interrupt desk sitting. Baseline and intervention sedentary behaviour and physical activity (GENEActiv accelerometer; mean work time percentages), and minutes spent sitting at desks (Sitting Pad; mean total time and longest bout) were compared between non-prompt and prompt workers using a two-way ANOVA. Results Workers spent close to three quarters of their work time sedentary, mostly sitting at desks (mean [SD]; total desk sitting time = 371 [71] min/day; longest bout spent desk sitting = 104 [43] min/day). Intervention effects were four times greater in workers who used real time computer prompts (8% decrease in work time sedentary behaviour and increase in light intensity physical activity; p < 0.01). Respective mean differences between baseline and intervention total time spent sitting at desks, and the longest bout spent desk sitting, were 23 and 32 min/day lower in prompt than in non-prompt workers (p < 0.01). Conclusions In this sample of office workers, real time computer prompts facilitated the impact of a participatory approach on reductions in occupational sedentary exposure, and increases in physical activity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Little is known about how sitting time, alone or in combination with markers of physical activity (PA), influences mental well-being and work productivity. Given the need to develop workplace PA interventions that target employees' health related efficiency outcomes; this study examined the associations between self-reported sitting time, PA, mental well-being and work productivity in office employees. Methods: Descriptive cross-sectional study. Spanish university office employees (n = 557) completed a survey measuring socio-demographics, total and domain specific (work and travel) self-reported sitting time, PA (International Physical Activity Questionnaire short version), mental well-being (Warwick-Edinburg Mental Well-Being Scale) and work productivity (Work Limitations Questionnaire). Multivariate linear regression analyses determined associations between the main variables adjusted for gender, age, body mass index and occupation. PA levels (low, moderate and high) were introduced into the model to examine interactive associations. Results: Higher volumes of PA were related to higher mental well-being, work productivity and spending less time sitting at work, throughout the working day and travelling during the week, including the weekends (p < 0.05). Greater levels of sitting during weekends was associated with lower mental well-being (p < 0.05). Similarly, more sitting while travelling at weekends was linked to lower work productivity (p < 0.05). In highly active employees, higher sitting times on work days and occupational sitting were associated with decreased mental well-being (p < 0.05). Higher sitting times while travelling on weekend days was also linked to lower work productivity in the highly active (p < 0.05). No significant associations were observed in low active employees. Conclusions: Employees' PA levels exerts different influences on the associations between sitting time, mental well-being and work productivity. The specific associations and the broad sweep of evidence in the current study suggest that workplace PA strategies to improve the mental well-being and productivity of all employees should focus on reducing sitting time alongside efforts to increase PA.